0% found this document useful (0 votes)
18 views

Rtc Pages from beam

Uploaded by

Yuk Fan Lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Rtc Pages from beam

Uploaded by

Yuk Fan Lee
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Signature of Applicant (HD / PSP) :

ICU Ref. : HD(ICU) __________________


NW-EPS-SP14RR-12

ICU Approval Signature :

Signature for Record Plan :

Beam details revised

Ir S K NGAI
08/24
CSE/3

PHILIP, K.C.LAI
08/24
(DD)
ERIC, T.K LO
08/24
(SDP)
TONY, K W IP
08/24
not mach (DP)
SIDNEY, Y.P.LUI
08/24
(DOTL)

BLOCK 11 & LIFT TOWER


FIRST FLOOR BEAM DETAILS
(SHEET 12)

As indicated

SP14/12/POD/S/BM-112

COUNTERCHECKED
Signature of Applicant (HD / PSP) :
ICU Ref. : HD(ICU) __________________
NW-EPS-SP14RR-12

ICU Approval Signature :

Beam details revised


Signature for Record Plan :

TAL+0.5 beam D?

please review all


cantilever beam

Ir S K NGAI
08/24
CSE/3

PHILIP, K.C.LAI
08/24
(DD)
ERIC, T.K LO
08/24
(SDP)
TONY, K W IP
08/24
(DP)
SIDNEY, Y.P.LUI
08/24
(DOTL)

BLOCK 13
FIRST FLOOR BEAM DETAILS
(SHEET 13)

As indicated

SP14/12/POD/S/BM-173

COUNTERCHECKED

You might also like