YEAR (2024)
An INTERNSHIP REPORT ON
"110 KV SUBSTATION ALUVA"
Submitted in partial fulfillment of their requirements for the
award of
Diploma in Electrical and Electronics Engineering
Submitted by,
220KV LINES
Cochin East 1, Cochin East 2,
Pallivasal and Kothamangalam are the incoming
feeders in 220 KV substation Aluva. These 220 KV lines
connect to GIS. And then they step down the voltage
to 110 KV using two 220/110KV 200mva transformers.
110 KV LINES
110 KV lines connected to the bus bar
and distribute