0% found this document useful (0 votes)
20 views

DAY 4 Call sheet

Uploaded by

Vikas Dev
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views

DAY 4 Call sheet

Uploaded by

Vikas Dev
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

SHOOT DAY 4

DATE: 2/2/2024 Friday

KRG STUDIOS
Weather Forecast: MAX:29 ,
3rd floor, 178, 6th cross, Vajreshwari Combines, MIN:18 Total Crew - 78
Gandhinagar, Bengaluru - 560009
UNIT PRE-CALL : 6:30 AM

UNIT A - SHIFT: 9 AM, EST. WRAP: 6 PM


Producer: Karthik Gowda, Yogi G Raj, Arunabh Kumar,
Vijay Subramaniam Creative Producer: Chaitanya Kumbakonam
Breakfast: 9 AM Lunch: 1 PM Dinner:-- Midnight snacks:--

Director: Janardhan Chikanna Landmark/Location A : - Google Map Link : Prangana Executive Producers: Chethan Nanjundaiah, Vijay Koshy
(Pick-up Time - As per production for particular departments)
Writer: Deepak Venkateshan Kindly be ready 10 minutes before your individual pick-up time BASE: Mysore Line Producers: Kabira Manava, Adith A
PARKING: Same as Base CREW TOILETS: Vanity Vans & Toilets at the location
DOP: Advaitha Gurumurthy Production Designer: Vishwas Kashyap Costume Designer: Zoha Kabira Music: Vasuki Vaibhav Production Manager: Mallikarjun

Editor: KRG Associate Director: Vinay Kumar

Line Producer 1: Kabira Manava - 9449744231 Associate Director: Vinay Kumar - 7996666321 2nd Assistant Director: Chethan -9353363510

Line Producer 2: Adith A - 7022923231 1st AD: Shivaraj -9632611409 3rd Assistant Director: Manjunath -8095131887

Production Manager: Mallikarjun - 9448025644 Script Supervisor: 4th Assistant Director: Vikas Dev-9148230480 5th Assistant Director: -

TO REPORT HARASSMENT OF ANY KIND, PLEASE CONTACT : - Kabira Manava - 9449744231 - [email protected]

For any Travel/Transport queries, kindly coordinate with Mallikarjun-Production Manager

Warm Thought - “Let’s begin with a new high!” - KRG Baba

Sc No. Script Location I/E - Effect- SD Scene Description Shoot Location Actors Background Actors

Mallika goes through her wardrobe and takes out next


SC 16A Apartment INT/EXT.DAY assignment
Sharmila Mandre

1
SC 17 Wedding Hall EXT.DAY Mallika is abandoned her bridegroom on the day of wedding
Prangana Sharmila Mandre , Poojari
SC 49A Wedding Hall EXT.DAY Mallika is alone in the wedding hell ( Flashback )

SC 35 Hotel INT.NIGHT Karan and Goral girl make love and finds out about the powder. Anirudh , Gora Girl

Sl No. Character Cast Pick Up On Location Hair/ Makeup/ Wardrobe On Set

Primary Cast Call Time (Total No: 2 )

1 Mallika Sharmila Mandre 6:20 AM 7:00 AM 8:30 AM 9:00 AM

2 Karan Anirudh Acharya 1:15 AM 2:00 AM 2:30 AM 2:40 AM

Secondary Cast Call Time (Total No: 1)

3 Gora Girl 1:15 AM 2:00 AM 2:30 AM 2:40 AM

Tertiary Cast Call Time/ Featured Extras (Total No: 1)

4 Poojari 6:20 AM 7:00 AM 8:30 AM 9:00 AM

Background Actors - (Total No: 1) (Coordinator Name & Details - Shivu - 9980252535)

Total Count - 1 As per the coordinator As per the coordinator

NO PHOTOGRAPHY ON SETS

DEPARTMENT CALL TIME & REQUIREMENT

Department Pre Call Requirements

PRODUCTION

DIRECTION Scene papers for Artist

CAMERA & DIT Arri Alexa Super 35 , Signature Prime Lenses , Signature Zoom Lens

LIGHTING & GRIPS At Actuals

SPECIAL EQUIPMENTS Jimmy,Gimble

SET DRESSING & ART Wardrobe , Cloth hanger , Boxes with assignment label, Clothes ,Mallika Phone

MAKEUP / HAIR / TATTOO / PROSTHETICS Mehendi (Sharmila Mandre)

SOUND

COSTUME

VFX

ACTION REQUIREMENTS / WEAPONS / SFX

VEHICLES/ ANIMALS

STILLS/ MAKING

FACILITIES Walkie Talkie , Mike & Speaker

SPECIAL REQUIREMENT

SECURITY & SPOT

CATERING Breakfast: 9 AM Lunch : 1 PM Dinner: -- Midnight snacks: --

PRODUCTION NOTES : Running Craft Service, Water / Tea through the day. 1). GARBAGE TO BE THROWN ONLY IN GARBAGE CANS! KEEP THE WHOLE SET CLEAN!!! 2). MOBILE PHONES TO BE SILENT ON SET AT ALL TIMES. 3). PLEASE CHECK THE ADVANCE SCHEDULE FOR ANY CHANGES. 4). NO
SMOKING/EATING/DRINKING INTERIOR SET. 5). KINDLY REFER TO ALL CREW MEMBERS BY THEIR NAME AND NOT THEIR DEPARTMENT. 6). PLEASE BE READY 5 MINS BEFORE PICK UP TIME. PEOPLE WHO ARE LATE WILL HAVE TO MAKE THEIR OWN WAY TO THE LOCATION. 7). NO PHOTOGRAPHS TO
BE TAKEN DURING SHOOT AND UPLOADED ON ANY SOCIAL NETWORKING SITES. 8). IT'S A SYNC SOUND SET UP, KINDLY MAINTAIN DISCIPLINE 9). KINDLY SUBMIT YOUR WALKIES BEFORE LEAVING THE SET. 10). CREW TO WEAR BADGES AND CLOSED FOOTWEAR ON SET. 10). KINDLY RECYCLE PAPER
OR ANY DRY WASTE. 11) NO OUTSIDERS ALLOWED ON SET. 12) KINDLY MAINTAIN DISCIPLINE ON SET 13) REQUESTING EVERYONE TO STRICTLY ADHERE TO BREAK TIMINGS .

THANK YOU FOR HELPING YOURSELF AND THOSE AROUND YOU!

You might also like