BOQ of Substation
BOQ of Substation
Qty Quantity
Sl.No. Location / Reference Remarks
Nos. RM m² m³ MT
1 Earth work excavation (in cum) 14267.950 14267.950
Levelling and compaction the excavated area
2 4649.650 4649.650
(sq m)
3 Laying of 1000 gauge polythene sheet(sqm) 4649.650 4649.650
Page 1 of 4
Date:
Qty Quantity
Sl.No. Location / Reference Remarks
Nos. RM m² m³ MT
Glass block with accessarires including
34 142.600 142.600
''L''angle,flat bar etc (Sqm)
Calcium Silicate bricks and accessories with 50
35 1337.500 1337.500
mm insulation board (Sqm)
Kitchen Equipments including kitchen
36 1.000 1.000
cabinets(Nos)
37 Aluminium windows and ventilators (Sqm) 2.000 2.000
Interlock tiles for pavement icluding laying
38 468.450 468.450
and compaction etc complete (Sqm)
Kerb stones for Pavement and Road including
39 707.000 707.000
laying and compaction(Rm)
Roof tiles including polythene sheet and
40 1944.938 1944.938
insulation board etc (Sqm)
Acid proof tiles including adhesives and tile
41 330.960 330.960
grout (Sqm
42 Ceramic tiles including grouting etc (Sqm) 123.000 123.000
Page 2 of 4
Date:
Qty Quantity
Sl.No. Location / Reference Remarks
Nos. RM m² m³ MT
65 Precast wall(Sqm) 1030.675 1030.675
93 Cast iron steps heavy duty for man holes (Nos) 50.000 50.000
Page 3 of 4
Date:
Qty Quantity
Sl.No. Location / Reference Remarks
Nos. RM m² m³ MT
Page 4 of 4