Cv Highway Dpm Prasenjit Ghosh (1)

Uploaded by

avinash47399
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
329 views5 pages

Cv Highway Dpm Prasenjit Ghosh (1)

Uploaded by

avinash47399
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 5

CURRICULUM VITAE

Post Applied For : Deputy project manager


Name : PRASENJIT GHOSH
Profession : Civil Engineering
Date of Birth : 2nd May 1991
Nationality : Indian
Current position : Sr Highway Engineer – Highway incharge
Mailing Address : S/o. - Sannyasi Ghosh
Vill. + P.O.- GopiKanta Pur
Sanmukhi, Dist.- Bankura (West Bengal) 722207
Email-ID : [email protected]
Contact No : 09434530976 & 09749562285
KEY QUALIFICATIONS

Having 11th+ years of professional experience in Construction of PWD-SH-NHAI


Highway & Expressway Projects.

● Construction of Flexible pavement & Rigid pavement i.e., Embankment, Sub grade,
Sub-base (GSB), Dry lane cement (DLC) and PQC (pavement quality concert).
● Construction of different layers i.e., Embankment, High Embankment, Measurements
of Toe- line & Toe- line Marking, Sub-grade (S.G), Sub-base (GSB), Cement treated sub-base
(CTSB), Cement Treated base (CTB), Aggregate Impact Layer (A I L), course (WMM) and
Bituminous layers (DBM, BM, SDBC and BC & SM ).
● I am thoroughly familiar with the various standards/specifications under MorT&H,
IRC, IS and FIDIC Conditions of Contract.
● Preparation of IPCs and MPR reports.
● To check the suitability of Borrow areas / Quarries from which samples collected for
construction of Embankment, Sub-grade, Granular sub-base, Base course and Bituminous
materials etc. for Flexible / Rigid Pavements and concrete works as per quality
assurance/quality control plan.
● To check every layer of field dry density (FDD/MDD) for construction of Embankment & Sub-
grade layer.

● Cross check Level of every layers i.e, Embankment, S.G, GSB, CTSB, CTB, AIL, DBM & BC, And
Maintain thickness of each layers.
● Planning of the resources,Machinery and Manpower for requirement of the
work at site.
-----------------------------------------------------------------------------------------------------------------------------------------------------------
Page 1 of 5
● Area grading and Land development.
● Study the drawing and verify the layout marking.
● Coordinate with surveyor to get the quantity estimate.
● Coordinate with Testing Laboratory for establishing OMC, MDD for the soil
- sample.
● Supervise the area grading, verify the compaction, filling layers and proper -
level of cutting activity.
● Establish requirements of contractor resources.
● Coordinate with contractor and Estimate the requirement of man power and
- other resources.
● Ensure day to day execution, study of project standards, Specifications.
● Ensure proper stacking and storing of materials.
● Ensure foundations and other civil activities are executed as per drawing.
● Ensure surveyor's activity on day to day work like marking of coordinates, RL -
etc.
● Generate request for civil construction materials and coordinate with central civil
Group/ Batching plant for its availability.
● Good conversations with section Incharge, Engineer, supervisor & workers.
● Timely Submit OGL, PCL, M.B, and top level in billing department for RA Bill of all
earthworks contractor/vendor in last end of the month.
● Road marking work , Direction board and safety board fixing as per drawing & looking
for all type of Metal beam crash barrier (MBCB) work.
● Direct report to GM sir

Educational Qualification:
A. Diploma -2014 & Bachelor of Technology (B.TECH.), Civil Engineering
Maulana Abdul Kalam azad university of technology -West Bengal with1st division.
B. 12th pass, 2009 from WBSCVET with 1st division.
C. 10th pass, 2007 From WBBSE with 2nd division.
D. Other Educational Skills:
M.S. OFFICE.
Comfortable with all series of windows.
Measurements, Quality of work.

-----------------------------------------------------------------------------------------------------------------------------------------------------------
Page 2 of 5
Employment Record
PROJECT. 5 :-
Working Period : 03/04/2023 to Till Date
Employer : S P singla construction Pvt Ltd
Supervision Consultants : EGIS International SAS and EGIS India Consulting Engineers
Pvt. Ltd.
Client : Public Work Road Department-Govt. of Assam
Position : SR Highway Engineer
Project Details : Improvement and upgradation of road from Balichapori,
Majuli to Bongalmara, Lakhimpur, including construction of two major bridges over Luit and
Subansiri rivers on EPC mode
PROJECT COST : 994 Crore
PROJECT.4 :-
Working Period : 17/06/2019 to 27/03/23
Employer : MKC infrastructure Ltd
Supervision Consultants : International consultant and technocrats pvt Ltd
Client : National Highway Authority of India (NHAI)
Position : Sr Highway Engineer
Project Details : Construction of eight lane access - controlled expressway
from rajasthan/mp border to jodmi village of mandsaur district ( ch 452+420 to 484+420
design (ch 0+000 to 32+000) section to Delhi to vadodara Greenfield alignment (NH-148N )
under bharatmala pariyojana in the state madhya pradesh.
PROJECT COST : 1062 Crore
Activities Performed : Highway In-charge From Km 8+000 to16+000 Km
● Monthly Tergat SG,GSB,WWW,DBM,BC,SMA
● To execute and Supervision of the various component of road works viz, Clearing &
grubbing, Earthwork (Embankment and Sub grade), Granular sub base, WMM, DBM and BC
as per MORTH specification.
● All administration work at site and proper utilization of men power and machineries.
● Responsible for regulating the construction process on various activities like
earthwork, sub base/base course, bituminous pavements works proposed being carried out
under stipulated specifications/manuals etc. conducting
● tests on completed items of pavement, conducting tests on raw materials for
road construction, identifying borrow areas locally available to suit with the technical
specification with complete soil studies such as liquid limit, plastic limit, plasticity index, max
-----------------------------------------------------------------------------------------------------------------------------------------------------------
Page 3 of 5
dry density, optimum moisture content, preparing sub contractors bills and making entry
M.B.'s etc.
● To execute and supervision of the miscellaneous activity of protection of road i.e. Side
slope, Turfing, Kerbs, Stone pitching with chute drain, safety barriers and Maintenance works
as per MORTH specification.
● Assist the design Engineer for finalizing location plan of Truck bay, Bus bays, Junctions,
Metal T- beam & Diversions etc.
● To maintaining of daily progress report of all activities of site, and monthly mpr
reporting.
● Ensure for traffic safety ( sign boards, road marking , barricades ) at all times at site as
per MORT &H specifications.
PROJECT.3 :-
Working Period : 20/02/2017 to 05/06/2019
Employer : Dineshchandra RAgrawal Infracon Private Limited
Supervision Consultants : LN Malviya Pvt Ltd
Client : National Highway Authority of India (NHAI )
Position : Sr Highway Engineer
Project Details : Rehabilitation and up - graduation to existing road to 2lane
with paved shoulder configuration of NH32 ( From km 70+524 to km 84.400 and from km
94.300 to km 153.703) in puruliya ( JHR border) - balrampur - chandil ( junction with NH-33)
section in the state of West Bengal and jharkhand under NHDP IV-B on EPC - mode.
Project Cost : 708 Crore
Activities Performed : Responsible for clearing & grubbing, in ordinary soil & rock
excavation, embankment preparation in ordinary soil and rock fill, sub–grade preparations,
GSB,WMM ,DBM ,BC & Tomorrow Working Planing .
Also responsible for installations of metal beam crash barrier and pedestrian
guard rail between main carriageway and service road improvement of existing junction and
constructing new one execution of work as per drawing and maintain strict quality.
control in execution of work as per (MORT&H) specifications etc.…

PROJECT 2 :-
Working Period : 11/06/2015 to 14/02/2017
Employer : Dilip Buildcon Ltd
Supervision Consultants. : VRT Pvt Ltd
Client : National Highway Authority of India (NHAI )
Position : Highway Engineer
Project Details : NH-166, Borgaon to Watambera Road Project - Maharashtra
Project Cost : 1030 Crore.
-----------------------------------------------------------------------------------------------------------------------------------------------------------
Page 4 of 5
Activities Performed : Responsible for clearing & grubbing, in ordinary soil & rock
excavation, embankment preparation in ordinary soil and rock fill, sub–grade
preparations , GSB, DLC & PQC.

PROJECT:- 1
Working Period : 07/01/2013 To 02/06/2015
Employer : Vasu Enterprise pvt Ltd
Client : Public Works Department (PWD) West Bengal
Position : JE.Highway Engineer
Project Details : Widening and strengthening of intermediate lane Existing
Carriageway to Two lane Carriageway in S.H Standard from 36.00 Kmp to 54.00 Kmp of
Kotulpur-Arambagh Road and widening & Strengthening and Paved Shoulder of Drakeswar
Bridge Approach Road with Rotary at Palishree & Kalipur in the District of Hooghly Under
Entry Tax.
Activities Performed : Responsible for clearing & grubbing, in ordinary soil & rock
excavation, embankment preparation in ordinary soil and rock fill, sub–grade preparations,
GSB, WMM, DBM, BC
Project Cost : 113 Crore
CERTIFICATION : I, the undersigned, certify that to the best of my knowledge and belief, this
CV correctly describes my qualifications, my experience and me.

** I BEG MOST RESPECTFUIIY TO STATE THAT I AM PRASENJIT GHOSH, DEPARTMENT - " Highway" & DESIGNATION -
" Deputy Project Manager"
Notes : --- A) Gross Salary --- RS 85700 / Month’s + Family Accommodation
B) Notice Period --- 15 Day’s

DATE : 11/11/2024
PLACE : Lakhimpur (Assam) Signature
Prasenjit Ghosh