The Office of Facilities Planning has streamlined certain procedures in order to shorten
the time for review and approval of projects. When a school district is proposing to create
additional educational space in the form of a new school building or an addition to an existing
building, a preliminary submission is required. The requirements for a preliminary submission
of such a project remain the same except for the requirement for submitting an updated copy of
the district's Long Range Facilities Plan and Educational Specifications. (Please note that in
compliance with Section 155.1 of the Commissioner's Regulations, the district must still
maintain this Long Range Plan and update it annually.)
The Long Range Plan (LRP) is a multipurpose document that has proven to be a valuable
tool for districts to use in planning for the future by assessing enrollment projections, evaluating
the district's grade organization, reviewing the use of existing buildings, evaluating the need for
replacing obsolete and/or aging facilities, and determining the need for additional facilities.
It has become increasingly evident that the LRP is an important document in determining
the need for additional space, but at times additional information is needed to justify an addition
or new building. The Office of Facilities Planning will now require districts to include a
FACILITIES NEEDS ASSESSMENT SUMMARY as part of the preliminary submission in lieu
of the LRP itself. The format for the FACILITIES NEEDS ASSESSMENT SUMMARY is as
follows:
Please note that there is no actual form for this document--simply follow the
requirements outlined above. If additional spaces are not justified in the FACILITIES NEEDS
ASSESSMENT SUMMARY, they will not be eligible for Building Aid. The district must be
able to clearly explain the need for any proposed new space. Furthermore, although we are no
longer requiring that a copy of the LRP be submitted as part of the preliminary submissions, the
Project Manager may, at his/her discretion, request that a copy of the entire LRP be submitted
along with the SUMMARY.