Procedure for ECBC Compliance Form-A (Design Stage)
Procedure for ECBC Compliance Form-A (Design Stage)
A
Certificate from ECBC Expert / Design Professional to be enclosed with the
application for Building Permit for ECBC Compliant Building Certificate
I am ECBC Expert / Design Professional having registration no. /_______under the Energy
Conservation Act 2001 and am/are authorized to scrutinize and verify the design of ECBC
Compliant Building. I certify that –
(a) I have scrutinized the construction documents duly signed by the owner /
Architect showing all the pertinent data and features of the building, equipment
and systems in sufficient details covering Building Envelop, HVAC, Service hot
water, Lighting and Electrical power in accordance with Punjab ECBC in respect
of building proposed to be constructed on plot on ___________block no._________
Scheme in the city of _________in the State of __________; (Annexure 1)
(b) I have scrutinized the compliance forms together with the checklists (Annexure-2)
to ensure compliance with the Punjab ECBC.
(c) ECBC Compliance Report incorporating the proposed energy conservation
measures have been duly checked and verified by the undersigned. The Energy
Performance Index Ratio of the building design as per construction documents at
the design stage are equal to or less than one and are therefore in compliance with
the Punjab ECBC (Annexure 3).
(e) It is certified that all the required scrutiny and verification of the documents
submitted have been carried out diligently and truthfully and all reasonable
professional skill, care and diligence have been taken in scrutinizing and verifying
the drawings of the buildings and compliance forms together with checklists
covering the various components of the Punjab ECBC. This complies with the
requirements of Punjab ECBC and supporting data is attached. (Annexure 5)
(f) The contents of all the documents submitted along with the application are a true
representation of the facts and nothing has been concealed.
Date
Signature Signature
Building Owner/Applicant Name of the ECBC Expert / Design Professional
Registration no. with SEAL
Enclosures:
Annexure-1 – Building Details Proforma
Annexure-2 – Punjab ECBC Compliance Forms (Summary + Checklists)
Annexure-3 – ECBC Compliance Report at design stage (including Simulation report, if applicable)
Annexure-4 – Certificate of BEE Empanelled ECBC Expert/Design Professional
Annexure-5 – Project Data for all applicable systems
1
PROJECT DATA REQUIREMENTS FOR PUNJAB ECBC
Following are the list of documents required for the compliance of Punjab ECBC at design stage:
Annexure-4
Certificate of BEE Empaneled ECBC Expert/Design Professionals
☐
or BEE Certified ECBC Master Trainers
2
Annexure-1
Name of Owner -
Owner’s Address -
7 Owner’s Details
Owner’s Contact Number -
Owner’s Email Id -
Name of Architect -
Architect Address -
8 Architect Details
Architect Contact Number -
Architect Email Id -
Project Comes Under Name -
(Corporation/Council/Committee/
9
Authority/Nagar Panchayat) with Address -
Address
Any other Information related to
10
the building
Name & Contact Number of the
11
Nodal Officer In-charge
3
Annexure-2
Applicant Name
Applicant Address
Applicant Phone
Project Description □ New Building □ Addition □ Alteration □ Change of Use
□ Hospital, hotel, call center (24 hour) □ Other building types (daytime)
Vertical Total Vertical divided Gross exterior times 100 %vertical
Fenestration Area Fenestration Area by wall area equals fenestration
Calculations (rough opening)
Hospital, hotel, call center (24 hour) Other building type (daytime)
OPAQUE ASSEMBLY OPAQUE ASSEMBLY
Roof Minimum Insulation R- Roof Minimum Insulation R-
value value
Wall Minimum Insulation R- Wall Minimum Insulation R-
value value
FENESTRATION FENESTRATION
Vertical Vertical
Maximum U-factor Maximum U-factor
Maximum SHGC (or SC) Maximum SHGC (or SC)
Overhang (yes or no) Overhang (yes or no)
If yes, enter Projection Factor If yes, enter Projection Factor
Side fins (yes or no) Side fins (yes or no)
If yes, enter Projection Factor If yes, enter Projection Factor
Skylight Skylight
Maximum U-factor Maximum U-factor
Maximum SHGC (or SC) Maximum SHGC (or SC)
4
Form 3 - Building Permit Plans Checklist
Building Permit Plans Checklist Envelop Checklist
The Punjab Energy Conservation Code Compliance Forms
5
Form 4 - Mechanical Summary
Mechanical Summary
The Punjab Energy Conservation Code Compliance Forms
Applicant Name:
Applicant Address:
Applicant Phone:
Project
Description
Briefly describe
mechanical system
type and features.
□ Includes Plans
Compliance □ Simple □ Prescriptive □ Whole Building
option
Equipment The following information is required to be incorporated with the mechanical equipment
Schedules schedules on the plans. For projects without plans, fill in the required information below
6
Form 5 - Mechanical Permit Checklist
Mechanical Permit Checklist Mechanical Checklist
The Punjab Energy Conservation Code Compliance Forms
7
Indicate heat trap on drawings or provide
6.2.5 Heat traps manufacturers specifications to show that
equipment has internal heat trap
6.2.6 Pool covers Provide vapor retardant cover for pools
6.2.6 Pool over 32° C Provide R-2.1 insulation
Total Proposed Watts may not exceed Total Allowed Watts for
Total Proposed Watts
Interior
Maximum Allowed Lighting Wattage (Exterior, Section 7.4)
Location Description Allowed Watts/m2 Area in m2 Allowed watts x
(or lm for m2
perimeter) (or x lm)
8
Total Proposed Watts may not exceed Total Allowed Watts for Interior Total
Proposed Watts
9
Form 7 - Lighting Permit Checklist
Lighting Permit Checklist Lighting Checklist
The Punjab Energy Conservation Code Compliance Forms
10
Form 8 - Whole Building Performance Method Compliance Report
Advisory Message
Proposed Standard Difference
Design Design
Number of hours of heating loads unmet( system /plant)
Number of hours of cooling loads (system/plant)
Number of warnings
Number of errors
Number of defaults
Process lighting
Lighting occupant sensor controls
Day lighting controls
Receptacle equipment
11
Elevators or escalators
Re-refrigeration equipment
Other process loads
Mechanical and plumbing systems
HVAC systems Variable air volume Constant air volume
Design supply air temperature
differential
Fan Control
Fan Power
Economizer Control
Demand control ventilation
Unitary Equipment cooling efficiency
Unitary Equipment heating efficiency
Chiller type, capacity and efficiency
Cooling tower
Boiler efficiency
Chilled water loop and Pump
parameters
Condenser water loop and Pump
parameters
Hot water loop and pump parameters
Domestic Hot Water pump parameters
12
Form 9 – End Use Summary
13
Form 10 – Energy Summary by End Use
14
Annexure-5
Form 11
I - BUILDING ENVELOPE
Section 4 Compliance Forms with:-
1. DRAWINGS
☐ Floor Plans
☐ Door-Window Schedule
☐ Section Drawings
☐ Façade Wall and Roof Sections with material description and K-Value Marking
2. CALCULATIONS
3. DATA SHEETS
15
Form 12
II – HVAC
Section 5 Compliance Forms with:-
4. DRAWINGS
☐ Summary on provision done as per NBC 2005 Part 8, Section 1 for natural ventilation spaces.
☐ Proposed HVAC system details (Mechanical Schedules) with mentioning star rating and COP.
5. CALCULATIONS
6. DATA SHEETS
☐ Door Closer
☐ Pump used at cooling tower and closed circuit (Mentioning the efficiency and VFD specs)
16
Form 13
7. DRAWINGS
8. CALCULATIONS
☐ Hot water requirement in building and solar hot water provision (min 20%) calculation.
9. DATA SHEETS
17
Form 14
10. DRAWINGS
☐ Lighting drawings, showing the provision of occupancy sensors in the applicable spaces.
☐ Lighting layout showing the location of lighting fixtures, mentioning the type and wattage of the fixtures.
11. CALCULATIONS
☐ Lighting Power Density Calculation for interior spaces and exterior spaces.
☐ Exterior Lighting fixtures/Street Lights in the campus with its specification (Time based or a photo sensed based).
☐ Exterior Ground Lighting Fixtures with the information of its luminous efficacy (lm/W).
13. DRAWINGS
☐ Transformer details with the information of its type, capacity and losses at 50% and 100% loading.
☐ Power Factor or APFC (Automatic Power Factor Controller) with the specification.
☐ Meter details having the provision to display the kVA, kWh, PF, current, voltage, THD.