0% found this document useful (0 votes)
42 views

Procedure for ECBC Compliance Form-A (Design Stage)

ECBC Compliance

Uploaded by

verma.ankita91
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
42 views

Procedure for ECBC Compliance Form-A (Design Stage)

ECBC Compliance

Uploaded by

verma.ankita91
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 18

Form No.

A
Certificate from ECBC Expert / Design Professional to be enclosed with the
application for Building Permit for ECBC Compliant Building Certificate

I am ECBC Expert / Design Professional having registration no. /_______under the Energy
Conservation Act 2001 and am/are authorized to scrutinize and verify the design of ECBC
Compliant Building. I certify that –
(a) I have scrutinized the construction documents duly signed by the owner /
Architect showing all the pertinent data and features of the building, equipment
and systems in sufficient details covering Building Envelop, HVAC, Service hot
water, Lighting and Electrical power in accordance with Punjab ECBC in respect
of building proposed to be constructed on plot on ___________block no._________
Scheme in the city of _________in the State of __________; (Annexure 1)
(b) I have scrutinized the compliance forms together with the checklists (Annexure-2)
to ensure compliance with the Punjab ECBC.
(c) ECBC Compliance Report incorporating the proposed energy conservation
measures have been duly checked and verified by the undersigned. The Energy
Performance Index Ratio of the building design as per construction documents at
the design stage are equal to or less than one and are therefore in compliance with
the Punjab ECBC (Annexure 3).
(e) It is certified that all the required scrutiny and verification of the documents
submitted have been carried out diligently and truthfully and all reasonable
professional skill, care and diligence have been taken in scrutinizing and verifying
the drawings of the buildings and compliance forms together with checklists
covering the various components of the Punjab ECBC. This complies with the
requirements of Punjab ECBC and supporting data is attached. (Annexure 5)
(f) The contents of all the documents submitted along with the application are a true
representation of the facts and nothing has been concealed.

There is no objection for issue of Building Permit in respect of the aforesaid


proposed Building in so far as requirements of Punjab ECBC are concerned.

Date

Signature Signature
Building Owner/Applicant Name of the ECBC Expert / Design Professional
Registration no. with SEAL

Enclosures:
Annexure-1 – Building Details Proforma
Annexure-2 – Punjab ECBC Compliance Forms (Summary + Checklists)
Annexure-3 – ECBC Compliance Report at design stage (including Simulation report, if applicable)
Annexure-4 – Certificate of BEE Empanelled ECBC Expert/Design Professional
Annexure-5 – Project Data for all applicable systems

1
PROJECT DATA REQUIREMENTS FOR PUNJAB ECBC

Following are the list of documents required for the compliance of Punjab ECBC at design stage:

S.No. Project Requirements Annexure

☐ Building Details Proforma (Form-1) Annexure- 1

ECBC Compliance Forms (including Summary & Checklist) Annexure- 2



(Forms 2-10)

ECBC Compliance Report (including Whole Building Energy Annexure-3



Simulation report, if applicable)

Annexure-4
Certificate of BEE Empaneled ECBC Expert/Design Professionals

or BEE Certified ECBC Master Trainers

Project Data Requirements for all 5 Building Applicable Systems Annexure-5

☐ (Building Envelope, HVAC, Lighting, Service Hot Water and

Electrical Systems) (Form 11-14)

2
Annexure-1

Form 1- Building Details Proforma


S. No. Description Project Details
1 Name of Building
2 Location with Address
Building Type
3 (Hotel/Mall/Hospital/Building
Complex/Retail/IT/Office)
Project Type
4 (New Building/Addition/Alteration/
Change of Use)
Plot Area (sq. ft.) -
5 Building Area
Built-up Area (sq. ft.) -
6 No. of Floors in Building

Name of Owner -

Owner’s Address -
7 Owner’s Details
Owner’s Contact Number -

Owner’s Email Id -

Name of Architect -

Architect Address -
8 Architect Details
Architect Contact Number -

Architect Email Id -
Project Comes Under Name -
(Corporation/Council/Committee/
9
Authority/Nagar Panchayat) with Address -
Address
Any other Information related to
10
the building
Name & Contact Number of the
11
Nodal Officer In-charge

Signature of the Applicant

3
Annexure-2

Punjab ECBC Compliance Forms


Form 2 - Envelope Summary
Envelop Summary
The Punjab Energy Conservation Code Compliance Forms

Project Info Project Address Date


For Building Department Use

Applicant Name
Applicant Address
Applicant Phone
Project Description □ New Building □ Addition □ Alteration □ Change of Use

Compliance option □ Prescriptive □ Envelope Trade off (Appendix D) □ Whole


Building

□ Hospital, hotel, call center (24 hour) □ Other building types (daytime)
Vertical Total Vertical divided Gross exterior times 100 %vertical
Fenestration Area Fenestration Area by wall area equals fenestration
Calculations (rough opening)

Note: Vertical fenestration ÷ ×100


area cannot exceed 40% of the
gross wall area for
prescriptive option
Skylight Area Total Skylight Area divided Gross exterior times 100 %vertical
Calculation (rough opening) by wall area equals fenestration

Note: Skylight area cannot


exceed 5% of the gross roof
area for prescriptive ÷ ×100
compliance

Hospital, hotel, call center (24 hour) Other building type (daytime)
OPAQUE ASSEMBLY OPAQUE ASSEMBLY
Roof Minimum Insulation R- Roof Minimum Insulation R-
value value
Wall Minimum Insulation R- Wall Minimum Insulation R-
value value
FENESTRATION FENESTRATION
Vertical Vertical
Maximum U-factor Maximum U-factor
Maximum SHGC (or SC) Maximum SHGC (or SC)
Overhang (yes or no) Overhang (yes or no)
If yes, enter Projection Factor If yes, enter Projection Factor
Side fins (yes or no) Side fins (yes or no)
If yes, enter Projection Factor If yes, enter Projection Factor
Skylight Skylight
Maximum U-factor Maximum U-factor
Maximum SHGC (or SC) Maximum SHGC (or SC)

Owner/s ECBC Experts / Design Professional

4
Form 3 - Building Permit Plans Checklist
Building Permit Plans Checklist Envelop Checklist
The Punjab Energy Conservation Code Compliance Forms

Project Address Date


The following information is necessary to check a building permit application for compliance with the building
envelop requirements in The Punjab Energy Conservation Building Code.
Applicability Code Component Information required Location Building
(yes, no, n.a.) Section on Plans Departments
Notes
MANDATORY PROVISIONS (section 4.2)
Fenestration
4.2.1
rating
Specify whether per 4.2.1.1 or default
4.2.1.1 U-factor
in Appendix C
4.2.1.1 Specify whether per 4.2.1.2 or default
SHGC
in Appendix C
4.2.1.1 Air Leakage Specify leakage rates
Opaque U- Specify whether per default in
4.2.2
factors Appendix C or ASHRAE
Bldg. envelop Indicate sealing, caulking, gasketing,
4.2.3
sealing and weather stripping
PRESCRIPTIVE COMPLIANCE OPTION (section 4.3)
4.3.1 Roofs Indicate R-values on roof sections
Indicate minimum reflectance and
Cool roof
4.3.2 emittance on plans
4.3.3 Roof Indicate R-values on wall sections
1) Indicate U-factors on fenestration
schedule. Indicate if values are rated
or default. If values are default, then
specify frame type, glazing layers,
gap-width, low-e
Vertical 2) Indicate SHGC or SC on
4.3.4
fenestration fenestration schedule. Indicate if
values are rated or default
3) Indicate if overhangs or side fins
are used for compliance purposes. If
so, provide projection factor
calculation.
1) Indicate U-factors on fenestration
schedule. Indicate if values are rated
or default. If values are default, then
specify frame type, glazing layers, gap-
4.3.5 Skylights
width, low-e
2) Indicate SHGC or SC on
fenestration schedule. Indicate if
values are rated or default
BUILDING ENVELOPE TRADE-OFF OPTION (section 4.4)
Provide Calculations

Owner/s ECBC Experts / Design Professional

5
Form 4 - Mechanical Summary
Mechanical Summary
The Punjab Energy Conservation Code Compliance Forms

Project Info Project Address: Date


For Building Department Use

Applicant Name:
Applicant Address:
Applicant Phone:
Project
Description
Briefly describe
mechanical system
type and features.
□ Includes Plans
Compliance □ Simple □ Prescriptive □ Whole Building
option
Equipment The following information is required to be incorporated with the mechanical equipment
Schedules schedules on the plans. For projects without plans, fill in the required information below

Cooling Equipment Schedule


Equipment ID Brand Model Capacity Total OSA CFM SEER IPLV Location
Name No kW L/s or Econo? or EER

Heating Equipment Schedule


Equipment ID Brand Model Capacity Total OSA CFM SEER IPLV Location
Name No kW L/s or Econo? or EER

Fan Equipment Schedule


Equipment ID Brand Model Capacity Total OSA CFM SEER IPLV Location
Name No kW L/s or Econo or EER

Owner/s ECBC Experts / Design Professional

6
Form 5 - Mechanical Permit Checklist
Mechanical Permit Checklist Mechanical Checklist
The Punjab Energy Conservation Code Compliance Forms

Project Address Date


The following information is necessary to check a building permit application for compliance with the mechanical
requirements in The Punjab Energy Conservation Building Code.
Applicability Code Component Information required Location Building
(yes, no, n.a.) Section on Plans Dept.
Notes
HEATING, VENTILATION, AND AIR CONDITION (Chapter 5)
MANDATORY PROVISIONS (Section 5.2)
5.2.2 Equipment Provide equipment schedule with type,
efficiency capacity, efficiency
5.2.4 Controls
Indicate thermostat with night setback, 3
5.2.4.1 Time clocks different day types and 2-hour manual
override
Temp. & dead Indicate temperature control with 3°C
5.2.4.2
band dead band minimum
Clg. tower, fluid Indicate two-speed motor, pony motor, or
5.2.4.3
cooler variable speed drive to control the fans
Piping & Indicate sealing, caulking, gasketing, and
5.2.5.1
ductwork weather stripping
5.2.5.1 Piping insulation Indicate R-value of insulation
Ductwork Indicate R-value of insulation
5.2.5.1
insulation
5.2.5.1 Ductwork sealing Specify sealing types and locations
5.2.6 System balancing Specify system balancing
PRESCRIPTIVE COMPLIANCE OPTION (Section 5.3)
Indicate whether project is complying
5.3 with Punjab ECBC Prescriptive Option
OR with ASHRAE Standard 90.1-2004
5.3.1 Economizer
5.3.1.1 Air economizer Indicate 100% capability on schedule
Integrated Indicate capability for partial cooling
5.3.1.2
operation
5.3.1.3 Field testing Specify tests
Variable flow
5.3.2
hydronic
Indicate variable flow capacity on
5.3.2.1 Pump flow rates
schedules
Indicate two-way automatic isolation
5.3.2.2 Isolation valves
valves
Variable speed Indicate variable speed drive
5.3.2.3
drive
SERVICE WATER HEATING AND PUMPING (Chapter 6)
Solar Water provide calculations to justify capacity to
6.2.1
Heating meet 20% threshold
Equipment Provide equipment schedule with type,
6.2.2
efficiency capacity, efficiency
6.2.4 Piping insulation Indicate R-value of insulation

7
Indicate heat trap on drawings or provide
6.2.5 Heat traps manufacturers specifications to show that
equipment has internal heat trap
6.2.6 Pool covers Provide vapor retardant cover for pools
6.2.6 Pool over 32° C Provide R-2.1 insulation

Owner/s ECBC Experts / Design Professional

Form 6 - Lighting Summary


Lighting Summary
The Punjab Energy Conservation Code Compliance Forms

Project Info Project Address Date


For Building Department
Use
Applicant Name:
Applicant Address:
Applicant Phone:
Project Description □ New Building □ Addition □ Alteration □ Change of Use
Compliance option □ Prescriptive □ System Analysis
Alteration □ Less than 50% of the fixtures are new and installed lighting wattage is not being
Exceptions increased
(check box, if appropriate)
Maximum Allowed Lighting Wattage (Interior, section 7.3)
Location (floor/room Occupancy Allowed Watt/m2 Area in m2 Allowed x area
no.) description

** Document all exceptions Total allowed Watts


Proposed Lighting Wattage (Interior)
Location (floor/room Fixture Description Number of Fixtures Watts/fixture Watts Proposed
no.)

Total Proposed Watts may not exceed Total Allowed Watts for
Total Proposed Watts
Interior
Maximum Allowed Lighting Wattage (Exterior, Section 7.4)
Location Description Allowed Watts/m2 Area in m2 Allowed watts x
(or lm for m2
perimeter) (or x lm)

Total Allowed Watts


Proposed Lighting Wattage (Exterior)
Location Fixture Description Number of fixtures Watts Watts proposed
/fixture

8
Total Proposed Watts may not exceed Total Allowed Watts for Interior Total
Proposed Watts

Owner/s ECBC Experts / Design Professional

9
Form 7 - Lighting Permit Checklist
Lighting Permit Checklist Lighting Checklist
The Punjab Energy Conservation Code Compliance Forms

Project Address Date


The following information is necessary to check a building permit application for compliance with the lighting
requirements in The Punjab Energy Conservation Building Code.
Applicability Code Component Information required Location Building
(yes, no, section on Plans Dept.
n.a.) Notes
LIGHTING (Chapter 7)
MANDATORY PROVISIONS (Section 7.2)
7.2.1 Lighting Controls
Indicate automatic shutoff locations or
7.2.1.1 Automatic shut off
occupancy sensors
Provide schedule with type, indicate
7.2.1.2 Space Control
locations
Provide schedule with type and features,
7.2.1.3 Daylight Zones
indicate locations
Ext. Lighting Indicate photo sensor or astronomical
7.2.14
Control time switch
Provide schedule with type, indicate
7.2.1.5 Additional Controls
locations
Signage/
7.2.2 Indicate 5 watts maximum
Advertizing signage
Exterior building Indicate minimum efficacy of 60
7.2.3
grounds lighting lumens/Watt
PRESCRIPTIVE INTERIOR LIGHTING POWER COMPLIANCE OPTION (Section 7.3)
Indicate whether project is complying
7.3 with the Building Area Method (7.3.1)
or the Space Function Method (7.3.2)
Provide lighting schedule with wattage
Building Area
7.3.2 of lamp and ballast and number of
Method
fixtures. Document all exceptions
Provide lighting schedule with wattage
Space function
7.3.3 of lamp and ballast and number of
method
fixtures. Document all exceptions
7.3.4.1 Luminarie Wattage Indicate on plans
PRESCRIPTIVE EXTERIOR LIGHTING POWER COMPLIANCE OPTIONS (Section 7.3.5)
Provide lighting schedule with wattage
Exterior Lighting
7.3.5 of lamp and ballast and number of
Power
fixtures. Document all exceptions.
ELECTRICAL POWER (Chapter 8)
MANDATORY PROVISIONS (Section 8.2)
Provide schedule with transformers
8.2.1 Transformers
losses
Provide equipment schedule with
8.2.2 Motor efficiency
motor capacity efficiency
Power factor Provide schedule with power factor
8.2.3
correction correction
8.2.4 Check metering Provide check metering and monitoring

Owner/s ECBC Experts / Design Professional

10
Form 8 - Whole Building Performance Method Compliance Report

Project Name Date


Project Address Telephone
Designer of record
Contact Person
City:
Weather Data:
Climatic Zone:
Total Conditioned Area(sqft) Total Unconditioned Total Floor Area (sqft)
Area(sqft)

Advisory Message
Proposed Standard Difference
Design Design
Number of hours of heating loads unmet( system /plant)
Number of hours of cooling loads (system/plant)
Number of warnings
Number of errors
Number of defaults

Additional building Information


Number of floors
Simulation program

Comparison of Input Parameters in proposed design and standard design


Building element Proposed Design Input Standard design Input
Envelop
Above Grade Wall construction(s)
Below grade construction
Roof construction
Exterior Floor construction
Slab-on-grade construction
Window to gross wall ratio
Fenestration types(s)
Fenestration Assembly U-factor
Fenestration Assembly SHGC
Fenestration Visual light transmittance
Fixed Shading devices
Automated movable shading devices
Electrical system & process loads
Ambient light power density and
lighting design description

Process lighting
Lighting occupant sensor controls
Day lighting controls
Receptacle equipment

11
Elevators or escalators
Re-refrigeration equipment
Other process loads
Mechanical and plumbing systems
HVAC systems Variable air volume Constant air volume
Design supply air temperature
differential
Fan Control
Fan Power
Economizer Control
Demand control ventilation
Unitary Equipment cooling efficiency
Unitary Equipment heating efficiency
Chiller type, capacity and efficiency
Cooling tower
Boiler efficiency
Chilled water loop and Pump
parameters
Condenser water loop and Pump
parameters
Hot water loop and pump parameters
Domestic Hot Water pump parameters

Owner/s ECBC Experts / Design Professional

12
Form 9 – End Use Summary

Standard design – End Use Summary


End Use 0º rotation 90º rotation 180º rotation 270º rotation Average
Energy Energy Peak Energy Peak Energy Peak Energy Peak Energy Peak
type (KwH) (kW) (KwH) (kW) (KwH) (kW) (KwH) (kW) (KwH) (kW)
Interior lighting Elec
Interior Lighting
Elec
(process)
Exterior lighting Elec
Space Heating Natural
(Fuel 1) gas
Space Heating
Elec
(Fuel 2)
Space cooling Elec
Pumps Elec
Heat rejection Elec
Fans Interior Elec
Fans Parking
Elec
Garage
Service Water
Natural
Heating
gas
(Fuel 1)
Service Water
Heating Elec
(Fuel 2)
Receptacle
Elec
Equipment
Refrigeration
Elec
(Food, etc.)
Cooking
commercial, Elec
(Fuel 1)
Cooking
commercial, Elec
(Fuel 2)
Elevators and
Elec
escalators
Other process Elec
Total building
consumption / Elec
demand
Total process
Elec
energy

Owner/s ECBC Experts / Design Professional

13
Form 10 – Energy Summary by End Use

Energy Summary by End Use


Proposed Design Standard Design
Energy Type Energy Peak (kW) Energy Peak Energy
(kWh) (kWh) (kW) (%)
Interior Light (Ambient) Elec.
Interior Lighting (Process) Elec.
Exterior Lighting Elec.
Space Heating (Fuel 1) Natural gas
Space Heating (Fuel 2) Elec.
Space cooling Elec.
Pumps Elec.
Heat Rejection Elec.
Fans-Interior Elec.
Fans-Parking Garage Elec.
Service Water Heating (Fuel 1) Natural gas
Service Water Heating (Fuel 2) Elec.
Receptacle equipment Elec.
Refrigeration (food, etc.) Elec.
Cooking (commercial, Fuel 1) Natural gas
Cooking (commercial, Fuel 2) Elec.
Elevators and escalators Elec.
Other process Elec.
Total building consumption

Owner/s ECBC Experts / Design Professional

14
Annexure-5

Form 11

PROJECT DATA REQUIREMENT SHEET


Following are the documents required for meeting the requirements of Project ECBC Compliance: -

I - BUILDING ENVELOPE
Section 4 Compliance Forms with:-

1. DRAWINGS

☐ Floor wise area statement

☐ Site Plan/Master Plan

☐ Floor Plans

☐ All Side Elevations

☐ Door-Window Schedule

☐ Section Drawings

☐ Façade Wall and Roof Sections with material description and K-Value Marking

2. CALCULATIONS

☐ Window to Wall Ratio Calculation and Skylight to Roof Ration Calculation.

☐ U-Value Calculation for Wall and Roof.

☐ M Factor Calculation for Overhangs/Fins (if used).

☐ Tradeoff method calculation (if opted).

3. DATA SHEETS

☐ Insulation proposed to be used in Wall and Roof with its K-Value

☐ Proposed Window/Skylight Glass (Mentioning U Value, SHGC, VLT)

☐ Proposed Roof Tile/Paint (Mentioning SRI Value).

15
Form 12

II – HVAC
Section 5 Compliance Forms with:-

4. DRAWINGS

☐ HVAC Layout showing air-conditioned area and non-air-conditioned area.

☐ Summary on provision done as per NBC 2005 Part 8, Section 1 for natural ventilation spaces.

☐ Proposed HVAC system details (Mechanical Schedules) with mentioning star rating and COP.

5. CALCULATIONS

☐ Air Side System and Hydronic System Balancing Report.

6. DATA SHEETS

☐ HVAC systems mentioning star rating or COP with IS standard.

☐ Proposed ceiling fans star rating

☐ Air circulator proposed in Air Conditioned room.

☐ Door Closer

☐ Piping Insulation (Mentioning the R value)

☐ Duct Insulation (Mentioning the R value)

☐ Pump used at cooling tower and closed circuit (Mentioning the efficiency and VFD specs)

☐ Photographs of shaded Condenser Unit.

16
Form 13

III – SERVICE HOT WATER


Section 6 Compliance Forms with:-

7. DRAWINGS

☐ Plumbing layouts showing hot water supply (Solar/Electric/Fuel) to the toilets.

8. CALCULATIONS

☐ Hot water requirement in building and solar hot water provision (min 20%) calculation.

9. DATA SHEETS

☐ Solar Water Heater with the information of its efficiency.

☐ Electric equipment with the information of its efficiency

☐ Liquid/Gas fuel based equipment with the information of its efficiency.

☐ Insulation used for piping mentioning the R value.

☐ Swimming Pool Cover insulation mentioning the R value.

17
Form 14

IV – LIGHTING & ELECTRICAL SYSTEM


Section 7 Compliance Forms with:-

10. DRAWINGS

☐ Lighting drawings, showing the provision of occupancy sensors in the applicable spaces.

☐ Lighting layout showing the location of lighting fixtures, mentioning the type and wattage of the fixtures.

11. CALCULATIONS

☐ Lighting Power Density Calculation for interior spaces and exterior spaces.

12. DATA SHEETS

☐ Exterior Lighting fixtures/Street Lights in the campus with its specification (Time based or a photo sensed based).

☐ Interior lighting fixture with its type and wattage details.

☐ Display/Demonstrating/Exit Sign lighting fixture with its wattage details.

☐ Exterior Ground Lighting Fixtures with the information of its luminous efficacy (lm/W).

☐ Master control devices for hotel buildings.

☐ Task lighting fixtures.

Section 8 Compliance Forms with:-

13. DRAWINGS

☐ Transformer details with the information of its type, capacity and losses at 50% and 100% loading.

☐ Motors with the information of its class and efficiency.

☐ Power Factor or APFC (Automatic Power Factor Controller) with the specification.

☐ Meter details having the provision to display the kVA, kWh, PF, current, voltage, THD.

☐ Power cable specifications (Max 1% losses).