03 4D 5D modeling
03 4D 5D modeling
2nd Floor
1st Floor
Perspective Rendering
An Example of 4D/5D Modeling 6
VICO Office
• Create the project virtually before build it in reality
– An accurate building model to drive estimating and construction
planning
• Organized in modules
– VO client
– Constructability manager
– Takeoff manager
– Cost planner
– Cost explorer
– Schedule planner
– LBS manager
– Production controller
AResources
There
recipeare
is aare
several
specific,
identifiable
stages
identifiable
to
parts
build
of
part
aa column.
process
of a building,
In
that
this
canin
case,
this
be priced.
we
casesayitIn
is
putting
this
a column.
example,
reinforce
There
webars,
may
say
be
forming,
more
pouringthan
concreting,
concrete
one type needs
and
of columns
cladding.
three resources:
inEach
a project,
stage
concrete
entitles
in terms inacubic
of
construction
size,meters,
shape,method,
labour
material,
inforor
buildingman*hours,
method;
example,
each
and ofequipment
pouring
them entitles
concrete.
in piece*hours.
a specific recipe.