Why BSVI ?
Bharat stage norms ?
Introduced in the year 2000, the Bharat stage norms are emission control standards put in place by the
government to keep a check on air pollution. Based on the European regulations (Euro norms), these standards
set specifications/limits for the release of air pollutants from equipment using internal combustion engines,
including vehicles. Typically, the higher the stage, the more stringent the norms.
Bharat Stage Norms. Bharat stage (BS) emission standards are emission standards instituted by Central
Government to regulate the output of air pollutants from internal combustion engine equipment, including
motor vehicles. ... These standards are based on European regulations were first introduced in 2000.
Bharat Stage standards up to
BS-VI Norms: 2020
•Particulate matter emission in BS-V and
BS-VI is same for diesel Vehicles though it
is 80% less than BS IV.
3
BS VI Technology
4
Visual Clarification of BSIV & BSIV Muffler part
BSIV ENGINE BSVI ENGINE
5
BS VI Technology
Comparison of BS4 (Muffler) & BS6 (EATS)
6
UPCOMING BASE VARIANTS OF 20.15 BSVI
3. 20.15 H LP NAC
4. 20.15 M LP NAC
7
MAJOR AFFECTED AGGREGATES IN BSVI
8
MAJOR AFFECTED AGGREGATES IN BSVI
9
ENGINE –MDEP5 Vs E694
MDEP5 BSVI E694 BSIV ENGINE
ENGINE
10
ENGINE POSITION with ground clearance
MDEP5 BSVI E694 BSIV ENGINE
ENGINE
• Front overhang increased by 210mm in LPO w.r.t BSIV for packaging chassis
mounted AC drive
• LP–no change in Front overhang.
• Transmission is ET90S6 as compared to ET70S6
• FDR change in BSVI with 440mm drive head
11
20.15 LPO
Change detail BSVI vs BSIV
12
20.15 LPO CHANGE CONTENT
BSVI AIR INTAKE BSVI AIR INTAKE
BSVI ENGINE
MOUNT BSIV ENGINE
MOUNT
13
20.15 LPO CHANGE CONTENT
BSVI Compressor Plumbing BSIV Compressor Plumbing
14
20.15 LPO CHANGE CONTENT
BSVI Engine Cooling System BSIV Engine Cooling System
15
20.15 LPO CHANGE CONTENT
BSVI Fuel tank BSIV Compressor
Plumbing
16
20.15 LPO CHANGE CONTENT
BSVI GSL Routing BSIV GSL Routing
BSVI Fuses & Relay position BSIV Fuses & Relay position
17
20.15 LP
Change detail BSVI vs BSIV
18
20.15 LP CHANGE CONTENT
BSVI Air Intake
routing BSIV Air Intake routing
19
20.15 LP CHANGE CONTENT
BSVI Compressor Plumbing BSIV Compressor Plumbing
20
20.15 LP CHANGE CONTENT
BSVI Engine Cooling BSIV Engine cooling
21
20.15 LP CHANGE CONTENT
BSVI Fuel tank BSIV Fuel tank
22
20.15 LP CHANGE CONTENT
BSVI GSL Routing BSIV GSL Routing
23
20.15 Major Exclusive part -New in BSVI
Chassis ELEC part Chassis ELEC ECU part Radiator Brkt design New Front Exhaust Pipe GSL Profile New
mtg
Prop Shaft as per 6S RA hsg Brkt & Wheel end Steering routing profile ET90 6Speed Trans Front Susp Brkts
Trans
24
20.15 Major Exclusive part -New in BSVI
25
UPCOMING BASE VARIANTS OF Pro 6000 & 8000 BSVI
10/23/2021 26
Major Change Content of VE2188 (BS VI)w.r.t.
VE2100(BS IV)
Aggregate Changes VE2100 (BSIV) VE2188 (BSVI) Remarks
FA1 to FA2 Inter axle distance 1950mm 1995 mm New EOLT
Vehicle
RA1 to RA2 Inter Axle distance 1420mm 1350mm New EOLT
Frame bkts fitment station shifting &
Grid holes Regular Modular
difficulty in hole identification.
Cross members & Stiffeners Regualr Light weight NA
Cross members Inbuilt With split gusset NA
Mounting Brkts Regular Change as per grid Frame bkts station shifting
Frame Front C/M Regular New NA
Mud guard and mtg Regular New New S/A Fixture/area reqd.
RMPA Regualr Light weight New S/A Fixture/area reqd.
Battery box Regualr New New S/A Fixture/area reqd.
Base Engine MDE8 & MDE8 Without EGR With EGR
EATS Exhaust System BS4 SCR with Albonair dosing unit Box type EATS system New S/A Fixture/area reqd.
Front Susp Parabolic suspension 1525mm 1700mm NA
Rear Susp Sleeper Suspension NA Haulage only New Process-Tools and Facility reqd.
Rear Axle VECV Tandem axle 6X4T 10X2H & 10X4 H NA
RMPA RE Sus.
10/23/2021 28
Badges and Stickers…
BS6 BS6 Sticker on Mbooster/+