Total Combined O&M Expenditure for Prop. Wet Well & STP
SL. Description Total Without
Electricity Charges &
With GST
S.No Description Cost/ Month No. of Total with GST/ Taxes Total incl. GST & Total Without GST
Months Electrical Charges Elect. Charges
S.No Description Cost/ Month No. of Total with GST/ Taxes Total incl. GST & Total Without GST &
Months Electrical Charges Elect. Charges Without Elect. Charges
B CONSUMABLES AMOUNT FOR FIRST YEAR 4,044,300.00 18% 727,974.00 4,772,274.00 4,044,300.00
S.No Description Cost/ Month No. of Total with GST/ Taxes Total incl. GST Total Without GST &
Months Electrical Charges Electricity Charges
3,144,000
4,044,300.00
7,188,300
427,252
2,614,600
3,041,852
7,188,300
10,589,567
11,119,045
11,674,997
12,258,747
52,830,657
Minimum Wages rates for the
(Labour Commissione
26. Employment in Building and other
Notification No.: KAE 83 LWA 2022 DATED 13-01-2023
Minumum wages and VDA from 01-0402024 to 31-03-2025
Sl. Class of Employment Minimum Rates of Wages
(Monthly)
Zone-2: Notified areas of all the Corporations in the State other than BBMP and Agglomeration.
Zone-3: All District Headquarters other than the palces mentioned in Zone-1 and Zone-2.
Zone-4: All other Places of the State other than the places mentioned in Zone-1
V.D.A: In addition to the basic wages, all Category of Employees in the State shall be paid VDA at the rate of 4 P
Wages rates for the Year 2024-25
our Commissioner Office)
in Building and other Construction Works
lomeration.
e-2.
e paid VDA at the rate of 4 Paisa per Point over and above 7973 points.
21000
15000
Gross Total
37875.96
31644.46
25138.58
23073.58
21196.28
19891.43
24671.40
22648.87
20810.20
19533.64
23970.63
22011.80
20830.48
18996.96
23503.45
21587.09
20432.94
18639.18
26273.23
24157.64
22234.39
20311.14
25479.02
23435.64
21578.02
20304.72
25479.02
23435.64
21578.02
20304.72
24030.76
22119.03
20381.11
19195.58
22395.62
20632.55
19593.61
17943.33
24591.37
22628.69
20844.43
19624.92
24030.76
22119.03
20381.11
19195.58
5 YEARS OF OPERATION & MAINTENANCE OF
23.5 MLD SBR STP
(A) DETAILS OF MANPOWER
S.No Description Nos. Salary per Total with Total Without
Month Electricity Electricity
charges & With Charges &
GST Without GST
1 PLANT MANAGER 1 35000 35,000.00
2 OPERATORS 6 19000 114,000.00
3 CHEMIST 1 28500 28,500.00
MECHANIC &
4 2 19000 38,000.00
ELECTRICIAN
5 SECURITY 3 15500
46,500.00
262,000.00
SALARY AMOUNT FOR FIRST YEAR 12 3,144,000.00 3,144,000.00
GST @ 18% 18% 565,920.00
3,709,920.00
(B) DETAILS OF CONSUMABLES
Cost /
No. of Cylinders/
S.No Description Cylinder Total
Quantity
Cost/Kg
1 CHLORINE 47.0 49000 2,303,000.00
2 PE 2564 450 1,153,800.00
3 OTHER CHEMICALS & LUBRICANTS 587,500.00
CONSUMABLES AMOUNT FOR FIRST YEAR 4,044,300.00
GST @ 18% 18% 727,974.00
4,772,274.00 4,044,300.00
(C) DETAILS OF POWER CONSUMPTION
No. of
S.No Description Cost/ Month Total
Months
10,152,000.00
Taxes @ 9% 0.09 913,680.00