Post Implementation Support of SAP System at MCGM
Post Implementation Support of SAP System at MCGM
Tender for- “Selection of Service Provider for Post Implementation Support of SAP Services at
MCGM” for Three Years.
1) Pre-Qualification Criteria
2) Scope of Work
3) Technical Qualification Criteria
4) Bill of Quantity (BoQ)
5) Service Level Agreement
6) Disclaimer
For Your Feedback you can mail us at Mail to: [email protected] with subject as “Selection of
Service Provider for Post Implementation Support of SAP Services at MCGM”.
Note: - The end date of feedback is up to 15/06/2017. Please Read Disclaimer Section.
1. Pre-Qualification Criteria:
The Service Provider is expected to generate and maintain 1 single system for all tickets (support /
maintenance / bugs / enhancements).
2.7 Primary Team Support Functioning
The SERVICE PROVIDER would setup a team with adequate executives from half hour before and half hour
after the department’s official working hours.
Field Support Team: Field Support Team plays a critical role in the identification of repeat service requests
which becomes an input into the continuous improvement process and updating of Knowledge Base. All
activity will initiate direct interaction with the initiating business user and/or other IT resolver groups until
completion.
2.8 Roles and Responsibilities
The SERVICE PROVIDER will depute staff who will be contactable via phone and mail to provide assistance
to the Users and address their queries and concerns. This assistance will be provided during the Service
Hours as per the location classification and responsibility matrix, which will be covered in the Operations
Manual to be provided by SERVICE PROVIDER and duly approved by Department.
During all other hours, users can leave their message via email. The requests received on email after
MCGM working hours will be taken during the next working day.
A proper escalation procedure, as mentioned in the duly approved Operational Manual, will be followed
if the problem cannot be resolved. Shared resources of operational and technical support group will
provide this service at all locations. The Primary Support service will serve as a single point of contact for
all incidents and service requests. The service provider will provide a Single Point of Contact (SPOC) and
also escalation / closure of incidents for the user departments. The Primary Support services would be for
Infrastructure Facility Management and Application support across all offices of Department.
SERVICE PROVIDER is expected to also deploy a remote desktop management tool to reduce the site visits
for problem management and effective issue resolution for the department employees.
The activities shall include:
1. Provide Primary Support facility during agreed service period window for reporting user
department incidents / issues / problems with the IT infrastructure & Application related issues
2. Provide necessary channels for reporting issues to the Primary Support. The incident reporting
channels should be the following:
Specific E-Mail account
Telephone
Online Ticket Management Tool
3. Implement a call logging system in line with the severity levels as per the SLAs. Primary Support
Staff shall log user and assign an incident/ call ID number. Severity shall be assigned to each call
as per the SLAs.
4. Creation of knowledge base on frequently asked questions to assist users in resolving basic issues
themselves
5. Track each ticket / incident / call tillthe problem is not resolved.
6. Analyze the call statistics
7. Creation of knowledge base on frequently asked questions to aid users.
8. Continuous monitoring of the physical as well as the IT infrastructure at the DC, Department
offices to ensure application availability as per agreed SLAs.
9. Escalate the calls, to the appropriate levels, if necessary as per the escalation matrix agreed
between the SERVICE PROVIDER and the user department. The escalation matrix shall be
developed by the SERVICE PROVIDER in discussion with Department.
10. Analyze the incident / call statistics and provide monthly reports including but not limited to:
Type of incidents / calls logged
Incidents / calls resolved
Incidents / calls open
11. Root Cause analysis For frequently occurring incidents
12. The SERVICE PROVIDER shall provide primary Support facility during the working hours for
reporting issues / problems. The SERVICE PROVIDERshall provide a Primary Support facility and
set up all necessary channels for reporting issues to Primary Support.
13. Initiate a “Problem Management Record” or “PMR” to document service outages using a Problem
Management System as stated in the approved Operational Manual.
14. Update concerned Authority of Department with complete and accurate system status.
15. Notify Department’s designated personnel about systems failures, or an emergency, according
to the Operational Documentation.
16. Problem escalation in case of service levels not adhered to.
17. Provide detailed contact list of Primary Support staff to Department.
18. Arrange for on-site/off-site support for resolution of problem.
Apart from the Primary and Core team activities the SERVICE PROVIDER will also be responsible for the
following.
Functional Audit Support (half yearly)
Technical System Audit Support (half yearly)
Year End Closing Support
Department will:
Provide the contact list of all Department’s personnel who will be intimated for the problem
determination assistance and escalation and ensure their availability.
Ensure that the users are aware of the Primary Support Services and its functions.
Assist SERVICE PROVIDER in resolving performance issues of third party vendors, if so
required.
2.9 Ticketing Tool
It will be responsibility of the SERVICE PROVIDER to ensure and put in place a process for ensuring that
each ticket is logged by the users themselves and with adequate self-explanatory information on type of
support/issue. Similarly at each stage of resolution the ticket should be updated with the
resolution/resolution procedure/status in self-explanatory language.
Currently SAP Solution Manager is being used as ticketing tool, however the SERVICE PROVIDER is free to
use SAP Solution Manager (post re-configuration) or any other tool that can be used to monitor (at no
extra cost to MCGM) the SLA defined by MCGM in the RFPs.
Note: It is mandatory for the SERVICE PROVIDER to use SAP Solution manager (Solman) or any other
system for Ticketing system. Once the Service Provider is on boarded, it would be its foremost task to
implement the tool for SLA monitoring purpose.
2.10. Core Team (Secondary Team)– Responsibilities
• RICEF (Reports, Interfaces, Conversions, Enhancements, Forms) Development, Workflows/UI
Programming, Performance Tuning, SAP and DB version upgrades, Patches, Kernel Upgrades, Integration
Testing, Roll-outs.
• All type of integration with third party (e.g. Email, SMS, Payment gateways etc.), up gradation (Detailed
is attached in Annexure XIII) as and when required is part and parcel of the Secondary resource team
scope.
2.11. Change Request Process
The service provider is expected to deploy a secondary support team, which is responsible for enhancing
and modifying the existing SAP implementation based on the needs of the user department. To begin with
the MCGM will earmark 50% time for the secondary support team for change request activities and
further review the time allocated for change request on a six month basis.
# Services
1 Change request due to changes in business process (Performing end to end processes to support change
request which include requirement gathering, requirement documentation, design development,
configuration, testing, facilitating user acceptance testing, training and deployment)
2 Change request for enhancement in SAP application (Performing end to end processes to support change
request which include requirement gathering, requirements documentation , design, development,
configuration, testing, facilitating user acceptance testing, training and deployment)
3 Preparation and updating of versions of Business Blue Prints of all modules of SAP implemented / to be
implemented at MCGM.
4 Preparation and updating of versions User manual of all modules of SAP system implemented / to be
implemented at MCGM.
5 Preparation and updating of versions Training Manuals of all modules of SAP system implemented / to be
implemented at MCGM.
6 Preparation and updating of versions System Installation / configuration Manuals of all modules of SAP
system including System Landscape etc. implemented / to be implemented at MCGM.
7 Creating integration touch points with various MCGM or external applications as required by MCGM.
8 Any other customisation / documentation services not listed above but required for smooth functioning of
implemented module of SAP system directed by MCGM.
The Change Request Management handles all the change requests, urgent or not, received from various
sources inside and outside the Application Maintenance Services process.
The submitted change requests are validated and logged, and then they will be assessed and submitted
for approval to the MCGM Change Control Board in a specified template. The change Control board will
determine the criticality of change request and the timeline for its implementation, which the Service
Provider need to follow. The SLA will be determined based on the compliance of implementation of
change request.
To better control urgent changes, though they may originate from a variety of sources inside and outside
the Application Maintenance Services team, change requests affecting the in-scope business systems shall
all be handled at a single entry point and will need to go through the defined processes that may be agreed
upon at the start of the contract. Bidders are free to propose emergency change request process in their
technical proposal.
2.12. Bug/Defect Management
Bugs or Fixes Management is an important activity and based on the severity level, it becomes highly
critical. As the parties involved are Users / functional team members of Department and Service Provider,
SLAs may not be directly defined. SERVICE PROVIDER commits involvement in resolution on ‘best of
efforts’ basis as per requirements. Following are the steps involved:
Problem definition
Context definition (through functional teams as per requirements)
Request Analysis by SERVICE PROVIDER
Priority Categorization
Logging with concerned team and tracking to resolution
The SERVICE PROVIDER shall address all the errors/bugs/gaps in the functionality offered by the solution
(vis-à-vis the FRS) at no additional cost during the operations & maintenance. The SERVICE PROVIDER shall
identify and resolve application problems like system malfunctions, performance problems, data
corruption etc. due to which the solution is not able to give the desired performance
The SERVICE PROVIDER shall be responsible for the following:
Updating all available patch/ updates to the solution.
Providing handholding support to end users
Ensuring proactive and timely support in identification and provision of solutions including
Support for resolution.
Timely logging of Bugs/Problems
Perform Defect fixes for the existing functionalities
Major/ Minor enhancements against the delivered solutions
Incorporate new requirement against the implemented solutions.
Maintain Documentation for the following:
Functional and technical specification
Configuration document update
Test document
Business Blue Print
User Manual
2.13. BASIS Support
Perform SAP Installation, Post installation, client administration, System Refresh and Post-Refresh
activities if required
Perform parameter modification, Buffer, memory management, and performance tuning
Perform SAP Database Administration – Space management, database reorganizations, and design
and implement backup and restore strategy.
Maintain database security; administer database performance, database problem determination and
resolution, etc.
Maintain the integrity of the SAP environment by managing the SAP Correction and Transport System
(CTS) to ensure all configuration and development objects are promoted properly
Perform Role Creation, Modification and Full trouble shooting support for the users authorization
failures in all SAP applications and resolving the Security issues and support in integration testing of
Roles/Profiles.
Preventive Maintenance activities - Support Pack/Plug-in implementations, Kernel upgrades, OSS
note applications and to apply support pack.
2.14. Change Request Project Management
The SERVICE PROVIDER will be required to create and maintain formal project schedules (Gantt charts)
for all Change Request Development projects with a forward looking forecast of future projects and
associated resource requirements.
The SERVICE PROVIDER will be required to coordinate and identify potential future resource constraints
based on the future looking project schedule.
The SERVICE PROVIDER will be required to provide formal project management oversight of the Service
Provider’s Change Request Development team and ensure that they deliver as per the defined project
schedules.
The SERVICE PROVIDER will work as per the responsibilities mentioned in the Bid document.
2.15. Change Request Development Reporting
The SERVICE PROVIDER will be required to report on all Change Request Development activities using
templates that will be mutually agreed to by the MCGM and SERVICE PROVIDER.
The SERVICE PROVIDER will work as per the responsibilities outlined in Responsibility Matrix, for reporting
activities for the Change Request Development Services.
2.16. Environment Management
SERVICE PROVIDER will be responsible for maintaining various environments as per the best SDLC
practices in the industry.
Development Environment
The SERVICE PROVIDER will be responsible for managing and maintaining the SAP development
environment at MCGM. Complete maintenance ownership of the development environment will reside
with the service provider. This environment will be used to address maintenance requests, change
requests and any new module implementation requests by MCGM.
Quality Environment
The SERVICE PROVIDER will be responsible for managing and maintaining the SAP testing environment at
MCGM. Complete ownership of the testing environment will reside with the service provider. This
environment will be used to test maintenance requests, change requests and any new module
implementation requests by MCGM.
Production Environment
SERVICE PROVIDER will be responsible for maintaining the Production environment as per the industry
standards and ensuring proper access controls and security procedures being followed.
2.17. Database Maintenance and Support
Database administration services from the SERVICE PROVIDER should include:
Database software installation, configuration, upgrade and migration;
Assist in Backup, recovery monitoring and periodic testing;
Performance monitoring;
Schema, Database and Table optimization;
Authorization and access logging;
Storage and capacity planning; and
Troubleshooting
2.18. Training and Capacity Building
The SERVICE PROVIDER shall conduct Training Needs Analysis of all the concerned staff and draw up a
systematic training plan in line with the overall project plan. The trainings shall be provided at Department
premises or any other premises, as fixed by Department
Use of recommended training tools / software(s) for providing various training is essential. Adequate
training material which includes training manuals, quick reference cards etc. should be provided during
the training sessions. The recommended training material should be in paper & electronic media with
courses on fundamentals, business process overview, job activity training, and delivery options being on-
line, instructor led class rooms, etc.
Training and Capacity Building Requirement
The objective of Capacity Building (CB) initiatives is to equip the direct users and other stakeholders of
Department with the right skills, and knowledge to optimally use the IT solution implemented.
The Training program would be split into series of sessions for different user groups and across functional
areas of the system.
The SERVICE PROVIDER shall be responsible for the following activities as part of the End User and Train
the Trainer Training:
Develop overall training plan including formation of user groups and classifications
Develop Location-Wise Training Schedule, Curriculum, and Training Material for Department Staff
Deliver training to end users including carrying out the training effectiveness evaluation
Identifying Department Champion for Train the Trainer Training
Sr.No. Module of SAP System Approximate duration of Frequency of Level of Training Required Approximate total
Training Session Training number of employees
sessions of MCGM who will be
trained in one session
1 SAP Finance 4 hours per day X 1 day Twice in a End user training covering all 30
month transactions of SAP Finance
Module
2 SAP Material 4 hours per day X 1 day Twice in a End user training covering all 30
Management month transactions of SAP Material
Management Module
3 SAP Project System 4 hours per day X 1 day Twice in a End user training covering all 30
month transactions of SAP Project
System Module
4 SAP Supplier 4 hours per day X 1 day Twice in a End user training covering all 30
Relationship month transactions of SAP Supplier
Management Relationship Management
Module
5 SAP Human Resources 4 hours per day X 1 day Twice in a End user training covering all 30
month transactions of SAP Human
Resources Module
6 SAP Real Estate 4 hours per day X 1 day Twice in a End user training covering all 30
month transactions of SAP Real Estate
Module
7 SAP Fleet Management 4 hours per day X 1 day Twice in a End user training covering all 30
month transactions of SAP Fleet
Management Module
8 SAP Citizens Portal & 4 hours per day X 1 day Twice in a End user training covering all 30
Ward Management month transactions of SAP Citizens Portal
(Customer Relationship & Ward Management (Customer
Management) Relationship Management)
Module
Plans and manages the project team's activities from contract initiation to completion
Evaluates risks and recommends contingency plans
Manages quality assurance and ensures compliance with policies and procedures
Meets and communicates project milestones to MCGM on timely basis
Establishes appropriate metrics for measuring key project criteria
Maintains awareness on emerging technologies from SAP perspective and applies the same to the
project
Onsite contact for all escalations
Responsible for monthly reviews
1 Project Manager
Provides management summary reports and
Supports Root Cause Analysis with Technical Specialist
Creates and maintains Training Plans, Policy and procedures
Manages in-house training infrastructure
Keep track of latest technology/ tool/ module/ project offerings
Proposes new courses, course modifications / deletions and ensure uploading of the same on MCGM
website for benefit of MCGM’s SAP end user
Contributes towards planning and documentation
Possess knowledge and awareness about the latest IT offerings, tools and techniques
Assess the training needs of the employees
Plans, Organizes and supervises training and development programs for MCGM employees
Evaluates training effectiveness
Ensures that the training facility and all required materials are ready on the day of the training.
Helps employees maintain and improve their job skills, and also prepare them for jobs requiring greater
skill
Acts as single point of contact to outside training vendors, if any and manage them
Technical expertise of the SAP Netweaver / Basis
Ensure compliance with SAP
Contributes to hardware and software evaluations and recommendations
Plans growth and changes (capacity planning), Hardware sizing and Network Planning
Defines and formulates disaster recovery plans, procedures and test scenarios and participates in
regular DR rehearsals
Guide/lead junior Basis Consultant on technical issues
Possess Advanced knowledge and skills in all related to SAP Products and system software
Possess extensive knowledge and experience in maintaining and configuring SAP Systems
Installs and configures SAP software and other related products and upgrades /patches
Manages SAP Login Credentials i.e. User administration (setup and maintaining account, Setup security
SAP Netweaver policies for users)
2 (Basis) Manages and support various environments - Linux/AIX and other Unix environment as well as
Administrator Windows environment
Participates in the administration of the server
Evaluates, tests and Updates system as soon as new version of OS and/or application software is
released (after obtaining a formal approval from MCGM)
Assists in developing, implementing, testing and maintaining backup and disaster recovery policies and
procedures
Assist in backups and recoveries regularly and as and when required
Handles SAP Basis incidents
Provides suggestions and implements software-related measures for maximizing uptime
Supports development team whenever required
Monitors system performance to ensure high availability of the system
Ensures SAP application / user security and authorization management, SAP change correction
management / SAP Transport management system, etc.
Analyses Functional Specifications and get clarifications from Business owners
Creates technical specifications
Develops Custom reports (Classical, Interactive)
Develops Online Interfaces and BDC programs
SAP ABAP Fine-tunes and modifies of the custom programs
3
Consultants Performs Pre-Delivery Reviews and Final Testing
Develops ALE/IDoc Interfaces and Maintaining ALE Configuration in All the systems
Prepares Unit Test Plans, coordinating with middleware and Legacy developers during process
chain testing
Supports Unit Testing & Business Acceptance testing
The staff sitting at central place and carrying out development, change request, bug fixing and all types
of up gradation, providing backend support etc. to primary field support staff and to users as and when
required.
Understands the current business process, designs current business flows, studies current business
processes and its complication.
SAP Functional Preparation of Flow diagrams and DFD of AS IS processes.
5 Consultant Everything configured has to be documented as per their categories in the form of predefined
(Secondary) templates, these have to be then approved by the team leads or whoever the consultant is reporting to
Performs GAP analysis for each module
Prepares DFD/ERD before starting configuring future business processes in SAP i.e. TO BE process.
Prepares test scripts for testing the configured scenarios.
Prepares end user manual and provides training to end user.
Primary Support Staff is the staff supporting end user of MCGM working in or outside of Mumbai
(Outside city offices of MCGM at Kapurbawdi, Balkum, Tansa, Modak Sagar, Pise-Panjrapur, Agra road,
Middle Vaitarna etc.) Jurisdiction in one or all applications.
Field Support staff Primary support staff will provide support from central location
6 (Functional-
Reports of various issues, difficulties faced by end users of SAP in the field to IT Department and
Primary)
customization / maintenance service personnel of the SERVICE PROVIDER
Helps the end users log issues / trouble ticket on SAP Solution Manager or any other system
Suggests enhancements in functioning of SAP modules
Creates user information solutions by developing, implementing, and maintaining Java based
components and interfaces.
Defines site objectives by analyzing user requirements; envisioning system features and functionality.
Designs and develops user interfaces to internet/intranet applications by setting expectations and
features priorities throughout development life cycle; determining design methodologies and tool sets;
completing programming using languages and software products; designing and conducting tests.
Recommends system solutions by comparing advantages and disadvantages of custom development
and purchase alternatives.
7 Java Consultant Creates multimedia applications by using authoring tools.
Completes applications development by coordinating requirements, schedules, and activities;
contributing to team meetings; troubleshooting development and production problems across multiple
environments and operating platforms.
Supports users by developing documentation and assistance tools.
Updates job knowledge by researching new internet/intranet technologies and software products;
participating in educational opportunities; reading professional publications; maintaining personal
networks; participating in professional organizations.
Enhances organization reputation by accepting ownership for accomplishing new and different requests;
exploring opportunities to add value to job accomplishments.
The Project Manager shall also be responsible for problem management, continuous system
improvement, version control and version validation, risk management &imparting trainings to MCGM
employees etc.
During the course of the contract, if it becomes necessary to replace any of the Key Personnel, the
Selected Agency shall forthwith with due approval from the department, provide as a replacement, a
person of equivalent or better qualifications and experience than the resource being replaced / or
proposed in the bid. Failure to replace personnel with the required qualifications shall result in a penalty
as per the SLA defined in the contract.
2.23. New Module Implementation
During the tenure of the contract, MCGM may decide to implement new SAP modules in order to offer
improved citizen services or increase internal departmental efficiency. The rates for additional consultants
are being discovered for the same purpose. In case of a new module implementation. Following services
will be expected from the service provider.
During such instances of new module implementation, the bidder will have to provide an initial estimate,
which will be reviewed and vetted by MCGM (or any third party appointed by MCGM). Following
acceptance and finalization of such estimates the service provider would commence work of new module
implementation.
# Services
Preparation and updating of versions of Business Blue Prints of all modules of SAP system implemented / to be
1
implemented at MCGM
Preparation and updating of versions User Manuals of all modules of SAP system implemented / to be implemented at
2
MCGM
Preparation and updating of versions Training modules of all modules of SAP system implemented / to be implemented
3
at MCGM
Preparation and updating of versions System Installation / configuration Manuals of all modules of SAP system including
4
System Landscape etc. implemented / to be implemented at MCGM
Customizing / Implementing and rolling out the module based on the requirements given by MCGM and sizing adequate
5
infrastructure for new module.
Any other reporting / documentation services not listed above but required for smooth functioning of SAP system as
6
directed by MCGM.
7 All the services (Performing end to end processes which includes requirements gathering, requirement documentation,
design, implementation, customization, configuration, testing, facilitating user acceptance testing, training and
deployment)
Any other field support service not listed above but required for smooth implementation / customization of any other
8
new modules.
2.24. Other Ancillary Services
# Services
1 Handholding to train MCGM staff for operational activities.
2 Liaison and support the FMS service provider for smooth production deployment
3 Liaison and support the FMS service provider for timely resolution of issues
Liaison with other application development vendors for integration of the SAP application with internal / external applications
4
as required by MCGM
Liaison with DR / cloud service provider to deploy the application at DR / cloud site and subsequently ensure updates are
5
applied to both primary and DR / cloudsite.
6 Liaison with any other external agency appointed by MCGM
7 Support and perform all services required from SAP application perspective for integration of third party software with SAP
2.25. Application Management Methodology: The service provider will have to deploy an application
management methodology for smooth operation of the SAP system at MCGM. Such a methodology
would include:
• Support Services
• Support Service Phase
• New Module Implementation
• Use of Solution Manager or any other system
• Template and Tools
• Periodic Reporting & Escalations
• SAP Environments
(a) Support Services: The service will provide the following services as part of the service delivery client.
Level 1 (User Support) User Query Resolution through decentralised support. The services will have to be
provided as per the service level agreement specified .Such activities will be completed by primary support
resources.
Level 2 (Application Problem Resolution) The troubleshooting and resolution of the problem related to
SAP modules implemented at MCGM. Such instances would include but not limited to:
• Application (Major Feature) severely disturbed
• Application (Major Feature) frequently interrupted
• Severe server / Business process performance degradation
• SAP batch job failure resulting in posting of data not occurring
• MIS report output / Statutory reporting not possible or faulty reporting
Level 3 (Enhancement, new functionality and design changes) Level 3 support is related to the technical
/ functional enhancements / design of the existing SAP functions and can be subcategorized as follows:
ABAP- Changing modifying existing developments / design as part of enhancements
New Requirements- Designing, Coding, code review, unit testing
BASIS- Release management, creating new authorization matrix for the new development
Helping client in identifying and removing any conflicting authorization roles & profiles for
their SAP systems.
Functional- Providing the modified / new functional specifications, Development query
resolution, Unit testing.
Level 3 support will be on demand basis and will require a prior notification and approval from both ends
before commencement of the activities. Level 3 support will be based on the approved estimated effort
and will be governed by the SLA applicable for change request Such activities must be completed in the
time earmarked for change management for the SAP support system.
Level 4 (Periodic Activities) Level 4 support services is related to the scheduled functional/ system
activities and can be subcategorized as follows:
Data reconciliation Activities
Execution of any scheduled and system activities required for smooth operation of SAP system
Level 4 support activities will be carried out by the designated functional / BASIS consultants based on
agreed schedule and scope. The service provider will have to record the time required completing all such
level 4 support activities
(b) Support Service Phases
The overall contract duration will be distributed in the following logical phases:
Knowledge Transition
The primary objective of the transition phase is to assist smooth handover of the support activities from
the implementation / existing support to the service provider team so that business continuity not
impacted. The transition phase will help service provider to gain client specific business knowledge,
functions, processes associated applications, and documents to provide the support services. The service
provider will have to ensure that the knowledge transfer is completed in a time bound manner (i.e. within
two month of Service Provider being on board at no additional cost to MCGM for this knowledge transfer
activity) .This phase will commence as soon as the service provider is on board.
Delivery of Service
During this phase, Service provider will assist in resolving the immediate problems, achieving a stable
business environment, troubleshooting technical issues, addressing process gaps, and performing overall
support services. This phase will commence as soon as the service provider is on board.
Service Governance and Improvements
During this phase service provider will address future needs such as upgrades, enhancements, change
request and process improvements. Service Provider will identify areas for performance tuning,
performing data archival, and helping realize maximum benefits from the SAP system. This phase will
commence after the knowledge transition has been accomplished.
Application Maintenance and Development service activities will be regularized during this stage. The
purpose, procedures defined and agreed upon in the setup stage will drive the delivery of services on an
on-going basis. Service provider will be responsible for reviewing processes and monitoring adherence to
agreed expectation levels. Service provider will also carry out quality reviews, provider value added
services and knowledge Management as a part of this stage.
(c) New Module Implementation
For implementation of any modules, the following development methodology will be used:
# Services
Project preparation:
1 During this phase the team of functional consultants of service provider shall go through initial planning and preparation for SAP
project.
Business Blueprint:
The purpose of this phase is to achieve a common understanding of how the MCGM intends to run SAP to support their business.
2
As per standard ASAP methodology the result is the business blueprint, a detailed documentation of the result gathered during
requirements workshops.
Realisation: The purpose of this phase is to implement all the business process requirements based on the business blueprint. The
3 system configuration in standard ASAP methodology is done in two work packages: baseline configuration; and final configuration.
During this phase the solution is also tested
Final Preparation: The purpose of this phase is to complete the final preparation to go live. This also serves to resolve all critical
4
open issues.
Go Live support: The purpose of this phase is to move from a project oriented , pre =-production environment to live production
5
operation as a joint responsibility of the service proved and facility management services provider of MCGM.
Operate: During this phase the system is operated with the help of the central operation platform, SAP solution manager /
7
ticketing tool, with the documented solution based on the transferred project documentation
# Parameter Marks
A Bidders’ General Competence 30
B Human Resource 10
C Bidder's SAP Experience 35
D Approach & Methodology 10
E Training &Transition Management Plan 10
F Technical Presentation 5
Total 100
The 6 evaluation categories would be divided into various sub-categories and each bidders needs to
score minimum 50% in each category (i.e in Category A, B, C, D,E, F), as broadly mentioned below:
A. Bidders’ General Competence:
Qualifying criteria for bidders is given in Section 3. Over and above these criteria, bidders shall be rated on
following parameters:
B. Human Resource
MCGM will evaluate the information submitted by the Bidder with regard to Bidder’s
proposed team.
Any change in the actual team will be allowed only after expressed written approval from
the Director IT, MCGM
Marking scheme for this criteria of evaluation will be :
Evaluation Criteria Max. Marks Criteria
1 Experience in Project Management (upto 7 Years – 2.5 Mark, Over 7 Years – 5
Project Manager Marks)
10
Experience 2 Experience in SAP Implementation ((upto 7 Years – 2.5 Mark, Over 7 Years – 5
Marks)
C. SAP Experience
Evaluation Criteria Max. Marks Criteria
Experience in SAP Projects undertaking software development, customization /
SAP Experience (Based implementation / post-implementation support projects worth at least Rs. 10 Cr
10
on cost of Projects) each(excluding cost of supply of licenses& hardware)for last 10 years prior to bid
submission date.
The combined projects should cover at least 4 of the below listed modules
Modules to be considered: FI,CO, MM, SRM, CRM, HR, EP, PM, PS, BI, RE
Combine Total Value between 50 cr to 60 cr 6 Marks
Combine Total Valu0e between 61 cr to 70 cr 7 Marks
Combine Total Value between 71 cr to 80 cr 8 Marks
Combine Total Value between 81 cr to 100 cr 9 Marks
Combine Total Value 100cr and above 10 Marks
F. Technical Presentation
4. Bill of Quantity
Details to be filled up for price bid are as below. .
The fees shall be inclusive of Value Added Tax or Sales Tax, Service Tax, Income Tax, duties, fees, levies,
charges, and commissions as applicable under the relevant Laws of India. Should there be a change in
applicable taxes, the actual taxes on the date of billing would prevail.
Table 1: Fixed Price Item
# Manpower Category Quantity Duration of Services Rate per Total Cost
in Nos. required in Months month of Services
1 Project Manager 1 36
2 SAP Netweaver (Basis) Administrator (Secondary) 4 36
Note: If MCGM decides to go to S4/HANA, the resource qualification should match S/4 HANA skill set.
Roles and Responsibilities of Primary and Secondary staff is given below
*The detailed Scope of Work of the Service Provider for the up gradation of the existing SAP module at
MCGM is mentioned in Annexure XIII
* The term “Up gradation of existing SAP modules” in BoQ means complete Technical Up gradation as
well as functional Up gradation. Also the final payment of the service provider will be released only after
complete up gradation (i.e. Technical up gradation as well as functional up gradation)
Above table is only for price discovery and MCGM does not guarantee any minimum service
procurement during the period of contract.
Note:
1. The Bidder should submit only the 'Summary of the Commercial Format' on the e-Tendering portal
and the detailed commercial bid should be submitted manually along with the submission of the
EMD. The formats for detailed commercial bids to be as per formats defined in his RFP.
2. The allocated Secondary Resources of the service provider to provide services of different
modules can be interchanged as per the requirement of the MCGM and in this case the order of
the Director (IT) will be final.
3. The bidders may visit the site and obtain additional information at their own cost and
responsibility.
4. It is to be noted by the Service Provider that MCGM will have full right to operate / non operate
any line item mentioned in BoQ.
5. The Selected Agency will quote both for Implementation cost and the Operations and
Maintenance cost, the details of which are given in the Bid Document.
6. MCGM to scale up and scale down resources based on requirements. Any line items may be
removed from the scope based on MCGM’s discretion.
7. All the prices are to be entered in Indian Rupees ONLY.
8. Prices indicated in the schedules shall be inclusive of all taxes, Levies, duties etc.It is mandatory
to provide breakup of all Taxes, Duties and Levies wherever asked for.
9. During the payment stage, MCGM reserves the right to ask the Bidder to submit proof of payment
against any of the taxes, duties, levies indicated.
10. The Bidder needs to account for all Out of Pocket expenses due to Boarding, Lodging and other
related items. No additional/separate payment shall be made regarding the same.
11. For the purpose of evaluation of Commercial Bids, MCGM shall make appropriate assumptions to
arrive at a common bid price for all the Bidders. This however shall have no co-relation with the
Contract value or actual payment to be made to the Bidder.
12. The Contract Price shall be firm and not subject to any alteration.
13. The Selected Agency should be deemed to have satisfied itself as to the correctness and
sufficiency of the contract price, which shall, except as otherwise provided for in the contract,
cover all its obligations under the contract.
14. Please note invitation of price discovery rate for future requirements does not imply guarantee
of any additional work or any increase in scope. The price discovery rates are being invited to
meet any exigency requirements if a need emerges during the period of contract with respect to
deployment of additional manpower resources.
15. The rate/cost quoted for AMC and price discovery elements would be considered for additional
procurement/payment in future.
16. Wherever present, the items mentioned as Lump Sum in above table will have quantity as 1 in the
BoQ available online via e-tendering. However the bidder should consider the same as Lump Sum
and submit the commercials.
Details to be filled up for price bid (Variable Components) are as follows:
Above two tables are only for price discovery and MCGM does not guarantee any minimum service
procurement during the period of contract
The rates mentioned above will be considered as final bid price by bidder for commercial evaluation.
The rates quoted must be inclusive of any out of pocket and any other incidental expenses.
Commercial Score Calculation:
Bidders Commercial Score (F) = (Fixed Price Calculation for Bidder X 0.95) + (Rate Contract Item
Calculation for Bidder X 0.05)
Fixed Price Calculation for Bidder = Lowest Total Fixed Price/Total Fixed Price of Bidder
Rate Contract Item Calculation for Bidder = Lowest Total Rate Contract Item /Total Rate Contract Item
of Bidder
Response Time:<=4 Hrs Daily 0.20% of total contract value per day every
2 Severity 2 Issue from the time the call is subsequent day, subject to a maximum of 5.0
logged by end user. % post which MCGM may invoke Annulment of
Resolution Time: <=4 the contract.
Days from the time the 0.20% of total contract value per day every
call is logged by end user subsequent day, subject to a maximum of 5.0
% post which MCGM may invoke Annulment of
the contract.
Response Time: Daily 0.1% of total contract value per day for the first
3 Severity 3 Issue <= 1 Day from the time day,
the call is logged by end 0.20% of total contract value per day every
user. subsequent day, subject to a maximum of 5.0
Resolution Time: % post which MCGM may invoke Annulment of
<= 10 Days from the the contract.
time the call is logged by
end user.
Response Time: Daily 0.1% of total contract value per day for the first
4 Severity 4 Issue <= 2 Days from the time day,
the call is logged by end 0.20% of total contract value per day every
user. subsequent day, subject to a maximum of 5.0
Resolution Time: % post which MCGM may invoke Annulment of
<= 20 Days from the the contract.
time the call is logged by
end user.
D. New Module Roll out (applicable after receiving formal approval from MCGM for implementation)
< T+2 weeks, Weekly per 0.1% of the yearly contract value per
where T is the project week/part thereof for first two
timeframe for weeks,
completion of the 0.20% of yearly contract value per
Project Initiation &
1 specified activity as week/part thereof for every
Team Mobilization
agreed upon by MCGM subsequent week, subject to a
and Service Provider maximum of 2.0 % post which
MCGM may invoke Annulment of the
contract.
< T+9 weeks, 0.1% of the yearly contract value per
where T is the Weekly per week/part thereof for first two
timeframe for project weeks,
completion of the 0.20% of yearly contract value per
Requirements Analysis
2 specified activity as week/part thereof for every
& Design
agreed upon by MCGM subsequent week, subject to a
and Service Provider maximum of 2.0 % post which
MCGM may invoke Annulment of the
contract.
< T+35 weeks, Weekly per 0.1% of the yearly contract value per
where T is the project week/part thereof for first two
timeframe for weeks,
completion of the 0.20% of yearly contract value per
3 Development & Coding specified activity as week/part thereof for every
agreed upon by MCGM subsequent week, subject to a
and Service Provider maximum of 2.0 % post which
MCGM may invoke Annulment of the
contract.
< T+42 weeks, Weekly per 0.1% of the yearly contract value per
where T is the project week/part thereof for first two
timeframe for weeks,
completion of the 0.20% of yearly contract value per
4 Testing & UAT specified activity as week/part thereof for every
agreed upon by MCGM subsequent week, subject to a
and Service Provider maximum of 2.0 % post which
MCGM may invoke Annulment of the
contract.
Submission of required Weekly per 0.1% of the total contract value per
reports as per the time project week/part thereof for first two
lines finalized with the weeks,
Operations, department 0.20% of total contract value per
5 Maintenance (Maintenance/ Support/ week/part thereof for every
&Warranty support reports, Escalation subsequent week, subject to a
Reports) maximum of 5.0 % post which MCGM
may invoke Annulment of the
contract.
E. Miscellaneous Factors
Compliance in document
versioning and maintenance
(FRS, SRS, Business Blue Prints, 100% as per requirement Daily per Rs.10,000 per occurrence per
1
User Training Manual etc.), timelines occurrence day of delay.
application version control,
updates & patches etc.
6. Scope of Services Under each System upgrades (Maximum duration for all type of up
gradation should not be more than Three Months) :
In this activity a technical upgrade will be carried . In this upgrade all existing programs, includes screens,
menus, user exits, custom reports will be taken care and adopted to the new version.
This will be a technical upgrade where from Service Provider side Service provider will ensure that
all, Transactions, ABAP reports ,outputs and Reports which are currently are being used are taken care on
the new Upgraded system. Post Upgrade , System Provider will provide support for any issue related the
above upgrade activity.
The functional related activities like UAT required during the upgrade need to be taken care by
Service provider in coordination with MCGM Team. Scope of below proposal is for BASIS related activities
only and ABAP objects affected during the upgrade.
1. ECC Upgrade
3. CRM Upgrade
4. SRM Upgrade
5. Bobj Upgrade
SAP Functional Upgrade: In this activity functional upgrade will be carried . In this upgrade all existing
functions, includes screens, menus, user exits, custom reports will be taken care and adopted to the new
version.
This will be a functional upgrade where from Service Provider side Service provider will ensure that all,
Transactions, ABAP reports ,outputs and Reports which are currently are being used are taken care on the
new Upgraded system/ Post Upgrade , System Provider will provide support for any issue related the
above functional upgrade activity.
The functional related activities like UAT required during the upgrade will be taken care by the Service
Provider in coordination with MCGM Team
Note: In case of SAP S/4 HANA implementation this would be a prerequisite step.
7. Disclaimer
The Corporation retains the liberty to change the specifications of the Services to be procured. The
suggestion / objections received may or may not be considered if the same is not in consonance with the
requirements, MCGM reserves it right to reject the same.