Mr. Narsinhbhai Bhavanbhai Kuniya Feasibility Report-New
Mr. Narsinhbhai Bhavanbhai Kuniya Feasibility Report-New
)-462001
GUJARAT OFFICE: 408, 4TH FLOOR, RIDHAM PLAZA, AMAR JAWAN CIRCLE, NEAR S.P. RING ROAD, NIKOL,
AHMEDABAD, MOBILE# +91-756-722-4274
Dated: 09/11/2024
To,
MR. NARSINHBHAI BHAVANBHAI KUNIYA
Preliminary Feasibility Report for Proposed M/s Reliance BP Mobility Limited Retail Outlet at
SH-54, under constructed 4 lane SH road, Ch. ***, Survey No. 239, At Location Village:
MALUPUR, Tehsil: THARAD, Dist: BANASKANTHAA, in the state of GUJARAT-283126.
A). Check List for getting approval for installation of new Fuel Stations along National
Highways
Min :30mx30m
II. Urban area stretch
Min 20mx20m
III. Hilly/mountainous
3 Distance from
intersection:
(i) Intersection with Minimum 100 m for Not within 300m YES
any category of Urban
road/median gap Minimum 300 m for
Ruler Site
Minimum 100 M For
hill
4 Distance from check Minimum 1000 m Not within 1000m YES Lat - long to be
barrier/toll provided from
plaza/railway level funnel end
crossing
Shall
conduct
groundwat
er and soil
quality
monitoring
by the Oil
Marketing
Company
Automation
System as
approved
by PESO
without
considering
the
establishm
ent date.
Pl check & confirm that Surface water bodies with in 100m radius of the proposed site are in the
revenue records of the State/UT.
G) Observation / Recommendation
As per the above information/report, proposed location for setting up of retail outlet at location of
proposed retail outlet at SH-54, under constructed 4 lane SH road, Ch. ***, Survey No. 239, At
Location Village: MALUPUR, Tehsil: THARAD, Dist: BANASKANTHAA, in the state of
GUJARAT-283126.
Hence the Site is Feasible for putting up NRO inline with the prevailing MoRTH Guidelines RW-
NH-33032/01/2017-S&R(R) Dated: 26th June, 2020}
Note:
1) ROW has been confirmed thru Road Construction Agency Officials& PIU Office for the
Stretch. ROW is xx Meters.
2) Addl info, if any.
CONTROL LINE
60 M
SITE NO.-239, FOR ACCESS PERMISSION,
AT VILLAGE :- MALUPUR, TEHSIL -
75
PROW
40
30
EROW
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
14
CONTROL LINE
60 M
SITE NO.-239, FOR ACCESS PERMISSION,
AT VILLAGE :- MALUPUR, TEHSIL -
75
PROW
40
30
EROW
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
14
PROP.
60.00
SITE
APPROACH ROAD
1100M
TO RESIDENCE
400M
200M
900M
300M
500M
600M
700M
800M
100M
INDUSTRY AASHAPURA
BRICKS
TAR ROAD
1000M
ROW
S S S S S
30 M
KM-41
TAR ROAD
S
EXISTING BUS
BPCL RO STOP
185.00 416.00
505.00
S
PROP.
60.00
SITE
1100M
1000M
KACHCHA ROAD
KACHCHA ROAD
KACHCHA ROAD
200M
900M
800M
700M
600M
300M
500M
100M
FARM BANAS
TO HOUSE
H
400M
HOUSE NEER
ROW
30 M
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
TOWARDS DEESA >>>
<<< TOWARDS THARAD 7 M WIDE EXISTING MAIN CARRIAGEWAY SH-54
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
KACHCHA ROAD
KACHCHA ROAD
RCC ROAD
TO HOUSES
CD
H WORK
FARM
NURSERY
HOUSE