Mr. Narsinhbhai Bhavanbhai Kuniya Feasibility Report-New

Uploaded by

pxm24b2shashankr
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 14

HEAD OFFICE: KAINAT APARTMENT, PNB COLONY, FLAT #1, IDGAH HILLS, BHOPAL (M.P.

)-462001

GUJARAT OFFICE: 408, 4TH FLOOR, RIDHAM PLAZA, AMAR JAWAN CIRCLE, NEAR S.P. RING ROAD, NIKOL,
AHMEDABAD, MOBILE# +91-756-722-4274

Dated: 09/11/2024

SITE FEASIBILITY REPORT

To,
MR. NARSINHBHAI BHAVANBHAI KUNIYA

Preliminary Feasibility Report for Proposed M/s Reliance BP Mobility Limited Retail Outlet at
SH-54, under constructed 4 lane SH road, Ch. ***, Survey No. 239, At Location Village:
MALUPUR, Tehsil: THARAD, Dist: BANASKANTHAA, in the state of GUJARAT-283126.

LAT/LONG- 24.363389, 71.692389

ABOUT RETAIL OUTLET:-


Proposed site of the Retail Outlet situated at SH-54, under constructed 4 lane SH road, Ch. ***,
Survey No. 239, At Location Village: MALUPUR, Tehsil: THARAD, Dist: BANASKANTHAA,
in the state of GUJARAT-283126. (Plot size 60m x 60m) which is in confirmation to the
Ministry of Road Transport and Highways Norms dated 26.06.2020 and other mandatory
features have been shown as below:

PROPERTY LOCATION MAP


(Showing boundaries & landmark – GPS photo with proposed plot mark up
Applicant Name : Mr. Narsinhbhai Bhavanbhai Kuniya

PROPERTY PHOTOGRAPHS AS ON Date (trail points to covered)

• STARTING POINT OF THE PLOT FRONT SIDE-PHOTO ATTACHED BELOW


• CENTRE POINT OF THE PLOT FRONT SIDE- PHOTO ATTACHED BELOW
• END POINT OF THE PLOT FRONT SIDE - PHOTO ATTACHED BELOW
• FROM FRONT OF THE PLOT TOWARDS -
• NEAREST MILE STONE KM STONE- NOT AVAILABLE.
• NEAREST MILE STONE KM STONE- NOT AVAILABLE.
• NEAREST MILE STONE KM NOT AVAILABLE.

LAND Measurement plan (SURVEY NO. 239) - with Evidence


Khara/Kasba details - with Evidence- NOT AVAILABLE
Location Norms of Rural/Urban/Hilly stretch of National /State Highway

{Enclosure to Ministry of Road Transport and Highways letter no. RW-NH-33032/01/2017-


S&R(R) Dated: 26th June, 2020}

A). Check List for getting approval for installation of new Fuel Stations along National
Highways

1. National Highway Number SH-54


2. State GUJARAT
3. Location SH-54, under constructed 4 lane SH road, Ch. ***,
Survey No. 239, At Location Village: MALUPUR,
Tehsil: THARAD, Dist: BANASKANTHAA, in the
state of GUJARAT.
4. (Chain age in Km) NOT AVAILABLE
5. [Side of NH /SH (left or right side of NH
towards increasing chain age/km.
Direction)]
6. Name of Highway Authority District Collector Office, Banaskantha, PESO
(NHAI/PWD/BRO/MPRDC) Department, Gram Panchayat Tharad
7. Highway Administration address: JORAVAR PALACE, AMBIKA SOCIETY,
PALANPUR, GUJARAT 385001
8. Name of Oil Company (as applicable) M/S RELIANCE BP MOBILITY LIMITED

9. Whether the Fuel Station is part of a NO


Rest-area complex
B). For Retail Outlet on existing service road/slip road
S.No Item MORTH MORTH Whether Evidence
Norms Norms complying requirement
Measurement with
at site MORTH
Norms**
1 Whether The Retail Outlet is NA NA Photo
On Service Road/Slip Road required
(and Not on Entry /Exit Ramp
of Service Road/Slip Road)
2 Size of plot
Min : 35mx35m 60m x 60m Plot Sketch
I. Rural stretch attached

Min :30mx30m
II. Urban area stretch

Min 20mx20m
III. Hilly/mountainous

3 Whether The Retail Outlet Applicable /NA YES


Satisfy The General
Condition Of Sitting, Access
Condition, Drainage, Building
Line, Sign Boards Etc.
Depending Upon The
Availability Of Land
C) NH Checklist
S.No Item MORTH Norms Measurement at Whether Evidence
Site complying with required
MORTH /NH
Norms** _

1 Acceleration lane Minimum 100m YES

2 Deceleration lane Minimum 70m YES

3 Distance from
intersection:
(i) Intersection with Minimum 100 m for Not within 300m YES
any category of Urban
road/median gap Minimum 300 m for
Ruler Site
Minimum 100 M For
hill

4 Distance from check Minimum 1000 m Not within 1000m YES Lat - long to be
barrier/toll provided from
plaza/railway level funnel end
crossing

5 Distance from start of Minimum 200 m YES Photo


approach road of road Not within 200m
over bridge
6 Distance from start of Minimum 300 m Not within 300m YES
grade
separator/flyover
7 Distance from nearest 300 m- Undivided Not within 1000m YES
fuel station undivided Carriage way,
carriageway (for both 1000 m- Divided
side of carriageway), carriage way.
or divided carriageway
(with no gap in median
at this location)
8 Provision of Necessary at Existing ROW in YES
service/connecting clustering of retail Meters.
road outlet/intersection
with any category of
road less than
300m/1000m

(i) Length of the [Mention the YES


service road including lengths in Meter]
deceleration and
acceleration lanes
(ii) Whether additional [Mention the YES
Land acquisition is lengths in Meter]
required (for service
roads/turning radius)
(iii) If yes, mention the [Mention Area in YES documentary
extent of additional (sq.m)] evidence of the
D) FEASIBILITY AS PER CPCB NORMS
For Site: SH-54, under constructed 4 lane SH road, Ch. ***, Survey No. 239, At Location
Village: MALUPUR, Tehsil: THARAD, Dist: BANASKANTHAA, in the state of GUJARAT-
283126.
S.No. If Then Measuremen Feasibility Evidenc
t (Yes/No ) es
site
I. As Per Clause (a) of Addendum As Per (Lat
to the Guidelines Clause (a) ,Long )
of
Petrol pumps located near to a Addendum
lake, ponds, streams, rivers, to The YES
wetlands, canals and creeks, as Guidelines
per revenue. In case of streams,
rivers the distance shall be Shall not
considered from the floodway. ln be located
case floodway is not defined, the within a
distance shall be considered from distance of
firm banks/edge of the river. 50 mtrs
from the
nearest
point of the
water
bodies.
2. As Per Clause (b) of Addendum As Per
to The Guidelines Clause (b)
of
Addendum
RO coming within 50 mtrs to 100 to The YES
mtrs from the nearest point of Guidelines
surface water Bodies.
Shall have
secondary
contamina
nt by way
of double
walled
tanks or
concrete
protection
walls
around the
w1dergrou
nd storage
tank.
3. As Per Clause (d) of Addendum As Per Lat ,long
to The Guidelines Clause (d)
of
All new retail out lets within I00 Addendum
mtrs from the nearest point of to The YES
surface water bodies. Guidelines

Shall
conduct
groundwat
er and soil
quality
monitoring
by the Oil
Marketing
Company
Automation
System as
approved
by PESO
without
considering
the
establishm
ent date.
Pl check & confirm that Surface water bodies with in 100m radius of the proposed site are in the
revenue records of the State/UT.

E) Feasibility Check as Per CPCB Guidelines- January 7, 2020

S. If Then Measurement feasibility


No.
I. As Per Clause A 1 As Per Clause A 1
Petrol pumps located in Shall have a
the area with high secondary
groundwater table areas contaminant by way
i.e. groundwater levels of double walled tanks
less than 4 mtrs. Or
Concrete protection
walls to minimize
groundwater and soil
contamination.
2. New Retail Outlet shall not No House/Residential If Yes provide Evidence
be located within a radial Building, (photos) also prepare a
distance of 50m (from fill School/College, sketch plan of site with
point/vent pipe/dispensing Hospital (10 beds & 30m, 50m and 100m
unit whichever is nearest) above) is falling within radius circle marking all
from schools, hospitals 50m. structures appearing
(10 beds and above) and there with their utility
residential areas If falls within 30m- (usage) and distance
designated as per local 50m, then additional from plot boundary.
laws. Safety measures to Samples attached Ann. I
be implemented.

3. If Site with Sale potential As Per Clause D1


of 300KL MS per month Shall be provided with
located in municipal limits Vapour Recovery To be
of city with population System (VRS). checked
more than I Lakhs.

4. If Site with Sale potential As Per Clause D2


of 100KL MS per month Shall be provided with
located in municipal city Vapour Recovery To be
limit of city with System (VRS) checked
population more than 10
Lakhs.

5 If Site is located in NCR Shall be provided with


region VRS at at the thee of
commissioning.

F) Feasibility Check as Per HSE

S. Points HSE Distance Details/Evidences


No. complied
I. Transmission Line crossing Yes From : Plot 1. Pole height
passing through plot boundary 2. Voltage in KVA
3. Photo(front ,side
and back)
II. HT Line crossing passing Yes From: Plot 1. Pole height
through plot boundary 2. Voltage in KVA
3. Photo (front ,side
and back)
III LT Line crossing passing Yes From: Plot 1. Pole height
through plot boundary 2. Voltage in KVA
3. Photo (front ,side
and back )
Overhead electrical line Yes
passing in front of Site over
entry /Exit passages.
Overhead electrical line Yes Specify Feasibility of
passing within 3 m of Side relocation
/rear boundary of the Site.
Any electrical transformer Yes Specify Feasibility of
located within plot of within 3 relocation
m distance of the plot
boundary;.
IV Any Product/Gas pipeline Yes From: Plot 1. Depth of the
crossing plot area boundary pipeline
2. size of the
pipeline
3. owner of pipeline
4. Product name

V Heavy Structure availability Yes From: Plot 1. Purpose


• More than 1 tons boundary 2. Photo
• Size : 3*3 meter 3. Approval copy if
possible

VI Nearest Fire Brigade *mandatory Approximately 1.THARAD FIRE


10.27km STATION
2. contact number -101
VII Nearest Hospital *mandatory 6.61 km 1. SANJIVINI
MEMORIAL HOSPITAL
2. 07947148409
VIII Nearest Police station *mandatory Police chowky 1.THARAD POLICE
at 8KM STATION
2. contact number -108

G) Observation / Recommendation
As per the above information/report, proposed location for setting up of retail outlet at location of
proposed retail outlet at SH-54, under constructed 4 lane SH road, Ch. ***, Survey No. 239, At
Location Village: MALUPUR, Tehsil: THARAD, Dist: BANASKANTHAA, in the state of
GUJARAT-283126.

• Meets All The Criteria of CPCB Guidelines.


• Does conditionally meet MoRTH/NH guidelines.
• Meets the HSE criteria
• Addl Info, if any.

Hence the Site is Feasible for putting up NRO inline with the prevailing MoRTH Guidelines RW-
NH-33032/01/2017-S&R(R) Dated: 26th June, 2020}
Note:
1) ROW has been confirmed thru Road Construction Agency Officials& PIU Office for the
Stretch. ROW is xx Meters.
2) Addl info, if any.

ATTACH LAND DOCUMENTS& PHOTOGRAPHS

ATTACH Drawing – as shown in following example

CPCB Norms – Available structures etc. Ann.I


PROPOSED LAYOUT FOR SURVEY NO.-239, FOR ACCESS PERMISSION,
AT VILLAGE :- MALUPUR, TEHSIL - THARAD & DIST.- BANAS KANTHA ON SH-54
60 M

CONTROL LINE

PROP. PROPOSED LAYOUT FOR SURVEY

60 M
SITE NO.-239, FOR ACCESS PERMISSION,
AT VILLAGE :- MALUPUR, TEHSIL -
75

THARAD & DIST.- BANAS KANTHA


ON SH-54
BUILDING LINE
10

PROW
40
30

EROW
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
14

7 M WIDE EXISTING MAIN CARRIAGEWAY SH-54 TOWARDS DEESA >>>


<<< TOWARDS THARAD
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
60 M

CONTROL LINE

PROP. PROPOSED LAYOUT FOR SURVEY

60 M
SITE NO.-239, FOR ACCESS PERMISSION,
AT VILLAGE :- MALUPUR, TEHSIL -
75

THARAD & DIST.- BANAS KANTHA


ON SH-54
BUILDING LINE
10

PROW
40
30

EROW
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
14

7 M WIDE EXISTING MAIN CARRIAGEWAY SH-54 TOWARDS DEESA >>>


<<< TOWARDS THARAD
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
60.00 183.00 410.00

PROP.
60.00

SITE

APPROACH ROAD

1100M
TO RESIDENCE

400M
200M

900M
300M

500M

600M

700M

800M
100M

INDUSTRY AASHAPURA
BRICKS

TAR ROAD

1000M
ROW

S S S S S
30 M

KM-41

UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)


TOWARDS DEESA >>>
<<< TOWARDS THARAD 7 M WIDE EXISTING MAIN CARRIAGEWAY SH-54
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
KACHCHA ROAD

TAR ROAD
S
EXISTING BUS
BPCL RO STOP

185.00 416.00
505.00

236.00 245.00 54.00 60.00

S
PROP.

60.00
SITE
1100M

1000M

KACHCHA ROAD

KACHCHA ROAD

KACHCHA ROAD
200M
900M

800M

700M

600M

300M
500M

100M
FARM BANAS

TO HOUSE
H

400M
HOUSE NEER

ROW
30 M
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)
TOWARDS DEESA >>>
<<< TOWARDS THARAD 7 M WIDE EXISTING MAIN CARRIAGEWAY SH-54
UNDER CONSTRUCTED ROAD (FOUR LANING UNDER PROCESS)

KACHCHA ROAD

KACHCHA ROAD

RCC ROAD
TO HOUSES
CD
H WORK
FARM
NURSERY
HOUSE

218.00 137.00 162.00