Design Report

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views10 pages

Design Report

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 10

Project- Up-gradation & Four Laning of Paonta Saheb- Ballupur Section of NH- 72 in

the State of Uttarakhand under NH(O) on Hybrid Annuity Mode. Package-1: Paonta
Saheb to Medinipur from Design CH 0.000 to CH 18.700.

Title: DESIGN OF FRICTION SLAB WITH CRASH BARRIER

CLIENT NATIONAL HIGHWAY AUTHORITY OF INDIA

29/08/2023 For Approval


Rev Date Description Document No.
Design consultant :
CIVIL MANTRA INFRACON PRIVATE LIMITED
DESIGN OF CRASH BARRIER

The design of crash barrier is done for the minimum design resistance as given in
Table 10 of Amendment No.5/IRC:6/August,2019. the minimum design resistance criteria for
crash barrier is as follows:

Panel nominal Panel nominal shear


Barrier Containment Level
bending moment (kN/panel)
Nominal Containment
without shear transfer 100 KN OVER 1.0 m 80L
between panels

A1) Typical section at base of crash barrier : 450mm thickness of crash barrier

Myy (perpendicular Mzz (parallel to


N (axial) V (Shear)/m
S.N to traffic ) traffic)
KN KN/m KNm KNm
1 7.4 80 104.5 0

A2) Typical section at base of crash barrier : 175mm thickness of crash barrier

Myy (perpendicular Mzz (parallel to


N (axial) V (Shear)/m
S.N to traffic ) traffic)
KN KN/m KNm KNm
1 4.2 80 75 0
DESIGN OF CB WITH FRICTION SLAB
450
275
175 175
50 50

750
1100 1
2
3 250
6 4 1785
50 5 100 53
2'
230 L 3' 300 1" 300
615 1' 90
280 4' 2'' 3'' 250

100 250 2550

Details of crash barrier with friction Slab

Density of RCC= 2.5 T/m^3


Density of Soil= 2.0 T/m^3
Length of panel = 3.5 m

Selfweight :
1 Crash Barrier P1 = NORMAL CONTAINMENT
2
Cross-sectional area of crash barrier = 318150 mm
Weight of Crash Barrier V1 = 0.796 T/m

Area No. A(mm2) LA (mm) A*Y


1 201775.00 87.50 17655312.50
2 18750.00 191.67 3593750.00
3 12500.00 200.00 2500000.00
4 21875.00 283.33 6197916.67
5 34425.00 287.50 9897187.50
6 28825.00 16.67 480416.67
318150.00 40324583.34

Cg from point L = 0.077 m


2 Friction Slab
2
Cross-sectional area of friction slab = 0.990 m
Weight of friction slab V2 = 2.474 T/m

Area No. A(mm2) LA (mm) A*Y


1' 637500 1625 1035937500
2' 184500 657.5 121308750
3' 80500 175 14087500
3'' 87075 1610 140190750
989575 1311524500

Cg from point L = 1.276 m

3 Fill above friction slab


2
Cross-sectional area of Wearing Coat/Fill = 0.616 m
above friction slab 0.033
Weight of Wearing V3 = 1.232 T/m
Coat/Fill above V4 0.072 T/m

2
Area No. A(mm ) LA (mm) A*Y
1" 615825 1857.5 1143894938
2" 32595 760 24772200
648420 1168667138

Cg from point L = 1.808 m


= 0.71 m

Horizontal Forces

Ka = Coefficient of active pressure


β = angle of surcharge, i.e., slope of the retained earth with horizontal
φ' = angle of repose of soil
H = Total ht. of earth above the base of footing

β = 0 degree
φ' = 33 degree
Cos β = 1
Cos φ' = 0.83867057
Ka (at rest earth pressure) = 0.295
H = 0.25 m
Density of soil = 2.0 T/m^3

Earth pressure due to Fill over friction 0.019 T/m


slab (H1) =
Lever Arm = 0.15 m

Earth Pressure due to live load 0.177 T/m


Surcharge (H2) =

Lever Arm = 0.125 m

Horizontal Force due to NORMAL 10 T/m


CONTAINMENT (H3) =

Crash Barrier (Point of impact top of crash barrier)

Lever arm from point L = 1.215 m

Check for equilibrium

Basic Combination
Factored
Descript Load/For Factored
S.No. Factor Load (T/m) LA (m) Moment (T- Remark
ion ce Load (T)
m)
Wt.
1 Crash V1 0.9 0.796 0.72 0.08 0.06 Stabilizing
Barrier
Wt.
2 Friction V2 0.9 2.474 2.23 1.28 2.84 Stabilizing
Slab
Wt.
3 V3 0.9 1.232 1.11 1.81 2.00 Stabilizing
backfill
4 WC V4 0.9 0.072 0.06 0.71 0.05 Stabilizing
Earth
5 H1 1.5 0.019 0.03 0.15 0.00 Destabilizing
Pressure
Live
load
6 H2 1.2 0.177 0.21 0.13 0.03 Destabilizing
Surchar
ge
Impact
7 H4 0.0 10 0.00 1.22 0.00 Destabilizing
on CB

Total Stabilizing Moment (Ms) = 4.95 Tm/m


Total Destabilizing Moment (Mo) = 0.03 Tm/m

Check for Overturning

FOS overturning = Ms/Mo


= 160.461 > 2 Ok
Check for Sliding

Total Sliding Force H = 0.33 T/m


Total Restoring Force V = 4.12 T/m
µ = 0.65

FOS sliding = µ

= 8.087 > 1.5 Ok

Accidental Combination
Descript Load/For Factored Factored
S.No. Factor Load (T/m) LA (m) Remark
ion ce Load Moment
Wt.
1 Crash V1 1.0 0.796 0.80 0.08 0.06 Stabilizing
Barrier
Wt.
2 Friction V2 1.0 2.474 2.47 1.28 3.16 Stabilizing
Slab
Wt.
3 V3 1.0 1.232 1.23 1.81 2.23 Stabilizing
backfill

4 WC V4 1.0 0.072 0.07 0.71 0.05 Stabilizing

Earth
5 H1 1.0 0.019 0.02 0.15 0.00 Destabilizing
Pressure
Live
load
6 H2 0.0 0.177 0.00 0.13 0.00 Destabilizing
Surchar
ge
Impact
7 H4 1.0 2.857 2.86 1.22 3.47 Destabilizing
on CB

Total Stabilizing Moment (Ms) = 5.50 Tm/m


Total Destabilizing Moment (Mo) = 3.47 Tm/m

Check for Overturning

FOS overturning = Ms/Mo


= 1.582 > 1 Ok

Check for Sliding

Total Sliding Force H = 2.88 T/m


Total Restoring Force V = 4.57 T/m
µ = 0.65
FOS sliding = µ

= 1.034 > 1 Ok

Check for ULS


Descript Load/For Factored Factored
S.No. Factor Load (T/m) LA (m) Remark
ion ce Load Moment
Wt.
1 Crash V1 1.35 0.796 1.07 0.08 0.08 Stabilizing
Barrier
Wt.
2 Friction V2 1.35 2.474 3.34 1.28 4.26 Stabilizing
Slab
Wt.
3 V3 1.50 1.232 1.85 1.81 3.34 Stabilizing
backfill
4 WC V4 1.75 0.072 0.13 0.71 0.09 Stabilizing
Earth
5 H1 1.50 0.019 0.03 0.15 0.00 Destabilizing
Pressure
Live
load
6 H2 1.20 0.177 0.21 0.13 0.03 Destabilizing
Surchar
ge
Impact
7 H4 0.00 10 0.00 1.22 0.00 Destabilizing
on CB

Total Stabilizing Moment (Ms) = 7.68 Tm/m


Total Destabilizing Moment (Mo) = 1.17 Tm/m

Check for Overturning

FOS overturning = Ms/Mo


= 6.584 > 2 Ok

Check for Sliding

Total Sliding Force H = 0.36 T/m


Total Restoring Force V = 6.26 T/m
µ = 0.65

FOS sliding = µ

= 11.196 > 1.5 Ok


Design of Friction Slab Section

Grade of Concrete = M40


Grade of Steel = Fe500
Modulus of Elasticity of Steel (Es) = 200 Gpa
fck = 40 Mpa
fcd = 17.87 Mpa
fct = 3.00 Mpa
fy = 500
Width = 1000 mm
Depth = 250 mm
Depth of Neutral Axis, Xu = 23 mm
(0.87xfyxAst)/(0.362xfckxb) Under reinforced section

Cover = 45 mm
Xu max = 122.73 mm
0.0035d/(0.0055+0.87xfy/Es)

M = 11.67 Kn-m/m
Factured Mu = 17.508 Kn-m/m
Ru,lim = 5.35 Mpa
drequired = 57.21 mm
dprovided = 199.0 mm OK
Rdesign = 0.442 Mpa
Ast(required) = 310.440 mm2/m
12mm dia @ 150mm c/c

Ast(Provided) = 753.98 mm2/m OK

Distribution Reinforcement
10mm dia @ 200mm c/c

Minimum Reinf. = 50% of Main reinforcement provided


Ast(required) = 376.991 mm2/m
Ast(Provided) = 392.70 mm2/m OK

Design of Crash Barrier Section

According to IRC 06-2014 cl-206.6 (Table 9)


Minimum moment of resistance for bending in
= 100 kN-m/m
vertical plane
Factored Moment Mu = 42.857 kN-m/m
Impact Load (Acting at top of crash Barrier assumed) = 53.571 kn/m
Distance of impact load from paved surface
(bottom of crash barrier) = 1.1 m
Moment due to impact load Mu = 58.93 kN-m/m

Ru,lim = 5.35 Mpa


Depth of crash barrier 'D' = 450 mm
dprovided = 399 mm OK
drequired = 104.95 mm
Rdesign = 0.370 Mpa
Main Reinforcement
Ast(required) = 622.440 mm2/m
12mm dia @ 150mm c/c
Ast(Provided) = 753.98 mm2/m OK

Distribution Reinforcement
Minimum Reinf. = 50% of Main reinforcement provided
Ast(required) = 376.99 mm2/m
10mm dia @ 200mm c/c
Ast(Provided) = 392.70 mm2/m OK

Design of Haunch Portion (connecting friction slab and crash barrier)

Impact Load (Acting at top of crash Barrier assumed) = 53.571 kn/m


Distance of impact load from the CG of
=
haunch protion (At point H) 1.215 m
Moment due to impact load Mu = 65.089 kn-m/m
Ru,lim = 5.35 Mpa
Depth of haunch 'D' = 300 mm
dprovided = 249mm dia mm OK
drequired = 110.30 mm
Rdesign = 1.05 Mpa
Main Reinforcement
Ast(required) = 620.280 mm2/m
12mm dia @ 150mm c/c

Ast(Provided) = 753.98 mm2/m OK

Distribution Reinforcement
Minimum Reinf. = 50% of Main reinforcement provided
Ast(required) = 376.99 mm2/m
10mm dia @ 150mm c/c
Ast(Provided) = 523.60 mm2/m OK