Techyy

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views6 pages

Techyy

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 6

STORE

I. CONCRETE WORKS
1. Footing Materials Quantity/ Cost per Unit Total
Unit Cost
a. Portland Cement
b. Sand (Washed/Screened)
c. Gravel (3/4 Washed/Screened)
d. GI Tie Wire #16
Total Cost of Materials
2. Column
a. Portland Cement
b. Sand (Washed/Screened)
c. Gravel (3/4 Washed/Screened)
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
3. Floor Slab
a. Portland Cement
b. Sand (Washed/Screened)
c. Gravel (3/4 Washed/Screened)
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
Sub-Total Cost
II. MASONRY WOKS
1. CHB Wall, Wall Footing
a. Portland Cement
b. Sand (Washed/Screened)
c. CHB 4”
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
2. Form works and Scaffoldings
a. Marine Plywood
(9mmx1.20x2.40)
b. 2”x2”x12 form Lumber
c. 2”x3”x12 form Lumber
d. CWN #4
e. CWN Assorted Sizes
Total Cost of Materials
Sub-Total Cost
III. ROOFING AND STRUCTURAL ROOF FRAMING WORKS
1. Roof Framing
a. Plywood (size)
b. GI Tie Wire #16
c. 10 mm dia. RSB
Total Cost of Materials
2. Roofing
a. Portland Cement
b. Sand (Washed/Screened)
Total Cost of Materials
Sub-Total Cost
IV. WINDOWS, DOORS, DIVISIONS, AND TILING
1. Doors
a.
b.
c.
Total Cost of Materials
2. Divisions
a.
b.
c.
Total Cost of Materials
V. ELECTRICAL WORKS
a.
b.
c.
Total Cost of Materials
Sub-Total Cost
Total Materials Cost
Total Labor Cost (30% of total material cost)
TOTAL PROJECT COST

WAREHOUSE
VI. CONCRETE WORKS
1. Footing Materials Quantity/ Cost per Unit Total
Unit Cost
e. Portland Cement
f. Sand (Washed/Screened)
g. Gravel (3/4 Washed/Screened)
h. GI Tie Wire #16
Total Cost of Materials
2. Column
a. Portland Cement
b. Sand (Washed/Screened)
c. Gravel (3/4 Washed/Screened)
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
3. Floor Slab
a. Portland Cement
b. Sand (Washed/Screened)
c. Gravel (3/4 Washed/Screened)
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
Sub-Total Cost
VII. MASONRY WOKS
1. CHB Wall, Wall Footing
a. Portland Cement
b. Sand (Washed/Screened)
c. CHB 4”
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
2. Form works and Scaffoldings
a. Marine Plywood
(9mmx1.20x2.40)
b. 2”x2”x12 form Lumber
c. 2”x3”x12 form Lumber
d. CWN #4
e. CWN Assorted Sizes
Total Cost of Materials
Sub-Total Cost
VIII. ROOFING AND STRUCTURAL ROOF FRAMING WORKS
1. Trusses and Roof Framing
a. 2”x4”x6m CEE Purlins
b. 2”x3”x6m CEE Purlins
c. Paint Thinner
d. Red Oxide
e. Welding Rod
Total Cost of Materials
2. Roofing
a. Corr. Roofing Sheet Gauge 26
b. Tekscrew
c. Blind Revit
Total Cost of Materials
Sub-Total Cost
IX. WINDOWS, DOORS, DIVISIONS, AND TILING
1. Doors
a.
b.
c.
Total Cost of Materials
2. Windows
a.
b.
c.
Total Cost of Materials
3. Divisions
a.
b.
c.
Total Cost of Materials
X. ELECTRICAL WORKS
a.
b.
c.
Total Cost of Materials
Sub-Total Cost
Total Materials Cost
Total Labor Cost (30% of total material cost)
TOTAL PROJECT COST

COMFORT ROOM
XI. CONCRETE WORKS
1. Footing Materials Quantity/ Cost per Unit Total
Unit Cost
i. Portland Cement
j. Sand (Washed/Screened)
k. Gravel (3/4 Washed/Screened)
l. GI Tie Wire #16
Total Cost of Materials
2. Column
a. Portland Cement
b. Sand (Washed/Screened)
c. Gravel (3/4 Washed/Screened)
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
3. Floor Slab
a. Portland Cement
b. Sand (Washed/Screened)
c. Gravel (3/4 Washed/Screened)
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
Sub-Total Cost
XII. MASONRY WOKS
1. CHB Wall, Wall Footing
a. Portland Cement
b. Sand (Washed/Screened)
c. CHB 4”
d. GI Tie Wire #16
e. 10 mm dia. RSB
Total Cost of Materials
2. Form works and Scaffoldings
a. Marine Plywood
(9mmx1.20x2.40)
b. 2”x2”x12 form Lumber
c. 2”x3”x12 form Lumber
d. CWN #4
e. CWN Assorted Sizes
Total Cost of Materials
Sub-Total Cost
XIII. ROOFING AND STRUCTURAL ROOF FRAMING WORKS
1. Trusses and Roof Framing
a. 2”x4”x6m CEE Purlins
b. 2”x3”x6m CEE Purlins
c. Paint Thinner
d. Red Oxide
e. Welding Rod
Total Cost of Materials
2. Roofing
a. Corr. Roofing Sheet Gauge 26
b. Tekscrew
c. Blind Revit
Total Cost of Materials
Sub-Total Cost
XIV. WINDOWS, DOORS, DIVISIONS, AND TILING
1. Doors
a.
b.
c.
Total Cost of Materials
2. Windows
a.
b.
c.
Total Cost of Materials
3. Tiling
a.
b.
c.
Total Cost of Materials
XV. ELECTRICAL WORKS
1. Fixtures
a. 1 Gang Switch
b. Utility Box
c. Electrical Tape
Total Cost of Materials
2. Wiring and PVC
a. PVC Junction Box
b. 4x4 Receptacle
Total Cost of Materials
Sub-Total Cost
XVI. PLUMBING WORKS
1. Fixtures
a. Toilet Bowl
b. Floor Drain
c. Faucets
Total Cost of Materials
2. Sanitary Line
a. PVC Pipe 4”dia. S-1000
b. PVC Pipe 2”dia. S-1000
c. PVC Tee 2”dia. S-1000
d. Solvent Cement
e. PVC Sealment
Total Cost of Materials
Sub-Total Cost
Total Materials Cost
Total Labor Cost (30% of total material cost)
TOTAL PROJECT COST