Ma PerformanceValidationv10BL421 (2)
Ma PerformanceValidationv10BL421 (2)
REQUIREMENTS
Market Manual 2: Market Administration
ive
Part 2.20: Performance
Validation
ch
Issue 10.0
Ar
PUBLIC
Disclaimer
The posting of documents on this Web site is done for the convenience of market participants and other
interested visitors to the IESO Web site. Please be advised that, while the IESO attempts to have all
posted documents conform to the original, changes can result from the original, including changes
resulting from the programs used to format the documents for posting on the Web site as well as from the
programs used by the viewer to download and read the documents. The IESO makes no representation or
warranty, express or implied, that the documents on this Web site are exact reproductions of the original
documents listed. In addition, the documents and information posted on this Web site are subject to
change. The IESO may revise, withdraw or make final these materials at any time at its sole discretion
without further notice. It is solely your responsibility to ensure that you are using up-to-date documents
and information.
ive
This document may contain a summary of a particular market rule. Where provided, the summary has
been used because of the length of the market rule itself. The reader should be aware, however, that
where a market rule is applicable, the obligation that needs to be met is as stated in the “Market Rules”.
To the extent of any discrepancy or inconsistency between the provisions of a particular market rule and
the summary, the provision of the market rule shall govern.
ch
Ar
Document ID IESO_REQ_0208
Document Name Part 2.20: Performance Validation
Issue Issue 10.0
Reason for Issue Issued for Baseline 42.1
Effective Date December 4, 2019
Part 2.20: Performance Validation Document Change History
ive
Corrected syntax in several sections
5.0 Updated Section 3.2 Recognition of Inherent Limitation June 1, 2016
with respect to primary frequency response requirements
from wind generators.
Added Figure 5 to illustrate the frequency response
requirements from wind generators.
Updated the List of Acceptable Compensator Dynamic
Models in Section 5.7.
Updated the List of Acceptable Wind Turbine and
Photovoltaic Dynamic Models in Section 5.7 with the
ch
WECC second generation standard models.
6.0 Added Section 2.5 Re-validation Testing and Reporting December 7, 2016
Updated the List of Acceptable Compensator Dynamic
Models in Section 5.7.
7.0 Added GENTPJ to list of acceptable models. June 7, 2017
Reference to PRC-019 and PRC-024 added in §5.
Minor syntax improvements throughout the document.
Ar
8.0 Section 5.7: Added DC4B to the list of Excitation System June 5, 2019
Models.
9.0 Section 5.5 Table 2- Updated: T’do from 2.0 to 6.0 for September 11, 2019
both GENSAL and GENROU models.
10.0 Section 5.7 Updated Wind Turbine and Photovoltaic October 4, 2019
Acceptable Dynamic Model names to reflect PSSE and
DSA nomenclature.
Section 2.3 Updated to make distinction between a new
installation and existing equipment swap between units.
Added LST-48 to Related Documents Table.
Related Documents
Document ID Document Title
LST-48 Part 2.20: Performance Validation
ive
ch
Ar
Table of Contents
Table of Contents ...................................................................................................... i
ive
1. Purpose ............................................................................................................. 2
1.1 Scope ................................................................................................................ 2
1.2 Who Should Use This Manual ........................................................................... 2
1.3 Conventions ...................................................................................................... 2
ive
4.5 Shunt Compensation ....................................................................................... 28
4.6 Transformers ................................................................................................... 28
4.7 Synchronous Condensers and Static var Compensators (SVC) ...................... 28
4.8 Protection Systems ......................................................................................... 28
4.9 Special Protection Systems (SPS)................................................................... 28
List of Figures
Figure 1 - Equipment Performance Requirement Evolution ........................................................ 3
Figure 2 - Dynamic Disturbance Recorder Inputs ....................................................................... 7
Figure 3 - Off-Nominal Frequency No-Trip Requirement ............................................................ 8
Figure 4 - Active Power Speed and Magnitude of Response Requirement ................................ 9
Figure 5 - Primary Frequency Response Requirement..............................................................11
Figure 6 - Voltage Ride Through Requirement ..........................................................................12
Figure 7 - Single-Line Diagram of No-Tripping for Out-of-Zone Faults Requirement .................13
ive
Figure 8 - Example Current Waveform for Showing Fault Clearing Times .................................14
Figure 9 - Positive Sequence Voltage During a Fault ................................................................14
Figure 10 - Reactive Power Requirement at all Levels of Active Power ....................................16
Figure 11 - Reactive Power Priority ...........................................................................................16
Figure 12 - Fixed Admittance Capacitors Compensating Losses Within Generation Facilities...17
Figure 13 - Regulation with Individual Units at Limit ..................................................................18
Figure 14 - Voltage Control Point ..............................................................................................19
ch
Figure 15 - Example of Configuration Which Requires Two AVR Voltage Sources ...................20
Figure 16 - Excitation System Ceiling Requirements .................................................................21
Figure 17 - Power System Stabilizer Phase Compensation Margin ...........................................22
Figure 18 - Temporary Field Current Requirements ..................................................................24
Figure 19 - Capability Curve......................................................................................................25
Figure 20 - Contingency Detection Logic...................................................................................29
Figure 21 - Special Protection System Matrix ............................................................................30
Ar
List of Tables
Table 1 - Default Power Flow and Dynamics Parameters .........................................................41
Table 2 - Default Machine Parameters ......................................................................................41
Table 3 - Default AVR/Exciter Parameters ................................................................................41
Table 4 - Default PSS Parameters ............................................................................................41
ive
ch
Ar
Market Manual
The market manuals consolidate the market procedures and associated forms, standards, and policies
that define certain elements relating to the operation of the IESO-administered markets and the IESO-
controlled grid. Where there is a discrepancy between the requirements within a market manual and
the “Market Rules”, the “Market Rules” shall prevail. Standards and policies appended to, or
referenced in, these procedures provide a supporting framework.
ive
- End of Section -
ch
Ar
1. Purpose
The primary object of the Performance Validation manual is to mitigate risks that equipment will not
be suitable for connection to the IESO-controlled grid. A secondary object is to clarify the scope and
nature of activities that shall be performed by Market Participants to balance a conditional right to
connect to the IESO-controlled grid granted at the end of the connection assessment process with an
obligation to demonstrate equipment performance required during the market entry process. IESO
requires an acceptable level of confidence that models for power system equipment are suitable for its
planning and operating decisions. Performance validation achieves this level of confidence.
ive
1.1 Scope
This Performance Validation manual describes how equipment will be treated as performance
standards evolve, when performance validation is required, what an acceptable validation comprises,
and other topics related to equipment performance.
This Performance Validation manual describes performance requirements and validation procedures
for common components of the IESO-controlled grid with more attention devoted to generating units.
Modelling, testing, and reporting considerations are presented in Section 5.
ch
1.2 Who Should Use This Manual
The Performance Validation manual is for external use by those contemplating connections to the
IESO-controlled grid (ICG) and for internal use by IESO staff.
1.3 Conventions
The standard conventions followed for market manuals are as follows:
Ar
- End of Section -
2. General Requirements
ive
Unchanged
equipment
A connection assessment is required for preserves
Evolving performance requirement modified equipment. Major modifications capability at
Appendix 4.2 Requirement
Time
To assist compliance verification, IESO will document the prevailing performance requirements at the
time of equipment connection.
ive
AVR AVR or PSS or both Speed Regulator
Replacing the AVR or pilot exciter or both in a rotating system would not trigger a need to meet the
prevailing requirements as neither of these are major components. Replacing the main exciter in a
brushless system would not trigger the need to meet the prevailing requirements unless the main
ch
generator field connections were accessible. For generators with accessible slip rings, changing the
main exciter would trigger a need to meet prevailing standards. For static systems, changing both the
excitation transformer and the bridge would trigger an obligation to meet prevailing standards, but
changing either the excitation transformer or the bridge would not trigger this obligation.
It is not acceptable to split the replacement of a major component into a series of minor component
replacements to escape performance requirements in the prevailing standard. The provision to allow
for the replacements with spares is not intended to allow some equipment to perpetually remain below
a higher prevailing performance standard. When an asset owner decides equipment has reached the
Ar
end of its normal design life, replacements must satisfy prevailing performance standards.
Non-major replacements should not inhibit the capability to satisfy a prevailing standard to the extent
practicable. For example, a replacement excitation system transformer should be not only able to
function with the existing bridge but also not preclude meeting prevailing requirements (e.g. required
positive and negative ceiling voltages) when the bridge is replaced if this transformer will be retained.
Performance from an existing spare must maintain existing capability. A spare must satisfy
prevailing requirements at the time of its purchase. For example, replacing a failed dc exciter with an
existing spare is acceptable provided other parameters are unaltered (e.g. AVR settings). In cases of
like-for-like replacements, testing can be limited in scope (e.g. open circuit tests, steady state field
current measurements, etc.) to confirm there will be no material changes in performance.
ive
assessment process is required. Like-for-like applications are streamed into an expedited process for
improved efficiency.
An acceptable validation will generally comprise measurements that closely match simulation
predictions using the models provided. Measured outcomes and simulation results are required to be
expressed in a manner that facilitates comparison by overlying simulations results with measured
outcomes for a given test. In some cases, (e.g. underfrequency trip settings) it will be sufficient to
report a setting and demonstrate that it satisfies the requirement. Testing to demonstrate reliable
performance should be as realistic as reasonably achievable. For example, manually changing from
“AUTO” to “MANUAL” is not as good a bumpless transfer test as pulling the PT fuse as the former
is not a true end-to-end test. Testing conditions must be tailored to mitigate adverse effects of
unexpected or substandard performance.
The Market Participant is responsible for making provisions to test equipment in a safe and
controlled manner. For example, setpoint changes are often ramped rather than stepped during usual
operation. Ramping can interfere with conclusively demonstrating dynamics requirements have been
satisfied. If a step change is necessary to demonstrate performance, the Market Participant will be
responsible for enabling this step change.
Simulation results from detailed models cannot be put forward as validation of models provided for
IESO studies. Measurements are required by IESO to validate performance.
Type tests performed in accordance with recognized standards may reduce the scope of validation
testing. Type tests are especially useful for validating parameters that represent inherent
characteristics (e.g. inertia) or properties onerous to test (e.g. ride-through). Some care should be
taken to avoid confusing vendor acceptance tests with type tests. Type tests are performed by an
accredited and independent testing agency to widely accepted industry standards.
It may be impracticable to guarantee that all elements of a facility, especially those elements not
subject to modification, satisfy all IESO performance requirements. It is sufficient for a Market
Participant to confirm there are no known performance issues and to commit to resolving
performance issues as they become known.
ive
2.5 Re-validation Testing and Reporting
Steady state and dynamic capability of generating units, synchronous condensers, STATCOMS, and
SVCS must be validated on a periodic basis or following modifications that affect capability. Steady
state capability must be re-validated at least every five years. Dynamic capability must be re-
validated at least every ten years.
IESO shall post details concerning re-validation testing and reporting on its public website.
ch
2.6 Equivalent Machine
The “Market Rules” tendency to express performance requirements at a transmission connection
point is intended to cater for both conventional and non-conventional generation. Many aspects of
conventional generating units are either not present or present in a very different form in non-
conventional generation facilities. For example, a 100 MVA hydro-electric unit will have a single
terminal where voltage is regulated while a 100 MVA wind generation facility will have many unit
terminals and none of these terminals may be a suitable voltage regulation point.
Ar
Voltage, active power, and reactive power performance at the connection point for non-conventional
technologies is required to be consistent with that of an equivalent synchronous machine with
characteristic parameters within typical ranges. In the example above, the multiple-unit wind
generation facility will be expected to provide the same voltage support at the connection point as the
single-unit hydro-electric generation facility.
The figure below illustrates the primary voltage and current locations for inputs to the DDR must not
be separated by material impedance. In this figure, blues lines correspond to a set of CT and PT
inputs on the high voltage side of the main output transformer and re d lines on the low voltage side.
Additional inputs, as shown by grey lines, can be useful to identify the source of performance
problems.
The DDR must be capable of recording two sets of channels with the following sampling rates:
1) High speed channels with a capability to store at least 1 second of instantaneous values of the
three phase voltages and currents at a minimum sampling rate of 100 samples per cycle.
2) Low speed channels with the capability to store at least 30 seconds of frequency, positive
sequence voltage, positive sequence current, 3-phase active power, and 3-phase reactive
power at a minimum sampling rate of 1 sample per cycle.
ive
The DDR triggering methods are location sensitive and hence they will be communicated on a
project-by-project basis during the IESO’s market entry process. Typical triggers are low frequency,
low positive sequence voltage and high rate of change of active and reactive power. High/low speed
channels are typically configured to record 200 ms/5 s before a triggering event. DDR records must
be available upon IESO request.
One example of a dynamic disturbance recorder that meets all IESO requirements is the Tesla 4000
by ERL Phase.
ch
Ar
- End of Section –
3. Generator Requirements
The next subsections discuss each technical requirement for generating facilities to mitigate the risk
that equipment will not be suitable for connection. The Table in Section 5.3 summarizes anticipated
tests. Generator models acceptable to IESO are listed in Section 5.7.
ive
This is a requirement not to trip within a defined frequency-time area and it should not be
misinterpreted as a requirement to trip outside of this region. IESO does not have either an
underfrequency trip or overfrequency trip requirement and it discourages unnecessary or premature
equipment tripping for any reason.
61
60.6
60.5
Continuous operation
60
60
Frequency (Hz)
59.5
59.4
59
59
ch
Tripping not permitted in the
58.5
shaded area.
58
57.5
57
57
56.5
3.3 300
1 10 100 1000
Log Time (s)
Ar
Essential auxiliary functions also must not trip within this frequency-time region. Generators have
discretion to select the number of frequency-time pairs to define a tripping requirement but no pair
can be within the forbidden region.
Droop
Droop will be calculated on a generation facility basis. For a combined-cycle facility, the droop for
the gas units will be required to compensate to the extent practicable for steam units. Reducing unit
droop below 3% to achieve an overall facility droop of 4% will not be required by IESO.
Some types of generation (e.g. hydro-electric) may require different governor control settings to
achieve both a rapid response during interconnected operation and a stable response during island
operation. The switch between these two settings must be automatically triggered by conditions that
are subject to IESO approval. Normally either frequency alone or a combination of frequency and
rate of change of frequency would be an acceptable trigger to switch to island settings. Where a
recognized contingency would establish an island, this automatic switch should take place for
frequency deviations larger than required to initiate the first step of automatic underfrequency load
ive
shedding (i.e. 59.3 Hz). Where an extreme contingency would be required to establish an island, this
automatic switch should take place for frequency deviations larger than the frequency declines (i.e.
58.0 Hz) the automatic underfrequency load shedding program is intended to limit.
100%
Speed
99%
ch
Response (MW)
10 s 30 min
Ar
101%
Speed
100%
Response (MW)
10 s 30 min
ive
Functional requirements for this feature are as follows:
- The active power boost shall be triggered when frequency drops below 59.7 Hz.
- The boost activation time shall not exceed 1 second.
- The boost must exceed 10% of pre-trigger active power.
- The boost shall last at least 10 seconds if frequency remains under 59.964 Hz.
- The boost shall be cancelled if frequency rises above 59.964 Hz.
- The rate of energy withdrawn from the system during active power recovery must in general
be less than the rate of energy injected into the system during the active power boost.
- Following activation, the boost capability shall be available again within 30 minutes.
ch
Representative responses of a wind turbine with this feature placed in-service, consistent with the
functional requirements above, are shown in Figure 5 below for two illustrative cases (corresponding
to two different triggering events).
Solar generation does not now have a similar store of energy so active power increases are not yet
required from solar installations, but this may change as technology evolves.
All generation types (e.g. conventional, wind, solar) must reduce active power for overfrequency
excursions outside of the ±0.06% (i.e. 36 mHz) deadband.
Ar
ive
ch
Figure 5 - Primary Frequency Response Requirement
Ar
Equipment must not trip for spikes associated with routine high voltage capacitor switching,
automatic reclosure, or for design criteria contingencies that do not disconnect generation facilities by
configuration. Lightning strikes on the IESO-controlled grid also must not result in generation unit
trips unless disconnected by configuration. Minor internal upsets must also not result in equipment
tripping. For example, the loss of the voltage signal following a blown PT fuse should result in a
bumpless transfer to manual control rather than a trip.
Large shunt reactive elements are common at transmission stations in Ontario and the switching of
these shunts must not result in equipment trips. Shunt reactors range in size up to 150 Mvar while
ive
shunt capacitor banks range in size up to 400 Mvar. The magnitude of routine switching transients is
site dependent and must be considered in the facility design.
Both low and high voltage aspects of ride through will be exercised by contingencies. Tripping is not
permitted either for the low voltage before fault clearing or for the high voltage spike after fault
clearing. Generating facilities must have sufficient high and low voltage ride through capability to
not trip needlessly. A representative ride through characteristic is sketched below.
Positive Sequence Voltage at Point of Connection
10 ms 2s 4s
ch
140%
125%
120%
110%
90%
85%
Ar
75%
50%
0%
150 ms 300 ms 2s 30 min
Tripping for contingencies that would disconnect by configuration is permitted. A need to clear faults
without intentional delay shall prevail in cases of conflict between a need to clear in-zone faults
without intentional delay and a need to ride through out-of-zone faults.
ive
configuration is permitted
Special consideration may be given in situations where generation trips result from unusually long
fault clearing by a Transmitter and no material adverse effects to the reliability are anticipated. To
Ar
LOCAL IA
Vmax
continuous operation
Positive Sequence Voltage
Ar
0
Time (not to scale) 30 min
Type tests from an accredited independent testing agency will be accepted as validation of voltage
ride through (VRT) capability until reasonable grounds arise to doubt this capability. Tripping for
out-of-zone faults or routine switching events are reasonable grounds for doubt.
Rated active power (RAP) determines the required magnitude of reactive power. RAP is determined
at “design” ambient conditions: for hydro-electric units at a “design” hydro-electric head, for gas
ive
units at a “design” ambient temperature, and for wind units at a “design” wind speed and air density.
In most cases, this design rating will be only slightly lower than maximum level of active power
participation in IESO administered markets.
Assumed conditions shall be realistic when determining RAP. It would not be acceptable to rate
hydro-electric units with a forebay to tailrace drop of 100 m on the basis of a 10 m head or to rate
wind generation on the basis of a low wind speed. Attempting to avoid reactive power obligations by
manipulating RAP or reducing nameplate capability is unacceptable to the IESO.
Thermal units, in particular, can have materially higher active power output during winter conditions
as colder temperatures result in higher air density for gas units and colder cooling water for steam
ch
units. RAP for thermal units is typically calculated under summer conditions as reactive concerns are
generally more pressing during summer months.
Generators will face restrictions if automatic action, such as those initiated by the continuous settings
of the field current limiter, prevents reactive requirements from being satisfied at any active power
output level. When manual action must be taken to reduce unit loading, only active power output
may be reduced unless IESO approves reactive power output changes.
When equipment limitations will prevent reaching the required reactive capability, planned field and
Ar
stator upgrades must restore the capability to produce the required reactive power at all levels of
active power output. Until these upgrades are completed, active power restrictions may be imposed.
Reactive Power Field limiter at rated voltage before and after field rewind
ive
Original turbine maximum offer
Active Power
There has been a tendency for generating facilities to identify forbidden zones of prolonged active
power operation following the initial approval to connect. As these forbidden zones can have
material effects on operation, proponents should disclose forbidden zones during the connection
assessment process.
Performance at a connection point will be the focus of IESO required testing to demonstrate
performance. In configurations that either inject or withdraw a material amount of reactive power by
configuration, generation facilities shall have the capability to reduce reactive power transfers to near
zero at all times. The “Market Rule” definition of connection point allows latitude to give connection
characteristics due consideration to permit sensible outcomes.
ive
The capability to inject or withdraw full reactive power at a connection point (e.g. Q=RAP/3) is
required at all active power levels and is sketched in Figure 11. It is acceptable for fixed admittance
capacitors (shown as V2B) to compensate for reactive losses within (shown as I2X in Figure 12) the
generation facilities. If fixed admittances are arranged to compensate for reactive losses (e.g.
converter, generator transformer, distribution system, main output transformer) at all levels of active
power output, then having dynamic capability to inject or withdraw Q=RAP/3 at the generation
facility’s connection point would suffice to meet this requirement.
ch
Ar
Unlike the relatively consistent P-Q characteristic for conventional units, P-Q characteristics for non-
conventional generation vary widely among vendors. The phrase “a lesser continually available
capability” provides latitude to the IESO to accept designs that provide reactive support during
windless (or dark for solar) conditions where this feature is useful. P-Q characteristics with either
more reactive capability in useful portions of the characteristic or dynamic reactive capability under
windless conditions may be given conditional approval to connect by IESO.
Three different voltage control strategies for non-conventional generation facilities comprising many
relatively small units are listed below:
1. Common Voltage: Raise/lower terminal voltage of each unit equally and allow reactive
power and power factor differ from unit to unit,
2. Common Reactive Power: Raise/lower reactive power equally from each unit equally and
allow terminal voltage and power factor differ from unit to unit,
3. Common Power Factor: Raise/lower power factor of each unit equally and allow terminal
voltage and reactive power differ from unit to unit.
Each of these methods of control can result in units reaching a limitation prior to others depending on
their placement along a feeder circuit and active power production. To utilize capability, controls
should allow units that have not reached a limit to continue to adjust output to regulate. An example
is present below for Common Reactive Power Control for a wind farm.
ive
ch
Ar
Figure 13 illustrates an example of four turbines (labeled 1, 2, 3, & 4) connected to the same feeder
with different but constant levels of active power production. As reactive demand from the facility
increases, the operating points for the four turbines moves from point A to point B to point C.
Turbine 1 hitting its reactive limit at operating point 1C should not interfere with other turbines
increasing their reactive output beyond this level.
Achieving a well-coordinated dynamic response from equipment supplied by different vendors can be
elusive and resolving problems in these circumstances has been a challenge. Designs that require
close coordination across vendors will require measurements from existing installations that
demonstrate behaviour acceptable to IESO before it grants conditional approval to connect.
For distributed generation controlled by a central system (e.g. wind/solar farm energy management
system), the impedance between the voltage reference point and the highest voltage terminal shall not
be more than 13%. If the main output transformer impedance is larger than 13%, the capability to
control to a reference within the transformer is required. Reference points further into the system
than the point of common coupling require special attention to avoid adverse effects on the
ive
generation facility.
Controlling voltage at or electrically near the low voltage collector bus has the following advantages
for both the proponent and the IESO:
a) The collector system voltage deviations will be smaller,
b) The main output transformer tap will be changed less frequently,
c) The isolation provided by the main output transformer will make the automatic voltage
Ar
The AVR on/off telemetry status point shall only be set to on when the generator is in voltage control
mode. Telemetry to the IESO shall be configured so operation in any other control modes such as
power factor control or reactive power control mode shall indicate the AVR is off.
When special configurations arise such as the one shown below, a provision should be made that the
AVR voltage source will be the same when one main output transformer is out of service and the
normally open low voltage bus tie breaker is closed.
ive
ch
Ar
Unless otherwise specified by IESO, rated active power (RAP) at 0.9 power factor lagging will be
used as a basis to calculate “rated” field voltage and current when determining positive and negative
excitation system ceilings.
Base field voltage and base field current are related by field resistance at a specified temperature
(100°C round-rotor, 75°C salient-pole) unless IESO accepts other temperatures. Time constants for
ive
conventional machines should be given at the specified temperatures. Time constants for non-
conventional machines shall be valid for ambient conditions at RAP. Base field current produces
rated terminal voltage along the open circuit air gap line at this field temperature.
Ceilings observed under the open circuit condition will be higher than the required ceiling values at
rated field current to account for greater voltage drops at rated field current. It is acceptable to
demonstrate by calculation using open circuit test results that ceiling requirements are satisfied.
Vref 5%
ch
Efd 200% Margin for increased exciter
transformer voltage drop at
rated field needed when tested 1 Vt
100%
at open circuit. This can be done 1+sTr
with a combination of measured
o/c ceiling and calculations. Vref - Ka Efd
Generator
Ar
+
- 1+sTa
PSS
It
140% Other
ive
contingency, and exceed 0.01 following all automatic actions after a contingency. Within 30 minutes,
IESO will direct operations to restore a damping ratio of 0.03 for electro-mechanical active power
oscillations.
IESO will discriminate between electro-mechanical active power oscillations that could result in
material adverse effects on the power system and mechanical active power oscillations that will not
result in material adverse effects. Active power oscillation from either the ‘3P’ effect arising from air
flow restrictions caused by wind turbine towers or scroll case/runner imbalance in hydro-electric units
are examples of sources of mechanical oscillations that cause sustained active power fluctuations that
are not electro-mechanical in nature and therefore not subject to IESO’s damping requirements.
ch
Experience has shown stabilizer designs that do not directly measure or calculate rotor speed are not
as robust for changing system conditions such as transmission outages. For this reason, only designs
that enable a ΔPω (power and rotor angle speed) configuration will be approved by IESO during the
connection assessment process. Estimating rotor angle speed with a combination of terminal voltage,
terminal current, and ‘q’ axis impedance is acceptable to IESO.
Frequency
0.2 Hz 2 Hz 10 Hz
The stabilizer activation level will normally be set at about 15% of full power to avoid needless
voltage excursions when starting, stopping, and loading units. The stabilizer deactivation level will
normally be set at about 10% of full active power. This hysteresis between activation and
deactivation levels mitigates the risk of chatter. The phrase “due consideration will be given to
inherent limitations” was intended to allow for reasonable practices. For example, hydro-electric
units with a wide mechanical power ‘rough zone’ will benefit from a turn-on level at the high end of
this ‘rough zone’. Adequate damping will be required at permissible steady operating points below
this turn-on level.
Where IESO identifies a relatively low risk of island operation, a higher level of stabilizer output (e.g.
10%) may be employed when it provides a material advantage. The requirement to have the stabilizer
output ceiling not less than ±5% was intended to mitigate adverse effects during island operation
while still enabling a good level of response during interconnected operation.
Onerous post-contingency configurations will be used by IESO as the basis for tuning stabilizer
settings. IESO will identify these onerous configurations and provide connection point characteristics
to assist stabilizer tuning.
ive
3.9 Phase Unbalance
9. Phase Unbalance Provide an open circuit phase voltage unbalance not more than 1% at a connection point and to operate
continuously with a phase unbalance as high as 2%.
Generation is required not only to be well balanced but also to be able to operate continuously in the
presence of some imbalance. Equipment that is not well balanced will not be permitted to remain
connected to the IESO-controlled grid. For example, generators must remove units from service
when the output from the excitation bridge is not well balanced.
ch
During the market entry process, the balance will be measured at the generator terminals and
excitation bridge output for conventional synchronous units. For non-conventional types of
generation, balance will be measured at the connection point to the IESO-controlled grid when a
single well-defined generator terminal is not present.
Phase unbalance may be calculated using either of the following the IEEE definitions:
𝑉𝑉𝑎𝑎𝑛𝑛𝑎𝑎 𝑠𝑠𝑛𝑛𝑠𝑠
𝑝𝑝ℎ𝑎𝑎𝑎𝑎𝑎𝑎 𝑢𝑢𝑢𝑢𝑢𝑢𝑎𝑎𝑢𝑢𝑎𝑎𝑢𝑢𝑢𝑢𝑎𝑎 = � �
𝑉𝑉𝑝𝑝𝑝𝑝𝑠𝑠 𝑠𝑠𝑛𝑛𝑠𝑠
The calculated phase unbalance must be below the threshold using at least one of these equations.
The intent of this requirement is to avoid material adverse effects on reliability or market efficiency
from undue restrictions in the capability to sustain temporary high levels of armature and field
current. The ANSI/IEEE 50.13 standard is applicable to round-rotor machines, but in lieu of better
information this requirement will also be applied to salient-pole machines. These temporary levels
from the present standard are tabulated below.
ive
10 218 209†
30 150 146
60 127 125
†May be as low as 160% to coordinate with the excitation system performance requirements
Margins for practical considerations such as measurement and metering errors and discrete time steps
for limiters shall keep kept as small as reasonably achievable.
ch
Excitation transformer protection
Limiters and protection settings shall be translated onto both a time dependent field current
characteristic (shown above) and a steady state capability curve (shown below) in the test report to
demonstrate the required coordination has been achieved. Field current limiters should not interfere
with the delivery of required reactive power at any active power output level.
ive
Active Power
UEL
Core
LOE
ch
Figure 19 - Capability Curve
The armature and field limiter requirement will be deemed to have been satisfied for non-
conventional forms of generation as long as connection point performance is at least as good as a
conforming synchronous unit.
Limiter settings may become a critical consideration when upgrading active power (e.g. hydro-
Ar
electric runner replacement) output levels and should be given due attention during the connection
assessment process.
There is often some uncertainty surrounding machine characteristics before equipment purchases are
finalized. IESO may assess proposals using conservative characteristics that meet “Market Rules”
performance requirements. When acceptable performance cannot be achieved with conservative
characteristics, the proponent will be consulted to determine whether he can commit to providing
better performance characteristics. For example, if an aero-derivative generating unit requires an
inertia value of 1.4 s for reliable performance at the highest desired level of market participation and
ive
the proponent commits to this value, then full participation may not be authorized unless performance
tests confirm this higher inertia value. In general, connection assessment conditions for approval to
connect will be based on the best performance characteristics that a proponent can commit to provide.
For combined cycle plants, the inertia requirement H > 4 is intended to apply to a facility as a whole.
As a first pass, inertia should be calculated on a facility basis as follows
∑𝑛𝑛𝑖𝑖=1 𝑆𝑆𝑏𝑏𝑏𝑏𝑏𝑏𝑒𝑒𝑖𝑖 ∗ 𝐻𝐻𝑖𝑖
𝐻𝐻𝑒𝑒𝑒𝑒 =
∑𝑛𝑛𝑖𝑖=1 𝑆𝑆𝑏𝑏𝑏𝑏𝑏𝑏𝑒𝑒𝑖𝑖
The inertia requirement for facilities will allow leeway for rounding. For example, an equivalent
inertia value for a combined cycle plant of 3.6 will be construed as meeting the requirement.
ch
When committed equipment characteristics taken as a whole provide overall performance as good as
from characteristics that marginally meet “Market Rules” requirements and will reliably allow the
desired level of market participation; the phrase “except where permitted by the IESO” provides
latitude for reasonable accommodations. Performance as good as will be interpreted by IESO as
allowing the same level or higher levels of transfers.
All equipment connected to the IESO-controlled grid shall conform to good utility practice. Unless
specifically informed otherwise, IESO will assume equipment will conform to legitimate North
Ar
American standards except when this would be inconsistent with a specific IESO performance
requirement.
- End of Section –
4.1 General
Design parameters used in assessments may not exactly match “as-built” characteristics and this
ive
difference may materially affect IESO operating and planning decisions. For example, the impedance
tolerance for two-winding transformers is ±7.5% while for autotransformers, zigzag transformers, or
transformers having three or more windings the tolerance is ±10%. It may be prudent to use
impedance at the bottom end of tolerance to establish short-circuit capabilities and to use impedance
at the top end of tolerance to establish reactive power capabilities and stability limits.
Proponents must demonstrate “as-built” equipment satisfies connection requirements and equipment
models are valid. Operating telemetry will usually provide a check of factory test results or
calculated design values. Checks may also be provided from available on-site measurements that are
more accurate than operating telemetry. Confirming “as-built” equipment in some cases may be as
simple as confirming nameplate values are provided during facility registration. In other cases,
ch
operating telemetry will be used to confirm model parameters.
Factory tests performed on factory assembled equipment (e.g. transformers) will be the primary
method to validate equipment characteristics with on-site telemetry providing a check. On-site
telemetry for field assembled equipment (e.g. cap banks, transmission circuits) will be the primary
method to validate equipment characteristics with factory tests providing a check. Material
differences between operating telemetry and IESO state estimation will prompt a review of the steady
state representation of equipment with asset owners.
Ar
4.6 Transformers
Standard powerflow parameters (e.g. impedance, turns ratio) from factory tests must be validated
with operating telemetry after installation. Tap one shall be the maximum turns ratio to conform to
the CSA standard. For phase shifting transformers installed in Ontario on tie lines to neighbouring
jurisdictions, tapping down (e.g. moving from tap 2 to tap 1) shall tend to move active power out of
the IESO-controlled grid. For voltage regulating transformers installed in Ontario on tie lines to
ive
neighbouring jurisdictions, tapping down (e.g. moving from tap 2 to tap 1) shall tend to move reactive
power out of Ontario.
A Functional Description Document (FDD) provided to the IESO must describe initiating events and
responses (see Figure 18) as well as the sequence and timing of events (see Figure 22). The FDD
must also describe any interlocks that could interfere with the operation of the SPS.
An SPS must have Northeast Power Coordinating Council (NPCC) approval prior to deployment.
Although the IESO will take responsibility for having the type of an SPS (e.g. Type 1, Type 2, or
Type 3) determined by NPCC’s Task Force on System Studies; assistance from the proponent will be
required. The design of a Type 1 or Type 2 SPS must be reviewed by NPCC’s Task Force on System
Protection. Further assistance from a proponent will be required during this review. The design
review can be a lengthy process.
To provide greater clarity, a functional example of implementing required SPS actions either to detect
configuration changes or to initiate trips in relation to a breaker-trip module is shown in Figure 22.
An orderly matrix approach to organizing input triggers and output actions has been found to have
several advantages: it tends to simplify the validation process; it lends itself to IESO operational
requirements; it avoids introducing the status of out-of-service elements into logic for input triggers;
and it also lends itself to future expansion should this need arise. An acceptable example of this
matrix approach is shown in Figure 21.
An SPS must be triggered by contingencies unless otherwise approved by the IESO. To improve
speed of response and robustness, the contingency detection logic should include triggers from
breaker trip modules as well as the breaker pallet switches. An acceptance functional example of SPS
contingency detection logic is shown below.
J-bus JL101 Position
500kV
Breaker Trip Module
Breaker open OR
JL101
A101B A101B Contingency
AND
L101T15 Position
L101T15 Breaker Trip Module
ive
Breaker open OR
Fault
L102T15
A102B
HL102
P-bus
farm energy management systems implement runback, redundant protection must reject generation
should the wind farm energy management system fail to runback generation as required. Acceptable
arrangements for generation runback are shown in Figure 24.
Functionality and timing will be required to be tested before a SPS is deployed. The time following
contingency detection to completion of the desired SPS action will be required to be measured for
each protection group. To the extent practicable, testing shall be end-to-end. IESO may approve tests
that sub-divide the chain of events when end-to-end tests have material adverse effects on reliability.
An illustration of an SPS timing sequence is shown in Figure 25.
Telecommunication considerations for protection systems require particular attention. Leased
facilities from telecommunication companies may not meet “Transmission System Code”
performance requirements for protection systems or provide acceptable path diversity to satisfy
NPCC requirements. Proponents will be expected to work closely with Transmitters to design,
install, and maintain suitable facilities.
Selections armed
XYZ Status of individual breakers,
C5E
C7E
H8LC
H6LC
via SCADA Contingency
derived from the breaker trip
module & the breaker pallet Conditions
switches via an OR gate,
e.g. PROGRAMMABLE Transceivers
C5E
C7E
PROGRAMMABLE LOGIC CONTROLLERS
H11L
Terminal Position LOGIC CONTROLLERS
H7L
Breaker Trip Module H3L
OR Contingency
ive
Breaker open Transceivers CECIL TS Conditions H1L
H8LC
H6LC
TERAULEY TS
H6LC
H8LC
H11L
H1L
H3L
H7L
ESPLANADE TS
ch
STATUS OF INDIVIDUAL BREAKERS
Transceivers
L5L10 L7L9
H6LC
H8LC
C7E
C5E
H9EJ/C7E
Contingency H9EJ/C7E
Conditions H10EJ/C5E
H10EJ/C5E
PROGRAMMABLE LOGIC
CONTROLLERS
AND
AND
AND
AND
Ar
H9EJ & H10EJ
H6LC & H8LC
H8LC
H2JK
H11L
H1L
H3L
H7L
Steam Gas Gas (via SCADA)
Transceivers Transceivers
Trip
Rejec t Hearn Unit G1
Trip
Rejec t Hearn Unit G2 Selections
Trip armed
Rejec t Hearn Unit G3
Run-Back Run-back Hearn Unit G1 via SCADA
Run-Back
Run-back Hearn Unit G2
RP
52-94A 52-94B 52-69 52-94A
Protective
Trip Signal
52-94D Relaying 52-94B 52-94B
from SPS
Operates
52-94D
All protection trip
contacts for breaker 52 Delayed 52-69T
Pick-up RXKN1 52-94C
To Tc
0.05-0.5 sec pu
1C
+ve
ive
Note 2
Delay Closure
Seal-In 52-94A 52-94B 52-94C 52-94E 52-69 52-94D
Monitor R RXMS1 RXMS1 RXMH2 RXMS1 RXME1 RXMS1
Light 4A 4A, 1B 7A 4A 1A, 1B 2B
Pick-up: 60msec
Pick-up: 4msec
Pick-up: 4msec
Pick-up: 4msec
Pick-up: 4msec
RN
ch
Contingency Detection Logic
CP (See Diagrams 3 to 13 inc.)
CN
CIRCUIT BREAKER TRIPPING MODULE
CIRCUIT BREAKER TRIPPING MODULE REQUIREMENTS [Annotated Generic Version of the Diagram]
The circuit breaker tripping module should perform the following functions:
1. Protect the high speed tripping auxiliary relay contacts from damage due to interrupting circ uit breaker trip coil currents; DIAGRAM 2
2. Prevent closing of the circuit breaker while the trip module is energised, and for a definite time after the trip signal is 8th April 2010
removed, ensure that the timing relays in the breaker failure circuits have reset before thecircuit breaker can be closed.
ive
~ ~ ~ ~ ~ ~
Clusters of wind-
Station turbine generators
Service
Station
Service
TRIP 2
If the Power transfer to the system
M is not reduced below an approved
Transfer
Power threshold within a defined time
from the receipt of the run-back
signal, tripping of the main breaker
~ ~ ~ ~ ~ ~
ive
WIND FARM
Clusters of wind- Run-back signals to the Run-back signals from the
Station MANAGEMENT 1
turbine generators individual wind-turbines Special Protection System
Service SYSTEM
TRIP 2
M
Transfer
TRIP 2
Fully redundant signals
Ar
Station 2
Service
WIND FARM
Run-back signals to the Run-back signals from the
MANAGEMENT 1
individual wind-turbines Special Protection System
SYSTEM
~ ~ ~ ~ ~ ~
Clusters of wind-
turbine generators
ive
REJECT/INITIATE RUN-BACK
OF THE PORTLANDS UNITS 25ms 4ms 4ms 4ms 4ms 0ms 4ms 4ms 4ms 33ms 106ms
PR AR TM AR Fibre: 10ms AR SPS AR Fibre: 10ms AR TM BT
ch
Esplanade TS (115kV) Hearn SS (115kV) Portlands
REJECT/INITIATE RUN-BACK
OF THE PORTLANDS UNITS 25ms 4ms 4ms 4ms 4ms 0ms 4ms 4ms 4ms 33ms 106ms
PR AR TM AR Fibre: 10ms AR SPS AR Fibre: 10ms AR TM BT
25ms
Ar
PR Primary Relaying If a breaker-failure condition were addressed by the Scheme then a further 90ms
4ms would need to be added to the contingency detection time [corresponds to a 62b timer]
AR Auxiliary Relay
4ms
TM Trip Module
12ms
SPS SPS Matrix
33ms (For a 2-cycle breaker)
DIAGRAM 5
BT Breaker Trip Time 11th April 2010
- End of Section -
ive
General
A validation report will comprise three main elements: a description of the tests and calculations in
enough detail to for the IESO to properly interpret testing results, the ratings and the models derived from
observations and measurements, and test results. Test measurements shall also be submitted in an
electronic format (e.g. CSV) acceptable to the IESO. The use of simulation models to demonstrate the
validity of other models will not satisfy IESO.
For both steady state and dynamic model parameters, model predictions shall be superimposed on
measurements to assist validation. In the descriptions below, black font indicates a setting, a rating, a
ch
calculated value, or other vendor provided information, red font indicates measurements, and blue
indicates a typical range or boundary conditions for the test. The infinity symbol is used to denote steady
states values (e.g. OEL∞, is the steady state over-excitation limiter setting). An indication is provided
where only measured results are required.
It is acceptable to verify dynamic performance for some protective functions (e.g. V/Hz, OEL, UEL) by
temporarily revising settings into a range that assists performance verification.
If tests do not show requirements are satisfied, the IESO will either modify its approval for a facility to
remain connected or revoke its approval for a facility to connect. In general, active power participation
Ar
Characteristics
Open Circuit Curve: rated Vt and Ifd, air gap line, measured Vt/Ifd, vendor Vt/Ifd
Rotating Exciters: rated Vex and Iex, measured Vex/Iex, vendor Vex, Iex
Capability Curve: RAP, MCR, rated stator current, rated field current, OEL∞, end heating limit, LOE,
UEL∞. Current shall be represented on the capability curve at rated voltage.
Field Current It curve: OEL, ANSI C50.13, excitation transformer
Zero Power Factor Leading Load Rejection: Vt, Efg, Ifg, P, Q - 0 MW, 15-25% Mvar, AVR in manual
Governor Dynamic Response: P, Gate
Turbine Gate vs Power curve: P, Gate
Governor Droop: Speed ref/P or Gate/P
ive
Governor Ambient: Hz, P, deadband (long time measurement)
Open Circuit Perturbations: Vt, freq, P, Q, Ifd, Efd - ±Δ2% AVR reference steps
Open Circuit Ceilings: Vt, freq, P, Q, Ifd, Efd - ±Δ5% AVR reference steps
Open Circuit Fuse Pull: Vt, freq, P, Q, Ifd, Efd (measured only)
PSS Phase Compensation: frequency, phase shift, calculated required phase shift
PSS Step Response: Vt, freq, Ifg, Efg, P, Q, Ks~0, Ks=final, Ks=2*final (or ζ > 0.1)
ch
V/Hz Test: Vt, V/Hz, freq (measured only) - open circuit, 97% governor setpoint, reduced V/Hz limit
OEL: Vt, freq, P, Q, Ifd, Efd (measured only)
UEL: Vt, freq, P, Q, Ifd, Efd (measured only)
Open Circuit Terminal Voltage Balance: Vab, Vbc, Vca or V0, V1, V2 (measured only)
power, negative sequence current (I22t). On a periodic basis, settings shall be submitted in accordance
with the IESO workbook to demonstrate compliance with NERC PRC-019 and IESO requirements.
ive
simultaneously at each unit as well as the active power, reactive power and voltage at the low voltage
winding of the main output transformer for two instances in time, typically near 0% and 100% of rated
active power.V, P, Q.
Voltage Control
The voltage control point shall be demonstrated to be no further than 13% (Vc13%) based on the facility
rated apparent power from a connection point. Unless otherwise specified, this connection point shall be
taken as the high voltage disconnect of the main output transformer. The position of the measured
voltage and current (Vm, Im) as well as the amount of compensation (Xcomp) shall be provided to make this
determination.
ch
𝑉𝑉𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 = 𝑉𝑉𝑚𝑚 + 𝑗𝑗𝑋𝑋𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝐼𝐼𝑚𝑚 < 13% 𝑓𝑓𝑓𝑓𝑓𝑓𝑓𝑓 𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐𝑐 𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝𝑝
ive
capability of ±15Mvar. In this case, performance would only justify an active power participation
level of 50% of the desired maximum.
b) Dynamic reactive response will be assessed by comparing the area under the reactive power- time
curve of the equivalent size synchronous machine with the measured results as shown in Figure
24. In this case, the ratio of the areas Awf1:Async1 would be used to determine the active power
participation level.
ch
Ar
2. Speed/Frequency Describe how requirements apply to this facility as a whole if Speed Reference/ droop test
Regulation applicable. Describe requirement to automatically change Ambient condition deadband test
settings for island detection when this is required for stable Speed of response test
operation (e.g. hydro-electric units). Provide island setting Power/Gate/Flow characteristic
frequency trigger. Describe inherent limitations for the Island mode frequency trigger setting reported
particular application.
ive
3. Ride Through Describe rationale for both low voltage (LVRT) and high Type tests for LVRT
voltage (HVRT) ride through. HVRT requirements should be Connection point measurements for HVRT
identified in conjunction with the associated transmitter. PT fuse failure AVR switchover
Identify tripping for routine switching events and design Settings of V/Hz, LOE, voltage restrained o/c, and
contingencies that do not disconnect by configuration is other protection that “sees” into the system
unacceptable.
Generation facility directly connected to the IESO-controlled grid shall have the
Category
capability to:
4. Active Power Describe that active power is expected over a range of system Tabulate steady state P, Q, Vt, Ifd, and rotor angle from
conditions. Identify forbidden zones. minimum to maximum active power
5. Reactive Power Identify connection point, steady-state and dynamic reactive Capability curve with RAP, MCR, LOE, UEL, OEL,
requirements based on RAP. rated field current indicated
6. Automatic Describe acceptable voltage control point, gain (droop), and Open circuit voltage perturbation <5%
ch
Voltage Regulator time delay requirements. Reactive perturbation for AVR droop
(AVR)
7. Excitation System Describe ceilings, linearity, and speed requirements. Open circuit and loaded perturbation tests
Excitation Transformer MVA, leakage reactance to
establish rectifier regulation factor
8. Power System Identify ∆Pω configuration, output limits, phase compensation, Phase compensation plot
Stabilizer (PSS) and gain requirements. Assess risk of island vis-à-vis ±5% Damping with K ~ 0, K = final, K = 2*final at full
ceiling limit. Identify and assess most onerous damping power.
situation. On/off activation levels, confirm ∆Pω configuration
9. Phase Unbalance Describe the required power quality and tolerance Open circuit voltage balance
requirements.
Ar
10. Armature and Describe acceptable limiter and protection infringements on Steady state limiter settings on capability curve
Field Limiters capability and the link between active power and reactive Field IT curve with excitation transformer, 50.13,
power limitations, protection, and OEL settings
Describe requirement for excitation system not to infringe on OEL/UEL reduced setting test
50.13 short time capability. I22t settings
11. Technical Describe equivalent synchronous machine concept and its Open circuit saturation curve
Characteristics application for the particular connection. Ensure time Partial load rejection or type test
constants match rated field temperature. Conformance with
widely recognized North American standards.
Switches and Describe required maximum voltage and current. Provide “as-built” values of maximum operating voltage and
Breakers Describe making and breaking current requirements for interrupting time. No additional on-site tests will be required.
shunts.
Describe synchronizing breaker requirements.
Describe autoreclosure requirements.
Transformers Describe required tap convention (i.e.1 is max ratio). Provide “as-built” values for powerflow parameters (e.g.
Describe LTC and fix tap range requirements. impedance, tap turns ratio),
Describe impedance used in the assessment. Confirm tap one is maximum turns ratio.
Account for parameter uncertainty. Compare operating telemetry with state estimated* V, P,Q
ive
Describe power flow convention for tie line phase shifters
and voltage regulators.
Shunt Compensation Describe ΔV < 4% requirements for switching to be done a Provide “as-built” value of maximum operating voltage and
minimum fault level. reactance.
Account for parameter uncertainty. Confirm switching phase discrepancy error for synchronous
closing unit is within tolerance.
Compare operating telemetry with state estimated Q, V when
first energized
Series Compensation Account for parameter uncertainty in the assessment. Provide “as-built” value of reactance.
Compare operating telemetry with state estimated P, Q, V at
both terminals to confirm series B.
Transmission Account for parameter uncertainty. R, X, B, and thermal Compare operating telemetry with state estimated Q, V when
Circuits ratings in the assessment. first energized to confirm shunt B.
Compare operating telemetry and state estimated P, Q, V at
ch
both terminals to confirm series R and X.
Protection Systems Described assessed sequence and timing. Provide timing from event initiation to energization of breaker
Describe requirement to provide function description. trip coils for zone test trip
Identify whether bulk or not bulk criteria apply. Confirm reach and timing is consistent with assessment
requirements.
Special Protection Identify functional requirements and timing. Provide timing for representative events.
Systems Identify required NPCC design type. Provide functional description documentation.
Identify required documentation.
Static var Identify minimum acceptable performance Provide speed of response from field tests.
Compensators Provide reactive ceilings from field tests.
HVdc and FACTS Identify minimum acceptable performance. As necessary to validate performance requirements (to be
Ar
*In this table, all comparisons with state estimation will be done by the IESO.
Powerflow QT= PRAP/3, QB= -PRAP/3, XT = 13% if generator model comprises main transformer
ive
EXST1 EXST1 EXST1
PSS2A PSS2A PSS2A
† A simple model that conservatively predicts performance should be assumed in simulations before validation is performed unless a more
complicated model is required to achieve the desired transfer level.
GENROU 6.0 0.02 0.40 0.04 4.0 0.0 2.3 2.3 0.50 1.0 0.25 0.10 0.10 0.50
ch
GENSAL 6.0 0.02 0.04 2.0 0.0 1.5 1.0 0.50 0.35 0.15 0.10 0.50
Time constants at standard field temperatures (e.g. 100°C round-rotor, 75°C salient-pole). Unsaturated reactances.
0.0 999 -999 1.0 1.0 200* 0.01 6.25† -4.3† 0.08 0.0 1.0
Ar
*Gain could be lower with PI AVR control † Assuming rated field voltage is 3 per unit
‡ Stabilizer parameters are not tuned to either the GENROU or GENSAL and EXST1 default models
The turbine and governor should be modelled when necessary to reduce market participation restrictions.
2. Speed/Frequency Regulate speed with an average droop based on maximum active power adjustable between 3% and 7% and set at 4%
Regulation unless otherwise specified by the IESO. Regulation deadband shall not be wider than ±0.06%. Speed shall be controlled
in a stable fashion in both interconnected and island operation. A sustained 10% change of rated active power after 10 s
in response to a constant rate of change of speed of 0.1%/s during interconnected operation shall be achievable. Due
consideration will be given to inherent limitations such as mill points and gate limits when evaluating active power
changes. Control systems that inhibit governor response shall not be enabled without IESO approval.
3. Ride Through Ride through routine switching events and design criteria contingencies assuming standard fault detection, auxiliary
ive
relaying, communication, and rated breaker interrupting times unless disconnected by configuration.
Category Generation facility directly connected to the IESO-controlled grid shall have the
capability to:
4. Active Power Supply continuously all levels of active power output for 5% deviations in terminal voltage. Rated active power is the
smaller output at either rated ambient conditions (e.g. temperature, head, wind speed, solar radiation) or 90% of rated
apparent power. To satisfy steady-state reactive power requirements, active power reductions to rated active power are
permitted.
5. Reactive Power Inject or withdraw reactive power continuously (i.e. dynamically) at a connection point up to 33% of its rated active
power at all levels of active power output except where a lesser continually available capability is permitted by the
IESO. A conventional synchronous unit with a power factor range of 0.90 lagging and 0.95 leading at rated active power
connected via a main output transformer impedance not greater than 13% based on generator rated apparent power is
acceptable.
6. Automatic Voltage Regulate automatically voltage at a point whose impedance (based on rated apparent power and rated voltage) is not more
ch
Regulator (AVR) than 13% from the highest voltage terminal based within ±0.5% of any set point within ±5% of rated voltage. If the AVR
target voltage is a function of reactive output, the slope ∆V /∆Qmax shall be adjustable to 0.5%. The equivalent time
constants shall not be longer than 20 ms for voltage sensing and 10 ms for the forward path to the exciter output. AVR
reference compensation shall be adjustable to within 10% of the unsaturated direct axis reactance on the unit side from a
bus common to multiple units.
7. Excitation System Provide (a) Positive and negative ceilings not less than 200% and 140% of rated field voltage at rated terminal voltage
and rated field current; (b) A positive ceiling not less than 170% of rated field voltage at rated terminal voltage and 160%
of rated field current; (c) A voltage response time to either ceiling not more than 50 ms for a 5% step change from rated
voltage under open-circuit conditions; and (d) A linear response between ceilings. Rated field current is defined at rated
voltage, rated active power, and required maximum continuous reactive power.
8. Power System Provide (a) A change of power and speed input configuration; (b) Positive and negative output limits not less than ±5% of
Stabilizer (PSS) rated AVR voltage; (c) Phase compensation adjustable to limit angle error to within 30° between 0.2 and 2.0 Hz under
Ar
conditions specified by the IESO, and (d) Gain adjustable up to an amount that either increases damping ratio above 0.1
or elicits poorly damped exciter modes of oscillation at maximum active output unless otherwise specified by the IESO.
Due consideration will be given to inherent limitations.
9. Phase Unbalance Provide an open circuit phase voltage unbalance not more than 1% at a connection point and to operate continuously with
a phase unbalance as high as 2%.
10. Armature and Provide short-time capabilities specified in IEEE/ANSI 50.13 and continuous capability determined by either field
Field Limiters current, armature current, or core-end heating. More restrictive limiting functions, such as steady state stability limiters,
shall not be enabled without IESO approval.
11. Technical Exhibit connection point performance comparable to an equivalent synchronous generation unit with characteristic
Characteristics parameters within typical ranges. Inertia, unsaturated transient impedance, transient time constants, and saturation
coefficients shall be within typical ranges (e.g. H > 1.2 Aero-derivative, H > 1.2 Hydraulic less than 20 MVA, H > 2.0
Hydraulic 20 MVA or larger, H > 4.0 Other synchronized units, X’d < 0.5, T’d0 > 2.0, and S1.2 < 0.5) except where
permitted by the IESO.
GENTRA Transient Level Generator May be used in special circumstances when sub-
transient time constants are not very large compared
ive
with dynamic simulation time step.
GENSAL Salient Pole Generator (Quadratic
Saturation on d-Axis)
GENSAE Salient Pole Generator (Exponential
Saturation on Both Axes)
GENROU Round Rotor Generator (Quadratic
Saturation)
GENROE Round Rotor Generator (Exponential
Saturation)
GENTPJ Salient Pole and Round Rotor Saturation can be made dependent on stator current to
(Exponential Saturation) enhance model accuracy over a wide range of operation
ch
Compensator Models
ive
ESST1A 1992 IEEE type ST1A excitation system
ESST4B IEEE type ST4B potential or compounded source exciter
EX2000 EX2000 Excitation System Retrofits only
EXST1 1981 IEEE type ST1 excitation system
IEEET2 1968 IEEE type 2 excitation system Retrofits only
IEEET4 1968 IEEE type 4 excitation system Retrofits only
IEEEX1 1979 IEEE type 1 excitation system and 1981 IEEE type DC1 Retrofits only
IEEEX2 1979 IEEE type 2 excitation system Retrofits only
ST5B IEEE 421.5 2005 ST5B excitation system
ch
ST6B IEEE 421.5 2005 ST6B excitation system
URST5T IEEE proposed type ST5B excitation system
In general, only static excitation systems will satisfy IESO performance requirements for new
installations.
Turbine/Governor Models
ive
WTARAU1 Generic Aerodynamic for Type 3 Wind Machine
WTPTA1 (WTGPT_A) Generic Pitch Control for Type 3 Wind Machines
WTTQAU1 Generic Torque controller for Type 3 Wind
Machines
REPCTA1 (REPC_A) Generic Renewable Plant Control Model – Type
3
REPCA1 (REPC_A) Generic Renewable Plant Control Model – Type
4
REAX3BU1 Renewable Energy Auxiliary Control for type 3 To be used with PLNTBU1
wind turbines
REAX4BU1 Renewable Energy Auxiliary Control for type 4 To be used with PLNTBU1
ch
wind turbines and PV inverters
Please consult with IESO staff to confirm when torque, pitch, aero, or drive train models are required.
Plant Models
STATCOM Models
SVC Models
ive
SVSMO1U2 WECC Generic Continuous Control SVC
SVSMO2U2 WECC Generic Discrete Control SVC
SVCAXBU1 SVC device Auxiliary Control To be used with PLNTBU1
ive
RPM Revolutions per Minute
Sex Excitation Transformer Rated Apparent Power
Sbase Rated Apparent Power Base
V Voltage
Vex Exciter Voltage
Vpri Primary Voltage
ch
Vsec Secondary Voltage
Vt Terminal Voltage
– End of Document –