0% found this document useful (0 votes)
8 views1 page

-Checklist-for-compaction

Uploaded by

hsemuhammdctce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views1 page

-Checklist-for-compaction

Uploaded by

hsemuhammdctce
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

Doc. No.

: YB-CH-HSE-CTCE-0012
Compaction
Ensure clear and safe access routes forWORK ‐ CHECKLIST
workers and equipment.
9 0
Rev No.:

Rev Date:
Perform pre-operational checks on compaction equipment (rollers,
10 Page No. ‐1‐ 1
vibrators) to ensure they’re in safe working order.
Name of Project Location Inspected by: Muhammad
Check for hydraulic oil or fuel leaks on equipment.
11 YAS ISLAND Designation: HSE ENG
RESIDENTIAL BUILDING AT PLOT C 33
Sign:
Check that vibration exposure limits are monitored and within safe levels
12
to prevent worker fatigue or injury.

Date:
Define and mark exclusion zones for equipment operations to keep
13
workers at a safe distance.
Name of Contractor: ‐ CTCE
Ensure materials like soil or aggregates are kept at safe heights and
14
distances from equipment. SAFETY CHECKS YES NO

1 Check & Ensure


steel fixingtoolbox talk valid
team have conducted via supervisor before each
work permit?
15
start work.

Check the all worker’s wearing proper PPE’S?


2 Monitor
16 includingand control
safety noisereflective
helmets, levels tovests,
reduce hearing
gloves, ear damage risk
protection, forsafety
and
workers.
boots.

Ensure operators of compaction equipment are trained, certified, and


3 Schedule regular breaks for operators, especially in hot or cold
17 competent.
weather.

Ensure
Perform emergency procedures of
a final inspection andthe
contact numbers area
compaction are displayed on-site
to ensure no and that
4
18 first aid kits and trained first aiders are available.
hazards remain.

Conduct an underground utility survey to avoid contact with any hidden pipes,
5 cables, or other utilities.

Ensure Set up barricades or warning signs around the work area to prevent
6
unauthorized access.

et up dust control measures, such as water spray, if required.


7

Check proper access provided ?


8

You might also like