TOPIC 4 SANITARY DRAINAGE SYSTEM
TOPIC 4 SANITARY DRAINAGE SYSTEM
PLUMBING FIXTURES
Subsystems of the
Sanitary System:
Waste Collection System
Ventilation System
Essential Parts of the
Sanitary Drainage System
Waste Pipe
conveys only wastewater or liquid waste free of fecal matter.
Vent Pipe
used for ensuring the circulation of air in a plumbing system and
for relieving the negative pressure exerted on trap seals.
Trap
a fitting or device designed and constructed to provide, when
properly vented, a liquid seal which prevents the backflow of
foul air or methane gas without materially affecting the flow of
sewage or wastewater through it.
Stack
the vertical main of a system of soil, waste or vent pipings
extending through one or more stories and extended thru the
roof.
Branch
any part of the piping system other than a main, riser or stack.
Essential Parts of the
Sanitary Drainage System
House/Building Drain
House/Building Sewer
extends from the house drain at a point 0.60 meters from the
outside face of the foundation wall of a building to the junction
with the street sewer or to any point of discharge, and
conveying the drainage of one building site.
NPC 203.3
Principles of Waste & Soil
(EXCRETA) Pipes Roughing-in
The S-Trap
Predecessor of P-traps
Used before traps
had to connect to a
ventilation line
Traps & Interceptors
REQUIREMENTS:
Traps REQUIRED
Each plumbing fixture, except those with integral traps, shall
be separately trapped with an approved-type waterseal trap.
Each fixture trap shall have a trap seal of water of not less
than 51 mm and not more than 102 mm (except where a
deeper seal is found necessary by the Administrative
Authority for special conditions.
Traps & Interceptors
5 Sink (residential) 38 mm 2
6 Urinal, wall mounted, integral trap 51 mm 3
REQUIREMENTS:
Clean-outs REQUIRED
at the upper terminal of every horizontal sewer or waste line
at each run of piping more than 15 meters (50 feet) in total
developed length
at every 15 m (50 ft) of total developed length or a fraction
thereof
additional clean-out shall be provided on a horizontal line
with an aggregate offset angle exceeding 135°
inside the building near the connection between the building
drain and the building sewer or installed outside the building
at the lower end of the building drain and extended to grade.
Clean-outs
VENTILATION
Main Vent
the principal artery of the venting
system to which vent branches are
connected.
a.k.a. ‘Collecting Vent Line’
serves as support to the Main Soil &
Waste Vent
Vents & Venting System
an arrangement of venting so
installed that one vent pipe
serve two (2) traps.
Vents & Venting System
Relief Vent
Wet Vent
that portion of a vent pipe through which wastewater also
flows through.
Vents & Venting System
Local Vent
Dry Vent
Vent Stack
SIZE OF VENTS:
The sizes of vent piping shall be determined from its length
and the total number of fixture units connected thereto.
The diameter of an individual vent shall not be less than 32
mm (1-1/4”) nor less in size than one-half (1/2) the diameter
of the drain to which it is connected.
Installation of Vents
VENT TERMINATION
VSTR shall terminate vertically not less than 150 mm above
the roof nor less than 300 mm from any vertical surface
nearby.
Each vent opening shall terminate:
Not less than 3.00 m from any openable window;
Not less than 0.90 m above any openable window;
Not less than 0.90 m away from any lot line, alley and street
boundary lines.
Vertical vent pipes shall extend 3.00 m distant from any part
of the roof that is used for human activities and shall extend
not less than 2.10 m above such roof.
Installation of Vents
Retardation of flow
- Due to the effect of atmospheric pressure and/or gravity
GREASE TRAPS:
Used for fixtures where grease may be introduced into the
drainage or sewer system in quantities that can effect line
stoppage or hinder sewage treatment or private sewage
disposal.
2 Main Types
HOUSE TRAPS:
Placed in the house drain immediately inside the foundation wall
of the building
DRAIN TILES:
Used to prevent groundwater from seeping through the
basement walls & foundation
Hollow tiles are placed around the perimeter of the foundation
where water is collected; drain tiles are connected to the house
drain or sump pit
House Drain Appliances
Garage Traps:
a.k.a. garage catch basin
Operating Principles: trap is filled with water & located at the
lowest point of the garage so it can collect all wastes.
House Drain Appliances
Sewage Ejectors:
Pumps the wastes up form the sump pit to the sewers (which
are usually higher than basement levels)
Private Sewage
Disposal Systems
DISPOSAL PHASE- the final stage of the plumbing process;
where used water and water-carried wastes are brought to
various disposal outlets
Minimum
dimensions-
L= 1500mm
W=900mm
D=1200mm
Private Sewage
Disposal Systems
SINGLE CHAMBER SEPTIC TANK:
Private Sewage
Disposal Systems
DESIGN CRITERIA:
PLANS:
should show all dimensions, reinforcing, structural
calculations, and such other pertinent data as needed.
QUALITY OF DESIGN:
shall be such as to produce a clarified effluent of acceptable
standards and shall provide adequate space for sludge and
scum accumulations.
MATERIALS:
constructed of durable materials, not subject to excessive
corrosion or decay, shall be watertight.
Material: cement (most common) or pre-fabricated cast iron
Private Sewage
Disposal Systems
COMPARTMENTS:
have a minimum of 2 compartments:
First compartment: not less than 2/3 capacity of the total
capacity of tank; not less than 2 cum liquid capacity;
shall be at least 0.9 m width and 1.5 m long; Liquid
depth not less than 0.6 m nor more than 1.8 m.
Secondary compartment: maximum capacity of 1/3 total
capacity of tank; minimum of 1 cum liquid capacity
In septic tanks having over 6 cum capacity, the secondary
compartment should be not less than 1.5 m in length.
maintain a slope of 1:10 at the bottom of the digestion
chamber to collect the sludge and make it easily accessible
from the manhole
MANHOLES:
with at least two (2) manholes, 508 mm in min dimension;
one over inlet, other over outlet. Wherever first compartment
exceeds 3.7 m in length, an additional manhole required
over the baffle wall.
Private Sewage
Disposal Systems
VENT DIAMETER:
equal to the cross sectional area of the house sewer.
Private Sewage
Disposal Systems
AIR SPACE:
Side walls shall extend 228.6 mm above liquid depth.
Cover of septic tank shall be at least 50.8 mm above the
back vent openings.
STRUCTURE:
CAPACITY:
The capacity of septic tanks is determined by the number of
bedrooms or apartment units in dwelling occupancies; by
the estimated waste/sewage design flow rate for various
building occupancies; or by the number of fixture units of all
plumbing fixtures; whichever is greater.
The capacity of any one septic tank and its drainage system
shall also be limited by the soil structure classification in its
drainage field.
LOCATION:
Should not be located underneath the house
At least 15 meters from the water distribution system
SEWERS
3 degrees or grades of
waste water:
Black Water
Water plus solid and liquid human wastes
Storm Water
Rainwater only
SEWERS
CLASSIFICATION OF SEWERS:
Combination Public Sewers
Oldest variety
Carries both storm & sanitary wastes
Storm Sewers
Sanitary Sewers
Carries regular sanitary wastes only
Terminates in a modern sewage disposal plant for
treatment
Built at a depth of 3 meters (tributaries)
SEWERS
DISPOSAL FIELDS
Private sewage disposal system common in rural areas for
structures with large adjacent open fields
Private Sewage
Disposal Systems
AREA:
dependent on the required septic tank capacity or estimated
sewage flow rate, whichever is greater, and;
the type of soil found in the excavation.
SEEPAGE PITS
CAPACITY:
based on the quantity of liquid waste and on the character
and porosity of the surrounding soil.
STRENGTH:
Brick lining shall have a minimum
compressive strength of 17225 kPa.
CESSPOOLS
a non-watertight lined
excavation in the ground
which receives the discharge
of a sanitary drainage system,
designed to retain the organic
matter but permitting the liquid
to seep through the pit bottom
and sides
Private Sewage
Disposal Systems
TEMPORARY PERMITS:
Temporary expedient pending the construction of a public
sewer, so long as it is established that a public sewer will be
available in less than 2 years and the soil and ground water
conditions are favorable;
As an overflow facility when installed in conjunction with an
existing cesspool;
As a means of sewage disposal for limited, minor, or
temporary uses.
Private Sewage
Disposal Systems
PRIVIES
REQUIREMENTS:
When liquid wastes containing excessive amounts of
grease, garbage, flammable wastes, sand, or other
ingredients which may affect the operation of a private
sewage disposal system, an interceptor for such waste shall
be installed.
DISPOSAL:
Waste from interceptors may be discharged to a septic tank
or other primary system or into a separate disposal system.
Private Sewage
Disposal Systems
GENERAL GUIDELINES FOR PRIVATE SEWAGE DISPOSAL
SYSTEMS
Location of Sewage Disposal System
MIN. HORIZONTAL DISPOSAL SEEPAGE
BLDG SEPTIC
DISTANCE IN CLEAR FIELD PIT OR
SEWER TANK
REQUIRED FROM CESSPOOL
1 Buildings or 0.6 m 1.5 m 2.4 m 2.4 m
structures*
2 Property line Clear** 1.5 m 1.5 m 2.4 m
Adjoining private
Property
3 Water supply 15.2 m 15.2 m 30.5 m 45.7 m
wells
4 Streams 15.2 m 15.2 m 15.2 m 30.5 m
5 Trees - 3m - 3m
Private Sewage
Disposal Systems
GENERAL GUIDELINES FOR PRIVATE SEWAGE DISPOSAL
SYSTEMS
Location of Sewage Disposal System
MIN. HORIZONTAL DISPOSAL SEEPAGE
BLDG SEPTIC
DISTANCE IN CLEAR FIELD PIT OR
SEWER TANK
REQUIRED FROM CESSPOOL
6 Seepage pits or - 1.5 m 1.5 m 3.7 m
Cesspools
7 Disposal field 1.5 m 1.2 m 1.5 m
8 On site domestic 0.3 m 1.5 m 1.5 m 1.5 m
Water service line
9 Pressure public 3m 3m 3m 3m
Water main
Sewage Treatment Plan (STP)
Some features of STP:
An aeration system within the tank;
A submersible mixer to mix the waste;
A sludge waste pump that aids in clarifying;
A decanter;
Blowers;
A fully electronic control system, etc.
Water Recycling
4. incinerator
3. Fine screen house
6. Aerating
8. Power House 7. Clarifier outlet
basin
10. Liquid
11. Chemical
9. Drier house extractor
house
house
13. Vacuum
12. warehouse power
house
Water Recycling
The Downspout
Located every 8 to 10 meters
& at every corner of the roof
(but, to avoid clogging of pipes,
it is best to locate them every
4 to 6 m)
Storm Water System
The Shoe
At the bottom of the roof leader to direct rain-
water towards the nearest catch basin
Storm Water System
Storm Sewers