Republic of the Philippines
DEPARTMENTOF PUBliC WORKSAND HIGHWAYS
OFFICE OF THE SECRETARY
Manila
2 7 FEB 2018
DEPARTMENT ORDER ) SUBJECT: Revised Contract ID Coding Scheme
for All Infrastructure Project
NO. 33 ~
)
Contracts of the Department
Series of 201~h>f'.(f
In line with the on-going effort to establish consistent information across all information
systems implemented in the Department and to ensure flexibility in order to meet workload
demands, the Contract Identification numbering scheme is hereby amended as follows:
VYRD9999,where:
VY refers to the first year of funding in the GM, NOTthe year of bidding
R refers to Central Office or the Region for the Implementing Office (10),
irrespective of the Procuring Entity
D refers to the DEO who will be the 10, irrespective of the Procuring Entity.
The value zero (0) if the 10 is Central Office or RegionalOffice
9999 - A running number starting from 0001 for every Procuring Entity every
funding year, with the exception being if the Procuring Entity is different
from the 10. If the Procuring Entity and the 10 are different, the 10
should provide the Contract ID to avoid potential duplication. This
is essential for Project and Contract Management Application
(PCMA) to access the contract for the 10.
The code assigned to Central Office, Region and District Engineering Offices is provided as
an attachment to this Department Order. Procurement Service (PrS) is responsible for
issuing and updating of these codes.
The Bids and Awards Committee (BAC) of each Implementing Office shall be responsible for
assigning the Contract ID to preclude duplication within its area of jurisdiction. If the 10 is
the Central Office, the Procurement Service (PrS) shall be responsible for assigning the
Contract ID.
This Order supersedes D.O. No. 172 Series of 2016 and shall take effect for projects to be
implemented from 2018 onwar~s.
~~---
MARK A. VILLAR
Department of Public Works and Highways
Secretary Office of the Secretary
11111111111111111111111111111111"" 1111
WIN8XR01296
12.1.1 EED/MNqMVSG
D.O. No. 83 S. 2018
Revised Contract ID Coding Scheme for All Infrastructure Project Contracts of the Department
Page: 1 of 4
Annex A
TABLE 1- Central Office and Region Codes (Geographic)
Example 1: For a contract with Funding under 2018 GAA to be implemented by the Central
Office
Example 2: For a contract with Funding under 2018 GAA to be implemented by the
Regional Office I
Example 3: For a contract with Funding under 2018 GAA to be implemented by the
Batangas 1st DEO
Example 5: For a contract with Funding under 2018 GAA to be implemented by Capiz
2nd DEO and to be bid in Regional Office VI