RFI-Summary For 10.02.2024.

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
20 views2 pages

RFI-Summary For 10.02.2024.

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Project:- Construction of 3rd line between Maramjhiri (Km. 841.9) and Chichonda (Km. 911.

7) on Itarsi -
Nagpur section of Central Railway
Client:- Central Railway
PMC:- Technogem Consultants Pvt. Ltd.
EPC Contractor:- KEC International Limited
Raising Date :-09-02-2024
SUMMARY OF RFI
Earthwork
Chainage Inspection Inspection
Sr. No. RFI NO. Description Length (M) Layer RFI Date RFI Time Requested by (Mob.) Remarks
From To Date Time
Satyabir
1 CR/CCD-MJY/EW/2024/2462 Embankment FDD Testing 846+760 847+100 340 1st 9-Feb-24 6:16 PM 10-Feb-24 11:00 AM
(6350 589 489)
Santosh Kumar
2 CR/CCD-MJY/EW/2024/2463 Subgrade FDD Testing 869+540 869+840 300 3rd 9-Feb-24 6:24 PM 10-Feb-24 10:00 AM
(6396000566)
Santosh Kumar
3 CR/CCD-MJY/EW/2024/2464 Subgrade FDD Testing 870+420 870+560 140 1st 9-Feb-24 6:47 PM 10-Feb-24 11:00 AM
(6396000566)
Anil Kumar
4 CR/CCD-MJY/EW/2024/2465 Subgrade FDD Testing 881+880 882+040 160 2nd 9-Feb-24 6:47 PM 10-Feb-24 10:00 AM
(7079317202)
Anil Kumar
5 CR/CCD-MJY/EW/2024/2466 Embankment FDD Testing 886+220 886+540 320 2nd 9-Feb-24 6:47 PM 10-Feb-24 11:00 AM
(7079317202)
Bridge Work
Chainage Inspection Inspection
Sr. No. RFI NO. Description Br. No. Section RFI Date RFI Time Requested by (Mob.) Remarks
From To Date Time
Checking of reinforcement & allow
Lalit Yadav
1 CR/CCD-MJY/BRW/2024/2467 Shuttering work for retaining wall final lift 891+000 892+000 891/2 JKR-MTY 9-Feb-24 6:40 PM 10-Feb-24 12:30PM
(9719133527)
with ballast retainer
Checking of Shuttering & allow concrete
Lalit Yadav
2 CR/CCD-MJY/BRW/2024/2468 work for retaining wall final lift with ballast 891+000 892+000 891/2 JKR-MTY 9-Feb-24 6:40 PM 10-Feb-24 1:30 PM
(9719133527)
retainer

Checking of layout & allow excavation for Lalit Yadav


3 CR/CCD-MJY/BRW/2024/2469 895+000 896+000 895/1 JKR-MTY 9-Feb-24 6:40 PM 10-Feb-24 10:00 AM
Bottom slab (9719133527)

Checking of excavation level & allow PCC Lalit Yadav


4 CR/CCD-MJY/BRW/2024/2470 895+000 896+000 895/1 JKR-MTY 9-Feb-24 6:40 PM 10-Feb-24 11:00 AM
for Bottom slab (9719133527)
Checking of layout & allow excavation for Lalit Yadav
5 CR/CCD-MJY/BRW/2024/2471 894+000 895+000 894/1 HTN-CCD 9-Feb-24 6:40 PM 10-Feb-24 12:00 PM
Bottom slab (9719133527)
Checking of reinforcement & allow Lalit Yadav
6 CR/CCD-MJY/BRW/2024/2472 897+000 898+000 897/1 HTN-CCD 9-Feb-24 6:40 PM 10-Feb-24 2:30 AM
Shuttering work for Bottom slab (9719133527)
Checking OGL level , lay out & allow Dinesh Gupta
7 CR/CCD-MJY/BRW/2024/2473 903+000 904+000 903/1 MTY-HTN 9-Feb-24 6:40 PM 10-Feb-24 3:00 PM
Retaining wall excavation work . (9860827578)
Checking OGL level, layout & allow Dinesh Gupta
8 CR/CCD-MJY/BRW/2024/2474 903+000 904+000 903/2 MTY-HTN 9-Feb-24 6:40 PM 10-Feb-24 4:00 PM
Retaining wall excavation work . (9860827578)

KEC Representative PMC Representative Client Representative


Project:- Construction of 3rd line between Maramjhiri (Km. 841.9) and Chichonda (Km. 911.7) on Itarsi -
Nagpur section of Central Railway
Client:- Central Railway
PMC:- Technogem Consultants Pvt. Ltd.
EPC Contractor:- KEC International Limited
Raising Date :-09-02-2024
SUMMARY OF RFI
Checking Shuttering & allow concrete Dinesh Gupta
9 CR/CCD-MJY/BRW/2024/2475 900+000 901+000 900/2 MTY-HTN 9-Feb-24 6:40 PM 10-Feb-24 11:00 AM
work wall 2nd lift (9860827578)
Checking Steel & allow shuttering work Dinesh Gupta
10 CR/CCD-MJY/BRW/2024/2476 901+000 902+000 901/1 MTY-HTN 9-Feb-24 6:40 PM 10-Feb-24 3:00 PM
for Retaining wall 1st lift . (Both sides). (9860827578)
Reinforcement & Shuttering Checking for Altaf Ahmed
11 CR/CCD-MJY/BRW/2024/2477 857+000 858+000 857/1 BZU-MALK 9-Feb-24 6:07 PM 10-Feb-24 11:30 AM
1st lift wall and Allow for concreting. (9123290772)

Reinforcement and shuttering checking for Altaf Ahmed


12 CR/CCD-MJY/BRW/2024/2478 858+000 858+100 858/1 BZU-MALK 9-Feb-24 6:07 PM 10-Feb-24 9:30 AM
bottom haunch and allow for concreting. (9123290772)

OHE & GE Work


OHE Mast no. Inspection Inspection
Sr. No. RFI NO. Description Location RFI Date RFI Time Requested by (Mob.) Remarks
from To Date Time

Satendra Kumar
1 CR/CCD-MJY/OHE/2024/2479 IBH DN AT Cable shifting Work 870/0 870/38 AMF- BYS. IBH 9-Feb-24 6:02 PM 10-Feb-24 10:00 AM
(94124 44911)

PSI Work
Inspection Inspection
Sr. No. RFI NO. Description Structure Location RFI Date RFI Time Requested by (Mob.) Remarks
Date Time
Fencing foundation excavated pit soil Sahdeo Kumar
1 CR/CCD-MJY/PSI/2024/2480 SSP HTN 9-Feb-24 5:50 PM 10-Feb-24 9:00 AM
dressing ,size & depth checking work (9140112087)

KEC Representative PMC Representative Client Representative