0% found this document useful (0 votes)
6 views13 pages

BT 106

bt 106 btech exam paper

Uploaded by

rajaldi323
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views13 pages

BT 106

bt 106 btech exam paper

Uploaded by

rajaldi323
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

MeTAL CASTZN

roduhon
>Sord cantna in
pater shap tho aleoir cd
pont moke
incopoNehg ytingtwityytem 4l\ ing end

# resuton Covity mo Hen motrd


3
metd to cool it unt)
W

S
alloon.hreen
mould

pour
Campore
d e movin ho cogt
ealc lxte
oill be pe fermed
ho tioll volve thad
1

fourd the olloing cuce


Frt oo Cuilh
sotchng mold and
peit , nould ill be
Ieprcted
akulotrd
value

Kleasurc all te cime nolons


Constehon

Rub the boh


botbm boord

boord
Pack
end

# OVer

Sid
Cet ppropnate prue,ventsyiexs
ete 1

2:Eimoted Proce valves

dCaleulte
flow velo ety
Volumehe piew hot.
Alold
’Part shyin ac
Dato orovided
Solidifiaton Shrinoge
’Solid Thermal Contac too S-6 °o
ineGr |3
ford ohri caton

elt oluminlum in

Poyr ominum
-Preheat lodl
Immediotely por me Hed
e luminium into loodle
ond cathing
Pobr rem enina alurni ní v in th
Lodle back in trh oeo
4 Port
Port lspecion

Alg w co,ting to cool 'ut ide


hreak o tt Aord.

cleon ocntino uith wirr hwsh


imenn0.
Compore to emae volvea
to potern ineoioso
Caotochoo.
DLAS TIC
-ENT

Indraduchooi
Tngechienmolalig id a
malaingdold plaohe oleots Tt
*
oreing plotes into
mo tHen plohca
aloed mold where th plastdoli
3
into a freoduet upon
Cooling Each lob
inyeotoo aolding equipment
qgcelw driyon
S aheoher per the fodre ipted
belo

To obperr the ige tion nolcingpocea


Cnd the yield cnoded ponta
panta orios ccooditono
toisThe poroceA.
hequiye_Bevere asdyustmenta to etaHah

being inader e

pot In o, epeota ble praceaA.


Lob Procedure :
Two diKLorent moteri la oill benede
Polysdren od the
poly pro pylen
motch thot tau're
mizing he pat being monoctret
Aduotaento be mad< to tt te np
erotuye Crdpre Are aed ln e pro
#
3
elahon ogtment only
OneVo rid5leotaim
ehange
W
Pheor I

Piug Mola machins

Turn he
medim
to up at leaot
4. tuith suist abl gronuortc
ploatemoténial
saht
Clamp molda tog
ingcchon hoEHe
actuahing n oad hotd.
Lelec- clompont YCmo paat trom
ench quaity
oh
pantercturcd mon th eoch Idped
PhaseV
neonsLGodpant
prts
3
the
Lhasc P
chong orly
Pemem
her
tho
result
Pho
SHEET ETALFoR9 ANGexpeeTnENT
\nteoduch on

sheel metl ansisto cutting


hin sheet
motesral ahen a s hopeof punched is
Rrom apoce
blon kia Bon ding he ata mestal is
3 feming opexahnand con
be pexlmed
to
W
desired aeoalta This
beve ry
S
omctenial, het thepeedi lohic
Con be fobn'cated.

obtetve
denigned to
cnderstonding e pheet metal

adina Qt udey Atoning


paot fxmedAheed metal
coduetke
d ot lrom the Hat blon k aleoion
ut od femed1otD the esired prroduot
rroce dere

1-Read ond tsndetent


pint prorided
Derele-pant plan monfaty
d) Thià Must be ignet o
poraicled beer.
13
3
beaigi) develop plat blonk
the poduct
Aat blonk he
mateALO
S.Sput the orld folded goincta
S
s Conclude your finding onperiens ncee

Equipment
22"X .6sheet o l88 gagelow cor bÍn
cald olledte e
Hond hear.
9o° Notch Pre s.

Nietol
6. Spot deld o
TurNINa OPTI MT SATION
EX PepTpeNT

In Acoduchon :

Rx crehng a vaniety o componen


poata Ther
|emova
Clvailaleeoch
3 zpeofe tumetin a moteaial
Yequire menst oY The mcchinin
opaHe meintaina he
od osetoleronceo
S
iniahes oony monuctuing
the

incosuming ond moAwste


maten iolayt pevfern he mochining
in theleot moupt o im
Jectve

Thio.b_i designed to epoA ttre


tude sto o mochining operc' o tò nbena
maching im Ondatce iniah
obtoinedue VOrie

|be
till bo chorted to core lete tte best
pesaisenrio to oschie the deoirel

Proceure

4 Meaure tte tcntng the


motenial being
being, 'proc
proceA ol.
.

obbe ond tme the machinTa


lorthe f the moteaia undci vaaety
fe edo.
W
y.Calealate
the
the
aletiaiah
tollowing
machining condton,
Compil oll meoyred ta
Angl
Data
ragtenalAlumiDUm Rotatiod
Spe ed
D lenat
O o 22.

in Jev ) ooo
(3) 0 o 4 in rev inrer
inTey lo) o o02
S) in ev
inrey
in lrer
Equipment

2ce hand Shouldering Tool.


)ALuiniun Bor Ato c
Cutiag
Safety
s)Saety Sla pcs
Dial clippers
Sacc plo te.
Soace Teoting
W
WELpING AND JoNNG
TerhnoLoby
Inrodution
n marteatol Teining procrA
|hielding
tohere 2. moG Pasts
Contcrt
edred togethr
Fsion welding ke
proceA twhere
(esedto mel+ ma tengl
achieve th cocleA nce. laleldina oo
duces Per moneot Jo'nt, Fllex mo tentala
W

may
wilited dorino, the
twhich ad in the moteal
bcn

-The lo b is denigned to
the
poac
(weldino proce2. ord to pex fere n th
LAimpl tel ding. Thin
UAing reot
Condmatle eleodod to chieve the
dosired
aleling Proce deUre

n bo+h Ond oyCotylene


ne ad to be
tuelding enough gent
Ho be ale to tnelt bene. natonilo
adallow hem to low together tho
achiee ong goint.
Arc Welaing
Shield ed Lielding (SMAW)
ele oto ole

2
hiah both eittey con
Tequired
be
Safe ty is criticol ord afety
lases uelalin g4 ouee Q d a Lwelding
helmet, Alao the pte ce wil)
become exheemely hot dening the
need to be hndled
pliers
Cashon

Dontploce the eleotOde


wcldin3 he hoh
benltAit do, wshile peforming
pefoming arch
aclding.

You might also like