Open navigation menu
Close suggestions
Search
Search
en
Change Language
Upload
Sign in
Sign in
Download free for days
0 ratings
0% found this document useful (0 votes)
109 views
Estimation of RCC structure
Estimation
Uploaded by
Rajeshwari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Estimation of RCC structure For Later
Download
Save
Save Estimation of RCC structure For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
0 ratings
0% found this document useful (0 votes)
109 views
Estimation of RCC structure
Estimation
Uploaded by
Rajeshwari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content,
claim it here
.
Available Formats
Download as PDF or read online on Scribd
Download now
Download
Save Estimation of RCC structure For Later
Carousel Previous
Carousel Next
Save
Save Estimation of RCC structure For Later
0%
0% found this document useful, undefined
0%
, undefined
Embed
Share
Print
Report
Download now
Download
You are on page 1
/ 5
Search
Fullscreen
230 ESTIMATING AND COSTING ESTIMATE OF R.C.C. ROOF SLAB Example 2 — Prepare a detailed estimate of a R.C.C. Roof Slab of 3 metres clear span and 6 metres long from the given drawings (Fig. 5-4). R.C.C. work including centering and shuttering and steel reintorcement in detail shall be taken separately. Also prepare a schedule of bars, R.C.C, ROOF SLAB toon ‘am ClearSpan Alt. Bars Bont uo em ‘Tamm DiaMain Bars 120m clo Ksém], 506m Distr. bars 6mm Dia 1gemc/e* __50CM ‘am Clear Span. (CROSS SECTION PART PLAN SHOWING ARRANGEMENT OF REINFOREMENT BARS Fig. 5-4 Note~In pi ‘Plan bent up and top bars have been shown in dotted lines, IRCC ROOF stag Ww Details of Measurement and Cotestation of Quantities (Bx, 2) item| Particulars of fa Height No. ti as IN 7 acl Ne lefwona "|§* tenet Basal SS Qc] iim la | { 1 | R.C.C.work 1 22:3 | 1 excluding steel and its bending bt } S including centering | | and shuttering and binding steel 1} 630] 330 | a2 | 2495 [xo deduction for steel Tas eum | bars, 2 | Steel bars including bending (mild steel in R.C.C work— Main bars 12 mm dia, @ 0.89 kej/m— = Straight bars Side cover 4 cm \ 24 em cet L=3.30 — 2 side covers (No =2 8 1 fan | 3.44 2 hooks Be 2 =27) 13.30 — 08 + {| Bent up bars = Seine 18 x .012)=3.44 m, {No =8.30-.08- 26 | 3.52 Adding one depth 8 em 24 =26) je for two bent ups. Total] 184.40] @ 89 | iy 184.40) §.89= 164.12 kl Distributionbars6 mm. (dia. @0.22 kg) m)— Bottom bars central portion 18 cm c/c (No = 2.00 5-19) 1=6.30 ~ 08 + 18 12 | 6.33 (18.006)= 6.33 m Bottom bars two sides 2x3 | 6.33 Top bars two sides | 2x3] 6:33 bes Total | 151:92! @ 22] keym = | 151.92 |x 29 |33.42 kp, i a quintal “ABSTRACT F ESTIMATED COST =. work 1:2: 4 excluding steel and its bending but including centering and shuttering and bending of steel 2.495 cum @ 675,00 per cu m = Rs. 1684.12 2. Steel bars including’ bending (mild stecl) in R. work 1.975 q @ 515.00 per quintal = Rs. 1017.13 Total Add 3% for Contingencies and Workcharged Establishment Rs, 2836.31 (Schedule of bars given in the next page 232.), Grand Total232 ESTIMATING AND COSTING SCHEDU LE OF BARS- R.C.C. SLAB ‘SHAPE OF BENDING LENGTH No, | TOTAL DIMENSIONS IN om. OF EACH LENGTH | weicHT m m kg. DESCRIPTION OF BARS, MAIN STRAIGHT (een ee tenn | BARS 12 mm. DIA 3.44 a | 9288 MAIN BENT UP . fas Py 91.52 ans 200, 61 on 12mm. DA vesao | toate BOTTOM DISTAL 633 18 | 11394 a BUTING BARS 7 eae ,_ 622 aa ‘ a TOP DISTRIBUTING | —— BARS 6mm. DIA 633 6 |_srse 151.92 gaa2 Note-- (i) “Centering and shuttering are incuded in the R.C. C. work. If centering and shuttering are paid separately, the area can be found as below : ‘Area of centéring and shuttering 6.00 m x3,00 m = 18 sq m. Cost of centering and shuttering @ Rs. 20.00 per sqm = 18 x 20.00 = Rs. 360.00 (i For over-lapping at joints of bars and wastage 5¢¢ of the total steel may be added. Note.-. For two hook lengths take 18 dia. of bar For 45°bent ups at both ends add one depth in between bars. ESTIMATING OF R. C. C. BEAM Example7. — Prepare a detailed estimate of 2 R.C.C. beam of 8 metre clear span and eae. 40 em in section from the given drawings (Fig 55). Steel in detail and R. C. C. work shall be calculated separately. Also prepare d schedule of bars. R.C.C. RECTANGULAR BEAM ‘stimups 2 ge 12mm 018 BREE 9, 10mm Dia, 12em cle ‘8m Clear Span © igen Dig somm Dia 20em c’e 6mm Dia 35em ele Bats tos. 2ommoia Bent UP Bars “2Nos. 20mm Dia nt Up 8.00 Clear Span L-SECTION Fig, 5-5R.C.C. BEAMS 23 ar Messorement and Caletions of Quantites (Ex, 3) FT Topi reed Height santity| Explanat uno | oF ty sete | Length aa planatory notes . fof works m. m m + —Tr ce. work 1:24 T [RCE steel and excluding its bending but ipeluding centering sesame | 1 | geo | 040 | 075 238 | No deduction for vol. of 2 | Steel bars including pending (mild steel) RCC. work Main oa igh ‘mm dia. straight zim de ssid | 4 | ao2=| 35.68 |22.98-| 106.33 | 128.60. 2nd covers kg | ke. | #2 books=8.60 - (Qed cx) + (18 x 22 mm) 892m 20 mm dia. bent up 20mm diatom | 4 | 948=| 37.92 |x247=| 93.66 | L=8.60 - 2 end covers ig | kg. |+2hookstone depth =8.60-8em + (18% 20 mm) + 60 em , =9.48m 12 mm dia top bars G08) tale S| 2 |ara=| 17.48 |x0,89-| 15.56 | 178.60 - Zend ogre Ke | ke | #2 books=8.60 - 8m . Vas 12 mm) 38.74 m* Stirrups, 10 mm dia, bars 0.62 kg/m— Atend IZeme. toc. | 5x2| 2.42 1 A{65124322 ex hooks +extra 30 cm=194 cm Next at 20 =! ete... jaxo} 2.42 “+(1810mm)#30 em=2.42m . Total 9 Stirrups 6 amd 18x | 2.42 40.32 | x0.62= | 27.01 kg| @023 kg/m — Ee At central remaining length of 530m at3s cmc. toc. w-.| 14 | 2.42 Total | 14x | 2.42'=| 33.88" |0.22 ke Total * 12mm di wer-le 12mm) = 602 em = 6,02 m. lia. top (construction) bars; may be short ‘aps and two hooks = 480m + I depth 42 ‘overlaps + 2 hooks = quintal ith some Gflength in between bent up par gem (8™ 460m + 60cm nn254 ESTIMATING AND COSTING ABSTRACT OF ESTIMATED COST (EX. 3) Item Rate Amount No. | Particulars of items of work Quantity} Unit Per Rs. P. Rs. P, 1 | R.C.C. work 1:2: 4 excluding steel and its bending but including centering and shuttsring and binding of steel 258 | cum | 675.00} cum | 1714.50 2 | Steel bars including bending (mild steel) in R.C.C. work ~ | 2.50 |quintal] 515.00 | quintal | 1287.50 Total 3002.00 Add 3 % for Contingencies and 2% for Workcharged Establishment 150.00 Grand Total 3152.00 SCHEDULE OF BARS RCC. BEAM Description of | Shape of Bending [Length [No]Total | Weight] Bars Dimensions in cm | of each Length} kg MAINSTRAIGHT | ————ns2 a BARS 2mm DIA, |=] sar | 4] 3568 | 10633 MAIN BENT UP” bow 450 BARS 20mm DIA sel] 988] 2 | 896 | 4083 MAIN BENT UP = as BARS 20mm DIA | ie“ — Hed] 9.48 | 2 | 1896 | 4683 “Tor STRAIGHT =<——s BARS 2mm DIA | ——v2———H] a4 | 2 | ras | 1556 sunecrsioam tte) 2 bad Dia mit 4 Bed | ane fis] ase | 2500 STIRRUPS6 mm FH emt das iin Pte JE Le bial aw Note—(i) If centering and shuttering is paid separately, the area and cost can be found as follows: — ‘Area of centering and shuttering=(Bottom and two vertical sides x length + two ends. = [(40 cm + 2 * 75 cm) x 8.60 m] + (2 40 em x 75 cm) = (1.90 x 8,60) + (2 x .40 x .75) 16.34 + .60 = 16.94 sq m. Cost of centering and shuttering @ Rs. 20.00 per sq m = 16.94 x 20.00 = Rs. 338.80. (ii) For over-lapping at joints 5% of the whole steel may be provided in the estimate. Length for hooks and bent ups in steel reinforcement bars—For two hooks take length as 18 dia. of bar. For 45° bent ups at both end: add one depth in between bars (see page 214). Example 4—Prepare a detailed estimate of the R.C.C. T-beam slab of the roof of a room 6 mx 9 m from the given drawing (Fig. 5-6). R.C.C. work shall include centering and shuttering and binding of rods in position but shall exclude steel including bending in reinforcements which shall be tuken under a separate item.
You might also like
Ecpm Unit 1-4 Notes
PDF
100% (2)
Ecpm Unit 1-4 Notes
169 pages
Fdocuments - in Railway PPT For Civil Engg 58f9da06c7b6a
PDF
No ratings yet
Fdocuments - in Railway PPT For Civil Engg 58f9da06c7b6a
34 pages
Tilt and Shift in Well Foundation
PDF
No ratings yet
Tilt and Shift in Well Foundation
2 pages
RCC Question Bank
PDF
No ratings yet
RCC Question Bank
3 pages
Ce Foundation Engineering
PDF
No ratings yet
Ce Foundation Engineering
40 pages
Ocf by Badal Sir
PDF
No ratings yet
Ocf by Badal Sir
30 pages
Internship Report On Study of Construction of Auditorium
PDF
No ratings yet
Internship Report On Study of Construction of Auditorium
65 pages
Benefit-Cost Ratio of Such A Dam Is Always Higher
PDF
No ratings yet
Benefit-Cost Ratio of Such A Dam Is Always Higher
9 pages
Basic Civil and Mechanical Engineering Unit 1 Surveying and Levelling Part A Q & A
PDF
100% (1)
Basic Civil and Mechanical Engineering Unit 1 Surveying and Levelling Part A Q & A
5 pages
Model Question Paper Four Year B. Tech. Degree Examination Iii - Semester Examination Civil Engineering Ce206: Building Planning and Drawing (BPD)
PDF
No ratings yet
Model Question Paper Four Year B. Tech. Degree Examination Iii - Semester Examination Civil Engineering Ce206: Building Planning and Drawing (BPD)
2 pages
Acd Lab Manual
PDF
No ratings yet
Acd Lab Manual
31 pages
CE2306 Design of RC Elements Anna University Question Bank Question Paper 2 Marks and 16 Marks
PDF
No ratings yet
CE2306 Design of RC Elements Anna University Question Bank Question Paper 2 Marks and 16 Marks
9 pages
CE2306 Design of RC Elements Anna University Question Bank Question Paper 2 Marks and 16 Marks
PDF
No ratings yet
CE2306 Design of RC Elements Anna University Question Bank Question Paper 2 Marks and 16 Marks
12 pages
Chemistry Viva Question
PDF
No ratings yet
Chemistry Viva Question
12 pages
G. Ravindra Kumar, Associate Prof, Govt Engineering College, Chamarajanagar Page 1 of 16
PDF
No ratings yet
G. Ravindra Kumar, Associate Prof, Govt Engineering College, Chamarajanagar Page 1 of 16
16 pages
Chapter 6 Safety in Civil Engineering.
PDF
No ratings yet
Chapter 6 Safety in Civil Engineering.
4 pages
PreStressed Concrete Structures Unit 4 With ANS
PDF
No ratings yet
PreStressed Concrete Structures Unit 4 With ANS
7 pages
RCC & PSC: Class Notes 2019
PDF
No ratings yet
RCC & PSC: Class Notes 2019
329 pages
962 PDF
PDF
No ratings yet
962 PDF
36 pages
Analysis of Durability of High Performance Concrete Using Artificial Neural Networks
PDF
No ratings yet
Analysis of Durability of High Performance Concrete Using Artificial Neural Networks
19 pages
Ready Mix Concrete: Unit 5
PDF
No ratings yet
Ready Mix Concrete: Unit 5
49 pages
Dss - Question Bank
PDF
No ratings yet
Dss - Question Bank
10 pages
Strength of Materials Marks
PDF
No ratings yet
Strength of Materials Marks
28 pages
MOS Oral Questions
PDF
No ratings yet
MOS Oral Questions
3 pages
Ce8020 Maintenance Repair and Rehabilitation of Structures Reg 2017 Question Bank
PDF
No ratings yet
Ce8020 Maintenance Repair and Rehabilitation of Structures Reg 2017 Question Bank
7 pages
CE3361 - Surveying Lab Manual Print
PDF
No ratings yet
CE3361 - Surveying Lab Manual Print
45 pages
Question Paper Code: Reg. No.
PDF
No ratings yet
Question Paper Code: Reg. No.
2 pages
Fire Demand Problems
PDF
No ratings yet
Fire Demand Problems
3 pages
Design of Compression Members
PDF
No ratings yet
Design of Compression Members
36 pages
Arches - Problems
PDF
No ratings yet
Arches - Problems
14 pages
Attachment 1 - Layout of Detailed Design Drawings of Sewer System of Township, KGL-DD-CI-17!01!450 46
PDF
No ratings yet
Attachment 1 - Layout of Detailed Design Drawings of Sewer System of Township, KGL-DD-CI-17!01!450 46
11 pages
17CV551-Module 3
PDF
No ratings yet
17CV551-Module 3
16 pages
Plate Girder
PDF
No ratings yet
Plate Girder
16 pages
Cad Lab - II Manual
PDF
No ratings yet
Cad Lab - II Manual
44 pages
Solid Mechanics: Amit Sir (M-Tech (STRUCTURE), BE, Diploma in Civil), 7020059691/7385990691
PDF
No ratings yet
Solid Mechanics: Amit Sir (M-Tech (STRUCTURE), BE, Diploma in Civil), 7020059691/7385990691
9 pages
Department of Civil Engineering Subject Name: Basic Civil Engineering Question Bank Unit 1 Part I - 2 Marks Questions
PDF
No ratings yet
Department of Civil Engineering Subject Name: Basic Civil Engineering Question Bank Unit 1 Part I - 2 Marks Questions
7 pages
Gate Indiabix PDF
PDF
No ratings yet
Gate Indiabix PDF
122 pages
Analysis of Frame
PDF
No ratings yet
Analysis of Frame
8 pages
Analysis of Indeterminate of Structures: Model Question Paper - With Effect From 2020-21 (CBCS Scheme)
PDF
No ratings yet
Analysis of Indeterminate of Structures: Model Question Paper - With Effect From 2020-21 (CBCS Scheme)
7 pages
C A D - BPD Manual 23.07.2018
PDF
No ratings yet
C A D - BPD Manual 23.07.2018
68 pages
Is Unit-5 Part 1
PDF
No ratings yet
Is Unit-5 Part 1
27 pages
Sizse in MM Weight KG./M Size in MM Weight KG./M
PDF
No ratings yet
Sizse in MM Weight KG./M Size in MM Weight KG./M
4 pages
Structural Engineering PG Lab Manual
PDF
No ratings yet
Structural Engineering PG Lab Manual
47 pages
Question Paper Code: X: (10×2 20 Marks)
PDF
No ratings yet
Question Paper Code: X: (10×2 20 Marks)
3 pages
Toaz - Info Engineering Mechanics Ss Bhavikattipdf PR
PDF
No ratings yet
Toaz - Info Engineering Mechanics Ss Bhavikattipdf PR
234 pages
Laspotech Lecture I On Hydraulic and Hydrology-1
PDF
No ratings yet
Laspotech Lecture I On Hydraulic and Hydrology-1
7 pages
Objectives of On The Job Training Program
PDF
No ratings yet
Objectives of On The Job Training Program
17 pages
T-Beam MCQ Group 03
PDF
100% (1)
T-Beam MCQ Group 03
3 pages
(WWW - Entrance-Exam - Net) - Sathyabama University B.E in ME-3rd Semester Fluid Mechanics & Machinery Sample Paper 6
PDF
No ratings yet
(WWW - Entrance-Exam - Net) - Sathyabama University B.E in ME-3rd Semester Fluid Mechanics & Machinery Sample Paper 6
3 pages
A Simply Supported Beam of 4m Effective Span Is Laterally Supported Throughout
PDF
100% (1)
A Simply Supported Beam of 4m Effective Span Is Laterally Supported Throughout
1 page
Practical Lab PDF of 3rd Semester Diploma
PDF
No ratings yet
Practical Lab PDF of 3rd Semester Diploma
31 pages
MMM Lab Viva Questions
PDF
No ratings yet
MMM Lab Viva Questions
3 pages
BCE Lab Manual
PDF
No ratings yet
BCE Lab Manual
69 pages
17CV72 - DRSS - Notes
PDF
No ratings yet
17CV72 - DRSS - Notes
57 pages
Summer Internship AT North Western Railways
PDF
No ratings yet
Summer Internship AT North Western Railways
32 pages
Lec 2 Chain Cross Staff Surveying
PDF
No ratings yet
Lec 2 Chain Cross Staff Surveying
24 pages
Sur-2 Marks
PDF
No ratings yet
Sur-2 Marks
17 pages
slab and beam
PDF
No ratings yet
slab and beam
6 pages
Beam Problems End Sem
PDF
No ratings yet
Beam Problems End Sem
3 pages
Experiment 09
PDF
No ratings yet
Experiment 09
8 pages