0% found this document useful (0 votes)
109 views

Estimation of RCC structure

Estimation

Uploaded by

Rajeshwari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
0% found this document useful (0 votes)
109 views

Estimation of RCC structure

Estimation

Uploaded by

Rajeshwari
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF or read online on Scribd
You are on page 1/ 5
230 ESTIMATING AND COSTING ESTIMATE OF R.C.C. ROOF SLAB Example 2 — Prepare a detailed estimate of a R.C.C. Roof Slab of 3 metres clear span and 6 metres long from the given drawings (Fig. 5-4). R.C.C. work including centering and shuttering and steel reintorcement in detail shall be taken separately. Also prepare a schedule of bars, R.C.C, ROOF SLAB toon ‘am ClearSpan Alt. Bars Bont uo em ‘Tamm DiaMain Bars 120m clo Ksém], 506m Distr. bars 6mm Dia 1gemc/e* __50CM ‘am Clear Span. (CROSS SECTION PART PLAN SHOWING ARRANGEMENT OF REINFOREMENT BARS Fig. 5-4 Note~In pi ‘Plan bent up and top bars have been shown in dotted lines, I RCC ROOF stag Ww Details of Measurement and Cotestation of Quantities (Bx, 2) item| Particulars of fa Height No. ti as IN 7 acl Ne lefwona "|§* tenet Basal SS Qc] iim la | { 1 | R.C.C.work 1 22:3 | 1 excluding steel and its bending bt } S including centering | | and shuttering and binding steel 1} 630] 330 | a2 | 2495 [xo deduction for steel Tas eum | bars, 2 | Steel bars including bending (mild steel in R.C.C work— Main bars 12 mm dia, @ 0.89 kej/m— = Straight bars Side cover 4 cm \ 24 em cet L=3.30 — 2 side covers (No =2 8 1 fan | 3.44 2 hooks Be 2 =27) 13.30 — 08 + {| Bent up bars = Seine 18 x .012)=3.44 m, {No =8.30-.08- 26 | 3.52 Adding one depth 8 em 24 =26) je for two bent ups. Total] 184.40] @ 89 | iy 184.40) §.89= 164.12 kl Distributionbars6 mm. (dia. @0.22 kg) m)— Bottom bars central portion 18 cm c/c (No = 2.00 5-19) 1=6.30 ~ 08 + 18 12 | 6.33 (18.006)= 6.33 m Bottom bars two sides 2x3 | 6.33 Top bars two sides | 2x3] 6:33 bes Total | 151:92! @ 22] keym = | 151.92 |x 29 |33.42 kp, i a quintal “ABSTRACT F ESTIMATED COST =. work 1:2: 4 excluding steel and its bending but including centering and shuttering and bending of steel 2.495 cum @ 675,00 per cu m = Rs. 1684.12 2. Steel bars including’ bending (mild stecl) in R. work 1.975 q @ 515.00 per quintal = Rs. 1017.13 Total Add 3% for Contingencies and Workcharged Establishment Rs, 2836.31 (Schedule of bars given in the next page 232.), Grand Total 232 ESTIMATING AND COSTING SCHEDU LE OF BARS- R.C.C. SLAB ‘SHAPE OF BENDING LENGTH No, | TOTAL DIMENSIONS IN om. OF EACH LENGTH | weicHT m m kg. DESCRIPTION OF BARS, MAIN STRAIGHT (een ee tenn | BARS 12 mm. DIA 3.44 a | 9288 MAIN BENT UP . fas Py 91.52 ans 200, 61 on 12mm. DA vesao | toate BOTTOM DISTAL 633 18 | 11394 a BUTING BARS 7 eae ,_ 622 aa ‘ a TOP DISTRIBUTING | —— BARS 6mm. DIA 633 6 |_srse 151.92 gaa2 Note-- (i) “Centering and shuttering are incuded in the R.C. C. work. If centering and shuttering are paid separately, the area can be found as below : ‘Area of centéring and shuttering 6.00 m x3,00 m = 18 sq m. Cost of centering and shuttering @ Rs. 20.00 per sqm = 18 x 20.00 = Rs. 360.00 (i For over-lapping at joints of bars and wastage 5¢¢ of the total steel may be added. Note.-. For two hook lengths take 18 dia. of bar For 45°bent ups at both ends add one depth in between bars. ESTIMATING OF R. C. C. BEAM Example7. — Prepare a detailed estimate of 2 R.C.C. beam of 8 metre clear span and eae. 40 em in section from the given drawings (Fig 55). Steel in detail and R. C. C. work shall be calculated separately. Also prepare d schedule of bars. R.C.C. RECTANGULAR BEAM ‘stimups 2 ge 12mm 018 BREE 9, 10mm Dia, 12em cle ‘8m Clear Span © igen Dig somm Dia 20em c’e 6mm Dia 35em ele Bats tos. 2ommoia Bent UP Bars “2Nos. 20mm Dia nt Up 8.00 Clear Span L-SECTION Fig, 5-5 R.C.C. BEAMS 23 ar Messorement and Caletions of Quantites (Ex, 3) FT Topi reed Height santity| Explanat uno | oF ty sete | Length aa planatory notes . fof works m. m m + —Tr ce. work 1:24 T [RCE steel and excluding its bending but ipeluding centering sesame | 1 | geo | 040 | 075 238 | No deduction for vol. of 2 | Steel bars including pending (mild steel) RCC. work Main oa igh ‘mm dia. straight zim de ssid | 4 | ao2=| 35.68 |22.98-| 106.33 | 128.60. 2nd covers kg | ke. | #2 books=8.60 - (Qed cx) + (18 x 22 mm) 892m 20 mm dia. bent up 20mm diatom | 4 | 948=| 37.92 |x247=| 93.66 | L=8.60 - 2 end covers ig | kg. |+2hookstone depth =8.60-8em + (18% 20 mm) + 60 em , =9.48m 12 mm dia top bars G08) tale S| 2 |ara=| 17.48 |x0,89-| 15.56 | 178.60 - Zend ogre Ke | ke | #2 books=8.60 - 8m . Vas 12 mm) 38.74 m* Stirrups, 10 mm dia, bars 0.62 kg/m— Atend IZeme. toc. | 5x2| 2.42 1 A{65124322 ex hooks +extra 30 cm=194 cm Next at 20 =! ete... jaxo} 2.42 “+(1810mm)#30 em=2.42m . Total 9 Stirrups 6 amd 18x | 2.42 40.32 | x0.62= | 27.01 kg| @023 kg/m — Ee At central remaining length of 530m at3s cmc. toc. w-.| 14 | 2.42 Total | 14x | 2.42'=| 33.88" |0.22 ke Total * 12mm di wer-le 12mm) = 602 em = 6,02 m. lia. top (construction) bars; may be short ‘aps and two hooks = 480m + I depth 42 ‘overlaps + 2 hooks = quintal ith some Gflength in between bent up par gem (8™ 460m + 60cm nn 254 ESTIMATING AND COSTING ABSTRACT OF ESTIMATED COST (EX. 3) Item Rate Amount No. | Particulars of items of work Quantity} Unit Per Rs. P. Rs. P, 1 | R.C.C. work 1:2: 4 excluding steel and its bending but including centering and shuttsring and binding of steel 258 | cum | 675.00} cum | 1714.50 2 | Steel bars including bending (mild steel) in R.C.C. work ~ | 2.50 |quintal] 515.00 | quintal | 1287.50 Total 3002.00 Add 3 % for Contingencies and 2% for Workcharged Establishment 150.00 Grand Total 3152.00 SCHEDULE OF BARS RCC. BEAM Description of | Shape of Bending [Length [No]Total | Weight] Bars Dimensions in cm | of each Length} kg MAINSTRAIGHT | ————ns2 a BARS 2mm DIA, |=] sar | 4] 3568 | 10633 MAIN BENT UP” bow 450 BARS 20mm DIA sel] 988] 2 | 896 | 4083 MAIN BENT UP = as BARS 20mm DIA | ie“ — Hed] 9.48 | 2 | 1896 | 4683 “Tor STRAIGHT =<——s BARS 2mm DIA | ——v2———H] a4 | 2 | ras | 1556 sunecrsioam tte) 2 bad Dia mit 4 Bed | ane fis] ase | 2500 STIRRUPS6 mm FH emt das iin Pte JE Le bial aw Note—(i) If centering and shuttering is paid separately, the area and cost can be found as follows: — ‘Area of centering and shuttering=(Bottom and two vertical sides x length + two ends. = [(40 cm + 2 * 75 cm) x 8.60 m] + (2 40 em x 75 cm) = (1.90 x 8,60) + (2 x .40 x .75) 16.34 + .60 = 16.94 sq m. Cost of centering and shuttering @ Rs. 20.00 per sq m = 16.94 x 20.00 = Rs. 338.80. (ii) For over-lapping at joints 5% of the whole steel may be provided in the estimate. Length for hooks and bent ups in steel reinforcement bars—For two hooks take length as 18 dia. of bar. For 45° bent ups at both end: add one depth in between bars (see page 214). Example 4—Prepare a detailed estimate of the R.C.C. T-beam slab of the roof of a room 6 mx 9 m from the given drawing (Fig. 5-6). R.C.C. work shall include centering and shuttering and binding of rods in position but shall exclude steel including bending in reinforcements which shall be tuken under a separate item.