0% found this document useful (0 votes)
26 views1 page

Helios Firing Schedules - FAHRENHEIT - Page 2

Uploaded by

james.perrin69
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
26 views1 page

Helios Firing Schedules - FAHRENHEIT - Page 2

Uploaded by

james.perrin69
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

TACK FUSE FIRING SCHEDULES_(*F)

The following schedules were built for Bullseye glass based on decades of
experience and testing published by Bullseye, knowledge published by artists who
use BE glass, and personal experience collected from the kilns at Helios. We
adjust these schedules based on which kiln we are using and the needs of each
project. Make adjustments for your own specific kiln and for each specific project. All temperatures
are in degrees FAHRENHEIT.

TACK - 1 Layer - 3mm thick TACK - 2 Layers - 6mm thick TIPS to adjust your
schedule
Ramp Temp Hold Ramp Temp Hold
(*F per (*F per
hr)
(*F) (hrs:min)
hr)
(*F) (hrs:min)
Increase or decrease the
processing temperature
1 300 1000 :15 1 300 1000 :15 (segment 3) based on how
2 100 1225 :30 2 100 1225 :30 your kiln fires and how much
the glass needs to move.
3 Full 1325 :10 3 Full 1325 :10
4 Full 900 :45 4 Full 900 :60 For non-BE glass, change the
annealing temperature
5 200 800 :00 5 100 800 :00
(segment 4) and following
6 300 700 :00 6 200 700 :00 segments according to the
7 0 7 300 200 :00 manufacturer of the glass.

8 0 For textured pieces, or


thicker than 12mm, change
anneal hold and cooling
segments (segments 4-7)
TACK - 3 Layers - 9mm thick TACK - 4 Layers - 12mm thick using Bullseye Thick Slabs
Annealing chart.
Ramp Temp Hold Ramp Temp Hold
(*F per
hr)
(*F) (hrs:min)
(*F per
hr)
(*F) (hrs:min) Add segments if your project
needs:
1 250 1000 :15 1 200 1000 :15 ◆ Expel moisture
2 100 1225 :30 2 100 1225 :30 ◆ Expel binders/glue
3 Full 1325 :10 3 Full 1325 :10 ◆ Pink Hold
4 Full 900 1:30 4 Full 900 2:00 ◆ Pre-Anneal Hold

5 75 800 :00 5 50 800 :00 For larger than 10in x 10in,


use the next thicker schedule.
6 150 700 :00 6 100 700 :00
Go another layer up for every
7 250 200 :00 7 200 200 :00 4in larger.
8 0 8 0
(See TIPS page for more
details)

You might also like