Draft STC-TRS-3Phase-4-Faults
Draft STC-TRS-3Phase-4-Faults
STC-TRS-3-Phase-04
Most faults are detected by the relevant monitoring
equipment and are reported to the train driver by
indication lamps or displays on the screen.
Note:
5. Isolation of HBB1:
Cab 2 isolated, driving possible from cab-1 only.
6. Isolation of STB1:
Cab 1 isolated, driving possible from cab-2 only.
7. Isolation of STB2:
Cab 2 isolated, driving possible from cab-1 only.
9. Isolation of FLG2:
No regenerative brake.
• Also, after the last fault message has appeared, the fault with
the highest priority is displayed once again (ring buffer
principle).
1. VCB off.
2. Lower pantograph.
4. Wait 1 minute.
Possible consequences:
Consequences:
F 01 01 P1 ______ Priority (1 or 2)
Example
Commission Data
Responsibility- : Mal-operation
Section/Division- : MGS
Responsibility- : Mal-operation
Responsibility : Mal-operation
Responsibility : Mal-operation
Section/Division- : DGR ER
Responsibility- :
Mal. Operation /Bad workmanship CLW /Bad
maintenance shed.
Responsibility : Mal-operation
Phase II - Module No. STC-TRS-3-Phase-04
Action needed by driver:
Section/Division- : BDN/NCR
Responsibility : Mal-operation
Section/Division : VRBD/NCR
Equipment Involved :
Responsibility : Mal-operation
This feature helps crew to replace the fuse of the roof LED unit
by Loco pilots with spare fuse provided there on the unit itself.
Spare
fuse
To keep the Cab & Machine room lights in „on‟ condition when
needed, the BL key is required to be put on either driving
position or cooling position.
Error PS Hardware
Error Plausibility
Error Tachogenerator
Or
Or
• Crew should try to find out the reason for this by checking
the DDS data, if message of SLG1 Ventilation Bg. BUR-1
Disturbed is noted, then OCB might have stopped working
causing temperature of the oil to become high.
2) VCB Stuck ON one time & VCB stuck Off two times.
1) After pressing BLDJ & FLG node from 550 to 560, but
LSDJ not extinguishing, message VCB stuck off appears
on screen with LSFI blinking & BPFA glowing.
Acknowledge the fault by pressing BPFA & repeat the
same operation. If not success, check condition of VCB
cock on PT manifold in Pn. Panel. If cock is in open
condition. Loco can not work & it is to be failed.
Important:
In case of any problem with Parking Brake, manually release parking
brake with Parking brake solenoid valve 30 by pressing release side.
* Unlock the A9 handle in leading cab and lock the same in rear
cab.
74
DV
manifold
Exh -B
If 70 not isolated then BP pr of leading loco exhaust-A .
If 74 not isolated then BP pr of leading loco exhaust-B.
So both cocks must be isolated during dead movement.
When dead loco is attached with live loco and BP pipe is coupled, then the BP pressure of the
leading loco enters through dead engine cock 47 and NRV 48 to fill up the aux. reservoir to
5.0kg/sq cm. This pressure enters into solenoid valve 30 through parking brake pressure regulator
114 and choke 31 to release the Parking Brake units.
Now attach BP & FP Hose with leading loco and open the
angle cocks.
To Brake cylinders
Phase II - Module No. STC-TRS-3-Phase-04
Switch off control electronics.
NOTE :-
PB Bus
DV Release Handle
7. Couple the BP hose pipe with of the leading locomotive and open the
angle cocks.
10. Apply and Release Service brake from the leading locomotive and
ensure that brakes are applying and releasing in the dead loco also.
11. Apply parking brake from the leading locomotive and ensure that
parking brake in not applied in the dead loco.
12. Apply the Brake after 500 meter run, check and ensure there in no
brake binding in the dead Loco.
• The air flow indicators sense the increase in the mass flow
of air and correspondingly provide a visual indication to
driver in case of train parting.
The wearing surfaces of the knuckle like the nose, lock face
and hub may hardened by some suitable local hardening
process like Plasma weld deposition process to reduce wear.
Introduction
• This software is available for estimation of Emergency
Braking Distances for goods and passenger trains
(locomotive and trailing stock) fitted with „L‟ type and „K‟
type composition brake blocks. This software is made in
FORTRAN .
2017 - 18
2014 - 15
2015 - 16
Type of 2016 - 17 Action Plan
defects
2014 - 15
2015 - 16
2016 - 17
2017 - 18
Type of Action Plan
defects
2017 - 18
Type of
Action Plan
defects
2. Speed Sensor
Speed 1 1 - - Testing is being done on test bench by VVF
sensor drive
Clearance is being measured between sensor &
disc.
TOTAL 1 1 0 0 -
3. Pneumatic Valves
Air 2 - 3 - Overhauling of Non return valve is being done
leakage in each inspection.
One cycle overhauling of Unloader valve
completed and being done in MOH/IOH.
TOTAL 2 - 3 0 -
2016 - 17
2017 - 18
Type of defects Action Plan
4. Central Electronics
Cards failure 2 - 2 1 8 Amps reed relay replacement as per
RDSO letter no. EL/11.5.5/5 dtd.
28.12.12 done of digital I/O card.
Back plane - 1 - Working of churning fans are being
defective checked during inspections.
Air flow - - - -
measurement is
being done for
CEL-1 & CEL-2
TOTAL 2 0 3 1 -
2016 - 17
2015 - 16
2017 - 18
Type of defects Action Plan
5. Auxiliary Converter
GG module thyristor 2 - - - Thyristor snubber circuit is being
punctured checked in every inspection.
WRE module control 1 - - - Testing of WRE module firing
card defective cards is being done in Electronics
lab against fault message.
DC link capacitor bank - 1 - - Modification of DC link
capacitors as per MS 0436 by
equal load sharing is being done.
Air flow measurement - - - -
is being done for BUR
BOX -1 & BUR Box -2
TOTAL 3 1 0 0 -
Phase II - Module No. STC-TRS-3-Phase-04
2014 - 15
2016 - 17
2015 - 16
2017 - 18
Type of defects Action Plan
2017 - 18
2015 - 16
2016 - 17
Type of defects Action Plan
8. Auxiliary Motors
TOTAL 1 1 0 0 -
(ii) Increased height of the cap hex head for proper grip
for tightening.
(b) Investigation:
(a) Problem:
(a) Problem:
Foreign particles go via Train BP Pipe line and enter into
BPCP during Emergency Brake application causing air
leakage .
(b) Investigation:
After Fitment
Fifth inspection
is running dt
24/01/17 and
found foreign
particle
(Stone)got
arrested inside
Mesh Filter
1. Wire mesh for BPCP (in PVEM port) has been tried
out satisfactorily at ELS Tata Nagar jointly with shed
staff on 04-March-2016 on one of the Locomotive.
Wire mesh
(b) Investigation:
Unloader
Valve Fig B. Unloader Valve (UV) in CP circuit.
Isolating Cock
Unloader Valve
• Isolating Cocks type OPL (Open Parallel to Line) with proper sealing should be
provided on the exhaust port of unloader valve.
• Loco Pilot to make entry in the log book, whenever seal is broken.
• In case of isolation, compressor will start under back pressure. This may lead to
tripping of auxiliary convertor due to high starting current.
• Therefore, unloader circuit shall be attended at the first available opportunity.
(a) Problem:
Railways were reporting the problem of metal seated NRV‟s (Disk Valve type)
getting struck up in E70 brake system leading to air leakage.
Rubber seated
NRV
The reason for stuck up of NRV had been attributed to breakage of studs/spring
seats and ingress of foreign particles. Carbon deposits were also causing NRV‟s
to struck-up.
Metal seated type NRV was replaced by rubber seated type (Polyurethane
seated). The Polyurethane rubber has excellent tear and abrasion resistant with
high hardness and a low resilience. After the provision of the Polyurethane
seated NRV, the problem of NRV getting stuck-up reduced substantially.
(a)Problem:
Zonal Railways have reported the cases of breakage of air flow indicator gauge
glass. AFI gauge is shown in fig.
(a) Problem:
Improper seating
Gap of up to 0.7mm
was observed in
between Rubber
insert & Valve stem
valve
ROUTINE TESTS :-
1. Measurement of winding resistance
2. Measurement of insulation resistance
3. Seperate source voltage withstand test (High Voltage tests
on HV & LV)
4. Induced Over voltage Withstand test (DVDF test)
5. Measurement of voltage ratio or Turns – Ratio Test
6. Measurement of NO LOAD LOSS & current.
7. Measurement of LOAD LOSS & IMPEDENCE.(EFFICIENCY
& REGULATION)
8. Vector Group Verification
9. Oil BDV test.
10. Tests on OLTC (if Attached)
THESE TESTS ARE CARRIED OUT ONLY ON ONE TRANSFORMER OF THE LOT
In addition to all Routine Tests, following additional tests are included in type tests :-
Secondary
Primary
(LV)
(HV)
HV to LV & GND
LV to HV & GND
HV to LV
A general formula for IR value of transformer windings in MΩ at 500V DC & 200C, for
winding to GND (with other wdg. guarded) or W to W with core guarded, is given as :-
IR = [C.E /√KVA], where C=1.5 (or 0.8 for test of wdg. with other wdg. grounded)
E=Voltage rating of wdg. under test, KVA= Rated capacity of wdg. under test.
The TTR set operates on the principle that the voltage ratio of the transformer at no load is
practically equal to the true turns ratio. Test voltage is applied to HV winding of the transformer,
and LV voltage output is accurately measured.
The major source of error in a transformer is a primary impedance drop due to magnetizing
current, which is kept to a minimum by excitation at a fraction of rated voltage. By employing a
null balance system, the turns ratio of a transformer can be determined accurately.
Impulse generator is used to produce the specified voltage impulse wave of 1.2/50 micro seconds
wave.
One impulse of a reduced voltage between 50 to 75% of the full test voltage and subsequent three
For a three phase transformer, impulse is carried out on all three phases in succession. The
voltage is applied on each of the line terminal in succession, keeping the other terminals earthed.
The current and voltage wave shapes are recorded on the oscilloscope and any distortion in the
This tests measures the ability of the transformer to withstand the mechanical and thermal
stresses caused by the external short circuit.
HV terminals are connected to the supply bus of the testing plant. The LV is short circuited. The
testing plant is so adjusted to give the rated short circuit current. Supply is closed after specified
duration of short circuit. The record of current wave form is noted.
There should not be any mechanical distortion, fire to the transformer during this test. Similarly
no wave form distortion. The transformer should also withstand the routine tests after the short
circuit test.
The reactance of the winding measured before and after the S.C. test should not vary beyond the
limits stated in the IS-2026.
10 0
I (μA) Total
Charging
10
Absorption
Leakage
1
0.1 1 10 Time (min)
T his value is
Megohms
read/recorded
0 Time 60 sec
Megohms
B
0
Time 10 min
IR
DD Value
Insulation Condition
(in mAV-1F-1)
Bad Greater than 7
Poor 4–7
Questionable 2–4
Ok Less than 2
IR = 0 V(applied) IR V(applied)
Tan δ = IR / IC
Example:
In case the two windings are not same due to any reason,
their waveforms will also be of different type.
Bad processing.
Bad workmanship.
Loose connections.
Bad earthing
Chemical degradation.
Formation of pits.
Tracking / Treeing.
Local heating.
To determine :-
1. Capacitance of void =c
U+ = DIV in +ve half cycle
2. Capacitance of healthy part in portion-I = b
3. Capacitance of healthy part shown in U- = DIV in –ve half cycle
portion-II = a
DIV=Discharge Inception Vol.
Va = Vol. across specimen
Vc = Vol. Across cavity or void Similar PD pulse repeats in
both +ve and –ve half cycles.
AC SUPPLY PD
CONTROL DETECTOR
No switching operation.
No crane operation.
Electrical
Optical
Acoustic transducers
detect and capture
energy
Data
Interpretation
Acoustic energy
radiates from
discharge source
Findings
Surface Tracking on CT
3-PHASE LOCO
Phase II - Module No. STC-TRS-3-Phase-04
• Damping measurement of various optical fibre cable
(OFC) at wave length 850 nm.
SB1 PANEL
Phase II - Module No. STC-TRS-3-Phase-04
CUBICLE CONTROL CIRCUITS 2 PANEL
SB2 PANEL
Phase II - Module No. STC-TRS-3-Phase-04
BUR
Auxiliary converter
Phase II - Module No. STC-TRS-3-Phase-04
Control Electronics
• Main Position
• Stand By Position
• ON simulation mode.
• Check the machine room light ON/OFF from both cab side.
• Check Pantograph
functions.
c) MCP 1+2
e) TM blower 1+2
f) OCU 1+2
a) Inverter fault
o WAP5 100 KN TE
o WAG9,WAP7 150 KN TE
LSP GLOW
8) Interlocking pantograph:
VCB open,
VCB in driving mode: Raise panto in driving
Panto lower.
mode. Close VCB. Lower the panto by ZPT.
Forward OK
Reverser OK