A2 Uas
A2 Uas
C TI 75°C
CO - COS CO - COT C
TI (Sea Water Pump) (Transfer Pump)
TI TI
CO - COL CO - COH
D CENTRAL COOLER
(LT Stand-By Pump) (HT Stand-By Pump) D
HT-Water Drain Brand SILI PUMP Brand SILI PUMP
E
PREHEATING UNIT
O/B (S/B) Brand ALFA LAVAL Brand SILI PUMP
E
PI
Power 3 kW
COOLER
TI PI
PI
TI
F PI F
TI
High
S/C
CIRCULATING PUMP
Low
S/C
PI PI
Drain Tank
G (1.7 m³) G
PI PI
H S/C H 10.23 m
Keyplan of Engine
Jericho Hyansalem Wicaksono
5019201004
H
T 7.42 m
High Cooling System Approved by: Signed
Cb 0.616 Ir. Hari Prastowo, M.Sc.
S/C 196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Type Container 06 - 5019 23 HP004 - CO NTS 01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CODE SYMBOL NAME QTY
CA-AF Air Filter 1
B CA-BV-05
PI CA-RDR Reducer 4 B
To LO Filter CA-NRV-02
CA-RDR-02 CA-BV-13 CA-GV Gate Valve 5
CA-BV-07
D D
CA-ASV-01 CA-ASV-02
CA-GV-02 CA-GV-04
CA-NRV-04 CA-NRV-06 CA-CPR-01 CA-HE-01 CA-CPR-02
PI PI CA-OWS-02 CA-HE-02 CA-OWS-03 CA-NRV-09
CA-NRV-08
CA-GV-03 CA-GV-05
CA-NRV-05 CA-NRV-07
PI PI
CA-DV-02 CA-DV-03
E Drain Drain E
WÄRTSILÄ
2000 L
7L46F 2000 L
CA-ARR-01 CA-ARR-02
8400 kW
F F
CA-BV-15 CA-BV-16
TO DRAIN TO DRAIN
G G
CA-FXP-01
DEPARTMENT OF MARINE ENGINEERING - ITS
PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
C C
LO - 01
LO - 02
LO - 03
OW - 02 LO - 04 FO - 02 FO - 01
LO - 05
FO - 04 FO - 03
FI - 01 CA - 01
OW - 01
DS - 07 DS - 08 FI - 02
deck
top
to
Sewage Treatment
Plant
CA - 02
CA - 04 CA - 03
BG BL - 01
CA - 05
BG BL - 02
CO - 01
lower
deck
D D
tank
to
top
to
CO - 09
CO - 04
CO - 03
CO - 06
CO - 05
CO - 08
CO - 06 CO - 02
CO - 07 DS - 02
Dosing CO - 10
DS - 03
Tank
DS - 01
Drain
Tank
E E
-10 -5 AP 5 10 15 20 25 30 35 -10 -5 AP 5 10 15 20 25 30 35
F F
G G
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
C C
FO - 18
FO - 17
HFO HFO
SERVCE SETTLING
TANK TANK
ENGINE FO - 19
21,12 m³ 38,52 m³
CA - 04
CONTROL
ROOM FO - 20
DS - 05
FO - 05
FRESH
WATER
platform
lower
TANK
to
FO - 06
FO - 07
22,8 m³
FO - 08
D UP
to
main
deck
D
platform
lower
FRESH
to
WATER
TANK
22,8 m³
DS - 06
WORKSHOP
LAMP
FO - 15
FO - 16
STORE FO - 13
FO - 11
HFO HFO
SERVCE SETTLING
FO - 14
TANK TANK
E E
FO - 11
21,12 m³ 38,52 m³
F F
-10 -5 AP 5 10 15 20 25 30 35
G G
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
B B
DS - 06
WORKSHOP LAMP
STORE
FO - 14 FO - 12
FO - 15 FO -16
C DS - 03 CO - 02
C
CO - 10
DS - 01
CO - 04
CO - 08
-10 -5 AP 5 10 15 20 25 30 35 40
D D
E E
ENGINE
CONTROL
FO - 18
ROOM
DS - 05
CA - 03 CA - 04
CA - 02
BL - 01
F F
FO - 01 DS - 07
LO - 01 OW - 01
OW - 02
LO - 04
40 35 30 25 20 15 10 5 AP -5 -10
G G
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System
LO-01
EQUIPMENT
1
INFORMATION NO / SYMBOL
FI-01/02
EQUIPMENT
Fire Pump
QTY.
2
INFORMATION
A LO-02
LO-03
Standby Lubricating
Oil Pump
Lubricating Oil
Separator Feed Pump
1
1
BL-03
BG BL-01/02
Ballast Water Treatment
Bilge-Ballast Pump
1
2
A
Lubricating Oil
1 OW-01 1
Starting Air
CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
Compressor
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve
FO - 09 FO - 10 DS-07 1
SETTLING Sewage Pump
B TANK
FO - 05 FO - 06 FO - 07
FO - 08
SETTLING
TANK
DS-08 Sewage Treatment Plant 1
B
Fuel Oil System
NO / SYMBOL EQUIPMENT QTY. INFORMATION
FO-05/06 2
TANK TANK Pump
Preheater Separator 2
FO-07/08
C FO-15/16
FO-17/18
HFO Final Heater
MDO Separator Feed
2
2
C
Pump
FO-11/12 MDO Separator 2
D CO-08
CO-09
Preheater Circulating
Pump
Preheater Unit
1
1
D
CO-10 Transfer Pump 1
DS - 07
Lwl 132.28 m ASWANIKUMBA
B 19.73 m Container
H 10.23 m I HULL MACH
T Signed
7.42 m
F Cb 0.616 ENGINE ROOM
Prepared by:
Jericho Hyansalem Wicaksono
5019201004
F
Vs 18.5 Knot ARRANGEMENT
Type Container (CROSS SECTIONAL Approved by: Signed
Ir. Hari Prastowo, M.Sc.
VIEW) 196510301991021001
Dwg no. Date Scale Rev.
NTS
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8
A A
Lavatory
Lavatory
Navigation
Deck
Lavatory Lavatory
B B
Deck E
Lavatory Lavatory
Deck D
C C
Lavatory Lavatory Lavatory Lavatory Lavatory
Deck C
D D
Deck B
International
Shore
Connection
Main Deck
CODE EQUIPMENT SYMBOL QTY
DS-BM BELL MOUNTED 1
DS-PMP BLACK WATER PUMP 1
F DS-OB OVERBOARD 2
F
DS-OB DS-OB DS-BV BUTTERFLY VALVE 1
DS-PI PRESSURE INDICATOR PI 2
DS-ISC INTERNATIONAL SHORE CONECTION 2
Black Water DS-STR STRAINER 2
DS - STR - 02 Tank DS-GT GATE VALVE 1
DS-SV SAFETY VALVE 1
DS - GT - 01
DS - BM - 01
G G
Sewage
Treatment
Plant
DEPARTMENT OF MARINE ENGINEERING - ITS
PI
DS - SV - 01
PI PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024
DS - BV - 01 DS - GT - 02
Lpp 125.98 m MV. ASWANIKUMBA
DS - PI - 02 DS - PI - 01 Container
Black Water
DS - STR - 01 Lwl 132.28 m
100A1
Pump
DS - PMP - 01 B 19.73 m Signed
Prepared by:
H H 10.23 m Keyplan of Domestic Jericho Hyansalem Wicaksono
5019201004
H
Double Bottom T 7.42 m System (Sanitary
Approved by: Signed
Cb 0.616 Discharge) Ir. Hari Prastowo, M.Sc.
196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Type Container 08 - 5019 23 HP004 - CO NTS 01
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
A A
Lavatory
Lavatory
Navigation
Deck
Lavatory Lavatory
B B
Deck E
Lavatory Lavatory
Deck D
C C
Lavatory Lavatory Lavatory Lavatory Lavatory
Deck C
D D
Deck B
E Fresh Water E
Lavatory Lavatory Lavatory Lavatory Lavatory Clinic Clinic
Lavatory Lavatory
DS - BV - 09 DS - NRV - 10
DS-PMP BLACK WATER PUMP 1
DS - GT - 01
FRESH WATER TANK DS-OB OVERBOARD 2
22,8 m3
DS - STR - 07 Fresh Water DS-BV BUTTERFLY VALVE 1
LAL
Supply Pump DS - BV - 07
F SS-PMP-03
DS - PI - 06 DS - PI - 05
DS-PI PRESSURE INDICATOR PI 2 F
Fresh Water
LAH
PI DS - SV - 03 PI Hydrophore
DS-STR STRAINER 2
DS - NRV - 08
DS - BV - 08 DS-GT GATE VALVE 1
FRESH WATER TANK
22,8 m3 DS - GT - 02
DS-SV SAFETY VALVE 1
DS - STR - 06 DS - NRV - 09 DS - HDF - 01
SS-PMP-04
LAL
Fresh Water Supply
DS-HDF FRESH WATER HYDROPHORE 2
Stand-by Pump
DS-NRV NON RETURN VALVE 7
DS-LSC LOW SEA CHEST 2
DS - STR - 04 Second DeckDS - NRV - 07 DS - BV - 06 DS-SC HIGH SEA CHEST 2
DS - SC - 03
DS - SC - 04 High Sea Chest
High Sea Chest
DS-LSC HIGH LEVEL ALARM LAH 2
PI DS - SV - 02
G DS - BV - 05 DS - NRV - 06
DS - PI - 04
PI DS - STR - 05
DS-SC LOW LEVEL ALARM LAL
2 G
DS - HDS - 01
DS - PI - 03
DS - NRV - 03 Sea Water
Supply Pump DS - BV - 02
1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System
NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION
LO-02
Pre Lubricating Oil
Pump
Standby Lubricating
Oil Pump
1
1
FI-01/02
BL-03
Fire Pump
1
A
Lubricating Oil
LO-03 1 BG BL-01/02 Bilge-Ballast Pump 2
Separator Feed Pump
Lubricating Oil
LO-04 1 OW-01 Oil Water Pump 1
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1
TO SHORE CONNECTION
Separator
BILGE HOLDING TANK
TO HFO SETTLING
24,26M³
TO OVERBOARD
TO HFO SETTLING
Compressed Air System Domestic System
TO SHORE CONNECTION
NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION
B DS-07
DS-08
Sewage Pump
1
B
Fuel Oil System
NO / SYMBOL EQUIPMENT QTY. INFORMATION
LO - 01
LO - 02
LO - 03
FO-01/02 HFO Transfer Pump 2
OW - 02 LO - 04 FO - 02 FO - 01
LO - 05
FO - 04 FO - 03
TO HYDRANT FO-03/04 MDO Transfer Pump 2
HFO Separator Feed
FO-05/06 2
OW - 01 FI - 01 Pump
DS - 07 DS - 08 FI - 02
Sewage Treatment FO-07/08 Preheater Separator 2
Plant
C
2
C
FO-11/12 HFO Booster Pump
lower
deck
Engine Cooling System
to
CO - 09
TO DOMESTIC SYSTEM NO / SYMBOL EQUIPMENT QTY. INFORMATION
CO - 04
CO - 03
CO - 06 Sea Water Cooling
CO - 05 CO-01/02 2
CO - 08
CO - 06 CO - 02
Pump
CO - 07 DS - 02
CO-03/04 Central Cooler 2
Dosing CO - 10
DS - 03 CO-05 Air Venting Unit 1
Tank
D Drain
Tank
DS - 01 CO-06
CO-07
LT Standby Circuit
Pump
HT Standby Circuit
1
1
D
Pump
Preheater Circulating
CO-08 1
Pump
CO-09 Preheater Unit 1
TO OVERBOARD
SEWAGE TANK COOLING WATER LINE FIRE FIGHTING LINE
15,67 m³
HEAVY FUEL OIL LINE SLUDGE OIL LINE
ASWANIKUMBA
Container
I HULL MACH
Signed
Prepared by:
F ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004 F
ARRANGEMENT
Signed
(TANK TOP PLAN) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System
NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION
LO-02
Pre Lubricating Oil
Pump
Standby Lubricating
Oil Pump
1
1
FI-01/02
BL-03
Fire Pump
1
A
Lubricating Oil
LO-03 1 BG BL-01/02 Bilge-Ballast Pump 2
Separator Feed Pump
Lubricating Oil
LO-04 1 OW-01 Oil Water Pump 1
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1
Separator
Starting Air
CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
Compressor
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve
DS-06 Fresh Water Hydrophore 1
B DS-07
DS-08
Sewage Pump
1
B
Fuel Oil System
NO / SYMBOL EQUIPMENT QTY. INFORMATION
C
2
C
FO-11/12 HFO Booster Pump
D DS - 03
CO-06
CO-07
LT Standby Circuit
Pump
HT Standby Circuit
1
1
D
CO - 02 Pump
Preheater Circulating
CO-08 1
Pump
CO - 10
DS - 01 CO-09 Preheater Unit 1
CO - 04
CO - 08
CO-10 Transfer Pump 1
E E
-10 -5 AP 5 10 15 20 25 30 35 40
DEPARTMENT OF MARINE ENGINEERING - ITS
DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024
ASWANIKUMBA
Container
I HULL MACH
Signed
Prepared by:
F ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004
F
ARRANGEMENT
Signed
(SECTIONAL VIEW) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
LOWER PLATFORM
A A
4,58 m
deck
C C
top
to
Starting Air
CA-01/02 2
Compressor
CA - 02 CA-03/04 Starting Air Vessel 2
CA - 04 Pressure Reducing 1
CA - 03 CA-05
Valve
CA - 05
tank
top
to
D D
TO PNEUMATIC SYSTEM
TO GENERAL SERVICE
COLOR INDICATOR
SEA WATER LINE COMPRESSED AIR LINE
ASWANIKUMBA
Container
I HULL MACH
Signed
F ENGINE ROOM
Prepared by:
Jericho Hyansalem Wicaksono
5019201004
F
ARRANGEMENT
Signed
(PLATFORM PLAN) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System
NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION
LO-02
Pre Lubricating Oil
Pump
Standby Lubricating
Oil Pump
1
1
FI-01/02
BL-03
Fire Pump
1
A
Lubricating Oil
LO-03 1 BG BL-01/02 Bilge-Ballast Pump 2
Separator Feed Pump
Lubricating Oil
LO-04 1 OW-01 Oil Water Pump 1
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1
Separator
Starting Air
CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
Compressor
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve
DS-06 Fresh Water Hydrophore 1
B DS-07
DS-08
Sewage Pump
1
B
Fuel Oil System
NO / SYMBOL EQUIPMENT QTY. INFORMATION
C
FO-11/12 HFO Booster Pump
CONTROL FO-13/14 HFO Circulating Pump 2
FO - 18
ROOM FO-15/16 HFO Final Heater 2
DS - 05
MDO Separator Feed
FO-17/18 2
CA - 03 CA - 04
Pump
FO-11/12 MDO Separator 2
D CO-06
CO-07
LT Standby Circuit
Pump
HT Standby Circuit
1
1
D
FO - 01 DS - 07 Pump
LO - 01 OW - 01 Preheater Circulating
OW - 02 CO-08 1
LO - 04 Pump
CO-09 Preheater Unit 1
E 40 25 20
E
35 30 15 10 5 AP -5 -10
ASWANIKUMBA
Container
I HULL MACH
Signed
Prepared by:
F ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004 F
ARRANGEMENT
Signed
(SECTIONAL VIEW) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS
1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System
UPPER PLATFORM
A LO-02
Standby Lubricating
Oil Pump
1 BL-03 Ballast Water Treatment 1
A
7,42 m
Lubricating Oil
LO-03 1 BG BL-01/02 Bilge-Ballast Pump 2
Separator Feed Pump
Lubricating Oil
TO SLUDGE TANK
LO-04 1 OW-01 Oil Water Pump 1
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1
Separator
Starting Air
CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
Compressor
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve
DS-06 Fresh Water Hydrophore 1
FO - 18
DS-07 1
FO - 17
HFO Sewage Pump
B HFO
SERVCE
TANK
SETTLING
TANK
DS-08 Sewage Treatment Plant 1
B
FO - 19
21,12 m³ 38,52 m³ Fuel Oil System
CA - 04
FO - 20
NO / SYMBOL EQUIPMENT QTY. INFORMATION
platform
lower
TANK FO-07/08 Preheater Separator 2
to
FO - 06
FO - 07
22,8 m³ FO-09/10 HFO Separator 2
FO - 08
C FO-15/16
FO-17/18
HFO Final Heater
MDO Separator Feed
2
2
C
Pump
FO-11/12 MDO Separator 2
platform
lower
FRESH Engine Cooling System
to
WATER NO / SYMBOL EQUIPMENT QTY. INFORMATION
TANK Sea Water Cooling
22,8 m³ CO-01/02
Pump
2
FO - 15
FO - 16
HT Standby Circuit
1
FO - 13 HFO HFO CO-07
Pump
D D
FO - 11
COLOR INDICATOR
TO SLUDGE TANK
SEA WATER LINE COMPRESSED AIR LINE
ASWANIKUMBA
Container
I HULL MACH
Signed
F ENGINE ROOM
Prepared by:
Jericho Hyansalem Wicaksono
5019201004
F
ARRANGEMENT
Signed
(PLATFORM PLAN) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS
1 2 3 4 5 6 7 8 9