0% found this document useful (0 votes)
21 views15 pages

A2 Uas

Uploaded by

Lucas Jericho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views15 pages

A2 Uas

Uploaded by

Lucas Jericho
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 15

1 2 3 4 5 6 7 8

CODE SYMBOL NAME QTY SPEC


CO-ST Strainer 2

CO-BV Butterfly Valve 32

A CO-NRV Non Return Valve 12


A
O/B (P/S) CO-TVR Temperature Valve Control 4
PI
CO-PI Pressure Indicator 6
TI
CO-TI Temperature Indicator 0

CO-SB Suction Bellmouth 1

CO-LAH LAH Level Alarm High 0

CO-LAL LAL Level Alarm Low 0

CO-SV Safety Valve 3


Expansion Tank
B (2 m³) CO-HE Heat Exchanger 7 B
CO-FXP Flexible Pipe 7

CO-GV Gate Valve 0

CO-COP Sea Water Pump 2 Q : 500 m³/hr

CO-COT Transfer Pump 1 Q : 30 m³/hr

CO-CPP Circulating Pump 2

C TI 75°C
CO - COS CO - COT C
TI (Sea Water Pump) (Transfer Pump)

Brand SILI PUMP Brand SILI PUMP

Type 200CL-30A Type 40-CLH-5


TE
Capacity 262 m³/hr Capacity 10 m³/hr

Head 23.5 m Head 30 m

TI RPM 2900 RPM 2900


HT-Water Outlet T
Power 30 kW Power 2.2 kW
91°C

TI TI

CO - COL CO - COH
D CENTRAL COOLER
(LT Stand-By Pump) (HT Stand-By Pump) D
HT-Water Drain Brand SILI PUMP Brand SILI PUMP

Type 125CLZ-12 Type 125CLZ-12


LT-Water from
Engine Driven Pump Water from pre-heater Capacity 160 m³/hr Capacity 160 m³/hr
to HT-Cricuit
Head 53 m Head 53 m

RPM 2900 RPM 2900


Additive
38°C
Dosing Tank Power 21.3 kW Power 21.3 kW

LT-Water Inlet HT-Water Inlet T


35°C 75°C
TI
CO - PU CO - PUP
PI

(Preheating Unit) (Preheating Circulating Pump)

E
PREHEATING UNIT
O/B (S/B) Brand ALFA LAVAL Brand SILI PUMP
E
PI

Type AALBORG EH-W15 Type 50CLZH-7A

Capacity 72 kW Capacity 18 m³/hr

TI El. Length 1200 m Head 25 m

PI No. Element 12 RPM 2900

Power 3 kW

COOLER
TI PI
PI

TI

F PI F
TI
High
S/C
CIRCULATING PUMP
Low
S/C

PI PI
Drain Tank
G (1.7 m³) G

PI PI

DEPARTMENT OF MARINE ENGINEERING - ITS


SEA WATER PUMP PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

Lpp 125.98 m MV. ASWANIKUMBA


Container
Lwl 132.28 m
100A1
Low B 19.73 m
Prepared by:
Signed

H S/C H 10.23 m
Keyplan of Engine
Jericho Hyansalem Wicaksono
5019201004
H
T 7.42 m
High Cooling System Approved by: Signed
Cb 0.616 Ir. Hari Prastowo, M.Sc.
S/C 196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Type Container 06 - 5019 23 HP004 - CO NTS 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8
CODE SYMBOL NAME QTY
CA-AF Air Filter 1

CA-PI PI Pressure Indicator 7


CA-BV-01

A To FO Mixing Tank CA-SV Safety Valve 3


A
CA-ASV Angle Safety Valve 2
CA-BV-02
CA-SV-01
To Pneumatic Ship Control Syst CA-BV Butterfly Valve 16
PI
CA-BV-03 CA-NRV-01 CA-DV Drain Valve (Solenoid) 4
CA-RDR-01 CA-BV-14
To A/E Control Syst CA-OWS Oil and Water Separator 4

CA-BV-04 CA-EM Electric Motor 2

To M/E Control Syst Max 10 bar Control System


CA-HE Heat Exchanger/Cooler 2

CA-FXP Flexible Pipe 1


CA-SV-02

B CA-BV-05
PI CA-RDR Reducer 4 B
To LO Filter CA-NRV-02
CA-RDR-02 CA-BV-13 CA-GV Gate Valve 5

CA-BV-06 CA-NRV Non Return Valve 9


To FO Filter Max 8 bar Automatic Filter System
CA-OWS-04

CA-BV-07

To Hydrophore CA - CPR CA - ARR


(Compressor) (Air Receiver)
CA-DV-04
CA-BV-08 Brand KAESER Brand KAESER

To Workshop Drain Type K 175-2-G/H35 Type Vertical

C Capacity 175 l/min or 10.5 m3/h Capacity 2000 liter


C
CA-BV-09 CA-SV-03 Pressure 35 bar (Max working pressure) Pressure 47 bar
To Horn Weight 60 kg Weight 1450 kg
PI
CA-NRV-03 Power 2.2 kW Quantity 2 Units
CA-BV-10 CA-RDR-04 CA-BV-12

To Seachest Quantity 2 Units

CA-BV-11 Max 4 bar General System


To Deck and E/R

D D

CA-ASV-01 CA-ASV-02
CA-GV-02 CA-GV-04
CA-NRV-04 CA-NRV-06 CA-CPR-01 CA-HE-01 CA-CPR-02
PI PI CA-OWS-02 CA-HE-02 CA-OWS-03 CA-NRV-09
CA-NRV-08
CA-GV-03 CA-GV-05
CA-NRV-05 CA-NRV-07

PI PI
CA-DV-02 CA-DV-03

E Drain Drain E
WÄRTSILÄ
2000 L
7L46F 2000 L
CA-ARR-01 CA-ARR-02

8400 kW

F F

CA-BV-15 CA-BV-16

TO DRAIN TO DRAIN

G G

CA-FXP-01
DEPARTMENT OF MARINE ENGINEERING - ITS
PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

Lpp 125.98 m MV. ASWANIKUMBA


CA-AF-01 Container
Lwl 132.28 m
CA-OWS-01 100A1
B 19.73 m Signed
Prepared by:
H CA-GV-01
H 10.23 m
Keyplan of Compressed
Jericho Hyansalem Wicaksono
5019201004
H
T 7.42 m
Air System Approved by: Signed
Cb 0.616 Ir. Hari Prastowo, M.Sc.
CA-DV-01 196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Drain Type Container 07 - 5019 23 HP004 - FO NTS 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

C C

LO - 01

LO - 02
LO - 03

OW - 02 LO - 04 FO - 02 FO - 01
LO - 05
FO - 04 FO - 03

FI - 01 CA - 01
OW - 01
DS - 07 DS - 08 FI - 02

deck
top
to
Sewage Treatment
Plant

CA - 02

CA - 04 CA - 03

BG BL - 01

CA - 05

BG BL - 02
CO - 01

lower
deck
D D

tank
to

top

to
CO - 09

CO - 04

CO - 03
CO - 06
CO - 05
CO - 08
CO - 06 CO - 02
CO - 07 DS - 02

Dosing CO - 10
DS - 03
Tank
DS - 01
Drain
Tank

E E

-10 -5 AP 5 10 15 20 25 30 35 -10 -5 AP 5 10 15 20 25 30 35

F F

G G

DEPARTMENT OF MARINE ENGINEERING - ITS


PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

Lpp 125.98 m MV. ASWANIKUMBA


Container
Lwl 132.28 m
100A1
B 19.73 m Signed
Prepared by:
H 10.23 m ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004
H T 7.42 m AIR VENTILATION Signed
H
Approved by:
Cb 0.616 SYSTEM Ir. Hari Prastowo, M.Sc.
196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Type Container 11 - 5019 23 HP004 - VA NTS 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B

C C
FO - 18
FO - 17
HFO HFO
SERVCE SETTLING
TANK TANK
ENGINE FO - 19
21,12 m³ 38,52 m³
CA - 04
CONTROL
ROOM FO - 20

DS - 05

FO - 05

FRESH
WATER

platform
lower
TANK

to
FO - 06
FO - 07
22,8 m³
FO - 08

D UP
to
main
deck
D

platform
lower
FRESH

to
WATER
TANK
22,8 m³
DS - 06

WORKSHOP
LAMP

FO - 15

FO - 16
STORE FO - 13
FO - 11
HFO HFO
SERVCE SETTLING
FO - 14
TANK TANK
E E
FO - 11

21,12 m³ 38,52 m³

F F
-10 -5 AP 5 10 15 20 25 30 35

G G

DEPARTMENT OF MARINE ENGINEERING - ITS


PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

Lpp 125.98 m MV. ASWANIKUMBA


Container
Lwl 132.28 m
100A1
B 19.73 m Signed
Prepared by:
H 10.23 m ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004
H T 7.42 m AIR VENTILATION Signed
H
Approved by:
Cb 0.616 SYSTEM Ir. Hari Prastowo, M.Sc.
196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Type Container 11 - 5019 23 HP004 - VA NTS 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

B B
DS - 06

WORKSHOP LAMP
STORE
FO - 14 FO - 12

FO - 15 FO -16

C DS - 03 CO - 02
C
CO - 10
DS - 01
CO - 04
CO - 08

-10 -5 AP 5 10 15 20 25 30 35 40
D D

E E
ENGINE
CONTROL
FO - 18
ROOM
DS - 05

CA - 03 CA - 04

CA - 02

BL - 01

F F
FO - 01 DS - 07
LO - 01 OW - 01
OW - 02
LO - 04

40 35 30 25 20 15 10 5 AP -5 -10
G G

DEPARTMENT OF MARINE ENGINEERING - ITS


PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

Lpp 125.98 m MV. ASWANIKUMBA


Container
Lwl 132.28 m
100A1
B 19.73 m Signed
Prepared by:
H 10.23 m ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004
H T 7.42 m AIR VENTILATION Signed
H
Approved by:
Cb 0.616 SYSTEM Ir. Hari Prastowo, M.Sc.
196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Type Container 11 - 5019 23 HP004 - VA NTS 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System

CROSS SECTIONAL VIEW NO / SYMBOL

LO-01
EQUIPMENT

Pre Lubricating Oil


Pump
QTY.

1
INFORMATION NO / SYMBOL

FI-01/02
EQUIPMENT

Fire Pump
QTY.

2
INFORMATION

A LO-02

LO-03
Standby Lubricating
Oil Pump
Lubricating Oil
Separator Feed Pump
1

1
BL-03

BG BL-01/02
Ballast Water Treatment

Bilge-Ballast Pump
1

2
A
Lubricating Oil
1 OW-01 1

FROM FRAME 33 TO FORE


LO-04 Oil Water Pump
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1
Separator

Compressed Air System Domestic System


NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

Starting Air
CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
Compressor
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve

HFO HFO DS-06 Fresh Water Hydrophore 1

FO - 09 FO - 10 DS-07 1
SETTLING Sewage Pump

B TANK
FO - 05 FO - 06 FO - 07
FO - 08
SETTLING
TANK
DS-08 Sewage Treatment Plant 1
B
Fuel Oil System
NO / SYMBOL EQUIPMENT QTY. INFORMATION

MDO MDO FO-01/02 HFO Transfer Pump 2

SETTLING SETTLING FO-03/04 MDO Transfer Pump


HFO Separator Feed
2

FO-05/06 2
TANK TANK Pump
Preheater Separator 2
FO-07/08

FO-09/10 HFO Separator 2

FI- 01 FI - 02 BG BL - 01 BG BL - 02 FO-11/12 HFO Booster Pump 2


CO - 01 CO - 02

FO-13/14 HFO Circulating Pump 2

C FO-15/16

FO-17/18
HFO Final Heater
MDO Separator Feed
2

2
C
Pump
FO-11/12 MDO Separator 2

Engine Cooling System


NO / SYMBOL EQUIPMENT QTY. INFORMATION

Sea Water Cooling


CO-01/02 2
Pump
CO-03/04 Central Cooler 2

CO-05 Air Venting Unit 1


LT Standby Circuit
CO-06 1
Pump

FROM FRAME 20 TO AFTER CO-07


HT Standby Circuit
Pump
1

D CO-08

CO-09
Preheater Circulating
Pump
Preheater Unit
1

1
D
CO-10 Transfer Pump 1

ENGINE COLOR INDICATOR


CONTROL WAREHOUSE SEA WATER LINE COMPRESSED AIR LINE

ROOM COOLING WATER LINE FIRE FIGHTING LINE

HEAVY FUEL OIL LINE SLUDGE OIL LINE

E MARINE DIESEL OIL LINE SEWAGE LINE E


FRESH WATER LINE
LUBRICATING OIL LINE

PRINCIPAL DIMENSION DEPARTMENT OF MARINE ENGINEERING - ITS


DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
Lpp 125.98 m ODD SEMESTER 2023/2024

DS - 07
Lwl 132.28 m ASWANIKUMBA
B 19.73 m Container
H 10.23 m I HULL MACH

T Signed
7.42 m
F Cb 0.616 ENGINE ROOM
Prepared by:
Jericho Hyansalem Wicaksono
5019201004
F
Vs 18.5 Knot ARRANGEMENT
Type Container (CROSS SECTIONAL Approved by: Signed
Ir. Hari Prastowo, M.Sc.
VIEW) 196510301991021001
Dwg no. Date Scale Rev.
NTS

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8

A A
Lavatory

Lavatory

Navigation
Deck

Lavatory Lavatory

B B
Deck E

Lavatory Lavatory

Deck D
C C
Lavatory Lavatory Lavatory Lavatory Lavatory

Deck C

Lavatory Lavatory Lavatory Lavatory Lavatory Laundry


Room

D D
Deck B

Lavatory Lavatory Lavatory Lavatory Lavatory


COLOR INDICATOR
Black Water
Deck A
DS - ISC - 01
E Grey Water E
Lavatory Lavatory Lavatory Lavatory Lavatory Clinic Clinic
Lavatory Lavatory

International
Shore
Connection
Main Deck
CODE EQUIPMENT SYMBOL QTY
DS-BM BELL MOUNTED 1
DS-PMP BLACK WATER PUMP 1
F DS-OB OVERBOARD 2
F
DS-OB DS-OB DS-BV BUTTERFLY VALVE 1
DS-PI PRESSURE INDICATOR PI 2
DS-ISC INTERNATIONAL SHORE CONECTION 2
Black Water DS-STR STRAINER 2
DS - STR - 02 Tank DS-GT GATE VALVE 1
DS-SV SAFETY VALVE 1
DS - GT - 01

DS - BM - 01

G G
Sewage
Treatment
Plant
DEPARTMENT OF MARINE ENGINEERING - ITS
PI
DS - SV - 01
PI PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024
DS - BV - 01 DS - GT - 02
Lpp 125.98 m MV. ASWANIKUMBA
DS - PI - 02 DS - PI - 01 Container
Black Water
DS - STR - 01 Lwl 132.28 m
100A1
Pump
DS - PMP - 01 B 19.73 m Signed
Prepared by:
H H 10.23 m Keyplan of Domestic Jericho Hyansalem Wicaksono
5019201004
H
Double Bottom T 7.42 m System (Sanitary
Approved by: Signed
Cb 0.616 Discharge) Ir. Hari Prastowo, M.Sc.
196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Type Container 08 - 5019 23 HP004 - CO NTS 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8

A A

Lavatory

Lavatory

Navigation
Deck
Lavatory Lavatory

B B

Deck E

Lavatory Lavatory

Deck D
C C
Lavatory Lavatory Lavatory Lavatory Lavatory

Deck C

Lavatory Lavatory Lavatory Lavatory Lavatory Laundry


Room

D D
Deck B

Lavatory Lavatory Lavatory Lavatory Lavatory


COLOR INDICATOR
Sea Water
Deck A

E Fresh Water E
Lavatory Lavatory Lavatory Lavatory Lavatory Clinic Clinic
Lavatory Lavatory

CODE EQUIPMENT SYMBOL QTY


DS - PI - 08 DS - PI - 07
Main Deck
DS-BM BELL MOUNTED 1
PI DS - SV - 04 PI
LAH

DS - BV - 09 DS - NRV - 10
DS-PMP BLACK WATER PUMP 1
DS - GT - 01
FRESH WATER TANK DS-OB OVERBOARD 2
22,8 m3
DS - STR - 07 Fresh Water DS-BV BUTTERFLY VALVE 1
LAL
Supply Pump DS - BV - 07
F SS-PMP-03
DS - PI - 06 DS - PI - 05
DS-PI PRESSURE INDICATOR PI 2 F
Fresh Water
LAH
PI DS - SV - 03 PI Hydrophore
DS-STR STRAINER 2
DS - NRV - 08
DS - BV - 08 DS-GT GATE VALVE 1
FRESH WATER TANK
22,8 m3 DS - GT - 02
DS-SV SAFETY VALVE 1
DS - STR - 06 DS - NRV - 09 DS - HDF - 01
SS-PMP-04
LAL
Fresh Water Supply
DS-HDF FRESH WATER HYDROPHORE 2
Stand-by Pump
DS-NRV NON RETURN VALVE 7
DS-LSC LOW SEA CHEST 2
DS - STR - 04 Second DeckDS - NRV - 07 DS - BV - 06 DS-SC HIGH SEA CHEST 2
DS - SC - 03
DS - SC - 04 High Sea Chest
High Sea Chest
DS-LSC HIGH LEVEL ALARM LAH 2
PI DS - SV - 02
G DS - BV - 05 DS - NRV - 06

DS - PI - 04
PI DS - STR - 05
DS-SC LOW LEVEL ALARM LAL
2 G
DS - HDS - 01
DS - PI - 03
DS - NRV - 03 Sea Water
Supply Pump DS - BV - 02

Sea Water DS - PMP - 02


Hydrophore PI DS - SV - 01 PI
DS - BV - 03
DS - PI - 02
DS - STR - 03 DEPARTMENT OF MARINE ENGINEERING - ITS
PRINCIPAL DIMENSION DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024
DS - PI - 01
DS - NRV - 04 DS - NRV - 02
DS - PMP - 01
Lpp 125.98 m MV. ASWANIKUMBA
DS-BV-04 DS-NRV-05 Sea Water DS - NRV - 01 DS - BV - 01 Container
Supply Lwl 132.28 m
DS - LSC - 02
Stand-by Pump 100A1
Low Sea Chest
DS - LSC - 01
Low Sea Chest
B 19.73 m Signed
DS-STR-02 DS - STR - 01 Prepared by:
H H 10.23 m Keyplan of Domestic Jericho Hyansalem Wicaksono
5019201004
H
T 7.42 m System (FW + SW
Double Bottom Approved by: Signed
Cb 0.616 Supply) Ir. Hari Prastowo, M.Sc.
196510301991021001
Vs 18.5 Knot
Dwg no. Date Scale Rev.
Type Container 08 - 5019 23 HP004 - CO NTS 01

1 2 3 4 5 6 7 8
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System
NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

A TANK TOP VIEW LO-01

LO-02
Pre Lubricating Oil
Pump
Standby Lubricating
Oil Pump
1

1
FI-01/02

BL-03
Fire Pump

Ballast Water Treatment


2

1
A
Lubricating Oil
LO-03 1 BG BL-01/02 Bilge-Ballast Pump 2
Separator Feed Pump
Lubricating Oil
LO-04 1 OW-01 Oil Water Pump 1
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1

TO SHORE CONNECTION
Separator
BILGE HOLDING TANK

TO HFO SETTLING
24,26M³

TO OVERBOARD
TO HFO SETTLING
Compressed Air System Domestic System

TO SHORE CONNECTION
NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

SEWAGE TANK Starting Air


SLUDGE TANK CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
15,67 m³ Compressor
9,6 m³
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve
DS-06 Fresh Water Hydrophore 1

B DS-07

DS-08
Sewage Pump

Sewage Treatment Plant


1

1
B
Fuel Oil System
NO / SYMBOL EQUIPMENT QTY. INFORMATION

LO - 01

LO - 02
LO - 03
FO-01/02 HFO Transfer Pump 2
OW - 02 LO - 04 FO - 02 FO - 01
LO - 05
FO - 04 FO - 03
TO HYDRANT FO-03/04 MDO Transfer Pump 2
HFO Separator Feed
FO-05/06 2
OW - 01 FI - 01 Pump
DS - 07 DS - 08 FI - 02
Sewage Treatment FO-07/08 Preheater Separator 2
Plant

FROM HFO STORAGE


FO-09/10 HFO Separator 2
FROM MDO STORAGE

C
2

C
FO-11/12 HFO Booster Pump

FROM BALLAST SYSTEM FO-13/14 HFO Circulating Pump 2

FO-15/16 HFO Final Heater 2


TO BALLAST SYSTEM
BG BL - 01 MDO Separator Feed
FO-17/18 2
Pump
FO-11/12 MDO Separator 2
BG BL - 02
FROM BILGE SYSTEM
CO - 01

lower
deck
Engine Cooling System

to
CO - 09
TO DOMESTIC SYSTEM NO / SYMBOL EQUIPMENT QTY. INFORMATION

CO - 04

CO - 03
CO - 06 Sea Water Cooling
CO - 05 CO-01/02 2
CO - 08
CO - 06 CO - 02
Pump
CO - 07 DS - 02
CO-03/04 Central Cooler 2
Dosing CO - 10
DS - 03 CO-05 Air Venting Unit 1
Tank

D Drain
Tank
DS - 01 CO-06

CO-07
LT Standby Circuit
Pump
HT Standby Circuit
1

1
D
Pump
Preheater Circulating
CO-08 1
Pump
CO-09 Preheater Unit 1

CO-10 Transfer Pump 1


TO EXPANSION TANK
COLOR INDICATOR
SEA WATER LINE COMPRESSED AIR LINE

TO OVERBOARD
SEWAGE TANK COOLING WATER LINE FIRE FIGHTING LINE
15,67 m³
HEAVY FUEL OIL LINE SLUDGE OIL LINE

E BILGE HOLDING TANK MARINE DIESEL OIL LINE SEWAGE LINE E


24,26M³
FRESH WATER LINE
LUBRICATING OIL LINE

DEPARTMENT OF MARINE ENGINEERING - ITS


DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
-10 -5 AP 5 10 15 20 25 30 35 ODD SEMESTER 2023/2024

ASWANIKUMBA
Container
I HULL MACH
Signed
Prepared by:
F ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004 F
ARRANGEMENT
Signed
(TANK TOP PLAN) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System
NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

A FROM CL TO PORT SIDE LO-01

LO-02
Pre Lubricating Oil
Pump
Standby Lubricating
Oil Pump
1

1
FI-01/02

BL-03
Fire Pump

Ballast Water Treatment


2

1
A
Lubricating Oil
LO-03 1 BG BL-01/02 Bilge-Ballast Pump 2
Separator Feed Pump
Lubricating Oil
LO-04 1 OW-01 Oil Water Pump 1
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1
Separator

Compressed Air System Domestic System


NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

Starting Air
CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
Compressor
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve
DS-06 Fresh Water Hydrophore 1

B DS-07

DS-08
Sewage Pump

Sewage Treatment Plant


1

1
B
Fuel Oil System
NO / SYMBOL EQUIPMENT QTY. INFORMATION

FO-01/02 HFO Transfer Pump 2

FO-03/04 MDO Transfer Pump 2


HFO Separator Feed
FO-05/06 2
Pump
FO-07/08 Preheater Separator 2

FO-09/10 HFO Separator 2

C
2

C
FO-11/12 HFO Booster Pump

DS - 06 FO-13/14 HFO Circulating Pump 2

FO-15/16 HFO Final Heater 2


MDO Separator Feed
FO-17/18 2
FO - 14 FO - 12 Pump
FO - 15 FO -16 FO-11/12 MDO Separator 2

Engine Cooling System


NO / SYMBOL EQUIPMENT QTY. INFORMATION

Sea Water Cooling


CO-01/02 2
Pump
CO-03/04 Central Cooler 2

CO-05 Air Venting Unit 1

D DS - 03
CO-06

CO-07
LT Standby Circuit
Pump
HT Standby Circuit
1

1
D
CO - 02 Pump
Preheater Circulating
CO-08 1
Pump
CO - 10
DS - 01 CO-09 Preheater Unit 1
CO - 04
CO - 08
CO-10 Transfer Pump 1

E E
-10 -5 AP 5 10 15 20 25 30 35 40
DEPARTMENT OF MARINE ENGINEERING - ITS
DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

ASWANIKUMBA
Container
I HULL MACH
Signed
Prepared by:
F ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004
F
ARRANGEMENT
Signed
(SECTIONAL VIEW) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9

LOWER PLATFORM
A A
4,58 m

B Lubricating Oil System B


NO / SYMBOL EQUIPMENT QTY. INFORMATION

Pre Lubricating Oil


LO-01 1
Pump
Standby Lubricating
LO-02 1
Oil Pump
Lubricating Oil
LO-03 1
Separator Feed Pump
Lubricating Oil
LO-04 1
Preheater Separator
Lubricating Oil
LO-05 1
Separator

Compressed Air System


CA - 01
NO / SYMBOL EQUIPMENT QTY. INFORMATION

deck
C C

top
to
Starting Air
CA-01/02 2
Compressor
CA - 02 CA-03/04 Starting Air Vessel 2

CA - 04 Pressure Reducing 1
CA - 03 CA-05
Valve

CA - 05

tank
top

to
D D
TO PNEUMATIC SYSTEM

TO GENERAL SERVICE

COLOR INDICATOR
SEA WATER LINE COMPRESSED AIR LINE

COOLING WATER LINE FIRE FIGHTING LINE

HEAVY FUEL OIL LINE SLUDGE OIL LINE

E MARINE DIESEL OIL LINE SEWAGE LINE E


FRESH WATER LINE
LUBRICATING OIL LINE

DEPARTMENT OF MARINE ENGINEERING - ITS


-10 -5 AP 5 10 15 20 25 30 35 DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

ASWANIKUMBA
Container
I HULL MACH
Signed

F ENGINE ROOM
Prepared by:
Jericho Hyansalem Wicaksono
5019201004
F
ARRANGEMENT
Signed
(PLATFORM PLAN) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System
NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

A FROM CL TO STARBOARD SIDE LO-01

LO-02
Pre Lubricating Oil
Pump
Standby Lubricating
Oil Pump
1

1
FI-01/02

BL-03
Fire Pump

Ballast Water Treatment


2

1
A
Lubricating Oil
LO-03 1 BG BL-01/02 Bilge-Ballast Pump 2
Separator Feed Pump
Lubricating Oil
LO-04 1 OW-01 Oil Water Pump 1
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1
Separator

Compressed Air System Domestic System


NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

Starting Air
CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
Compressor
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve
DS-06 Fresh Water Hydrophore 1

B DS-07

DS-08
Sewage Pump

Sewage Treatment Plant


1

1
B
Fuel Oil System
NO / SYMBOL EQUIPMENT QTY. INFORMATION

FO-01/02 HFO Transfer Pump 2

FO-03/04 MDO Transfer Pump 2


HFO Separator Feed
FO-05/06 2
Pump
FO-07/08 Preheater Separator 2

FO-09/10 HFO Separator 2


ENGINE
C
2

C
FO-11/12 HFO Booster Pump
CONTROL FO-13/14 HFO Circulating Pump 2
FO - 18
ROOM FO-15/16 HFO Final Heater 2
DS - 05
MDO Separator Feed
FO-17/18 2
CA - 03 CA - 04
Pump
FO-11/12 MDO Separator 2

Engine Cooling System


CA - 02
NO / SYMBOL EQUIPMENT QTY. INFORMATION

Sea Water Cooling


CO-01/02 2
Pump
CO-03/04 Central Cooler 2

CO-05 Air Venting Unit 1


BL - 01

D CO-06

CO-07
LT Standby Circuit
Pump
HT Standby Circuit
1

1
D
FO - 01 DS - 07 Pump
LO - 01 OW - 01 Preheater Circulating
OW - 02 CO-08 1
LO - 04 Pump
CO-09 Preheater Unit 1

CO-10 Transfer Pump 1

E 40 25 20
E
35 30 15 10 5 AP -5 -10

DEPARTMENT OF MARINE ENGINEERING - ITS


DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

ASWANIKUMBA
Container
I HULL MACH
Signed
Prepared by:
F ENGINE ROOM Jericho Hyansalem Wicaksono
5019201004 F
ARRANGEMENT
Signed
(SECTIONAL VIEW) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS

1 2 3 4 5 6 7 8 9
1 2 3 4 5 6 7 8 9
Lubricating Oil System Ballast,Bilge,Fire Main and OWS System

UPPER PLATFORM

FROM MDO SERVICE TANK


NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

Pre Lubricating Oil


LO-01 1 FI-01/02 Fire Pump 2
Pump

A LO-02
Standby Lubricating
Oil Pump
1 BL-03 Ballast Water Treatment 1
A
7,42 m
Lubricating Oil
LO-03 1 BG BL-01/02 Bilge-Ballast Pump 2
Separator Feed Pump
Lubricating Oil

TO SLUDGE TANK
LO-04 1 OW-01 Oil Water Pump 1
Preheater Separator
Lubricating Oil
LO-05 1 OW-02 Oily Water Separator 1
Separator

Compressed Air System Domestic System


NO / SYMBOL EQUIPMENT QTY. INFORMATION NO / SYMBOL EQUIPMENT QTY. INFORMATION

Starting Air
CA-01/02 2 DS-01/02 Sea Water Supply Pump 2
Compressor
CA-03/04 Starting Air Vessel 2 DS-03 Sea Water Hydrophore 1
Pressure Reducing 1 2
CA-05 DS-04/05 Fresh Water Supply Pump
Valve
DS-06 Fresh Water Hydrophore 1
FO - 18
DS-07 1
FO - 17
HFO Sewage Pump

B HFO
SERVCE
TANK
SETTLING
TANK
DS-08 Sewage Treatment Plant 1
B
FO - 19
21,12 m³ 38,52 m³ Fuel Oil System
CA - 04
FO - 20
NO / SYMBOL EQUIPMENT QTY. INFORMATION

DS - 05 FO-01/02 HFO Transfer Pump 2


FO - 05
FO-03/04 MDO Transfer Pump 2
FRESH FO-05/06
HFO Separator Feed
2
WATER Pump

platform
lower
TANK FO-07/08 Preheater Separator 2

to
FO - 06
FO - 07
22,8 m³ FO-09/10 HFO Separator 2
FO - 08

to FO-11/12 HFO Booster Pump 2


main
FO-13/14 HFO Circulating Pump 2
UP deck

C FO-15/16

FO-17/18
HFO Final Heater
MDO Separator Feed
2

2
C
Pump
FO-11/12 MDO Separator 2

platform
lower
FRESH Engine Cooling System

to
WATER NO / SYMBOL EQUIPMENT QTY. INFORMATION
TANK Sea Water Cooling
22,8 m³ CO-01/02
Pump
2

DS - 06 CO-03/04 Central Cooler 2

CO-05 Air Venting Unit 1


LT Standby Circuit
CO-06 1
Pump

FO - 15

FO - 16
HT Standby Circuit
1
FO - 13 HFO HFO CO-07
Pump

D D
FO - 11

SERVCE SETTLING CO-08


Preheater Circulating
Pump
1
FO - 14
FO - 11 TANK TANK CO-09 Preheater Unit 1
21,12 m³ 38,52 m³
CO-10 Transfer Pump 1
TO DOMESTYC SYSTEM

COLOR INDICATOR

TO SLUDGE TANK
SEA WATER LINE COMPRESSED AIR LINE

COOLING WATER LINE FIRE FIGHTING LINE

HEAVY FUEL OIL LINE SLUDGE OIL LINE

E MARINE DIESEL OIL LINE SEWAGE LINE E


FRESH WATER LINE
LUBRICATING OIL LINE

-10 -5 AP 5 10 15 20 25 30 35 DEPARTMENT OF MARINE ENGINEERING - ITS


DESAIN IV - MACHINERY AND ELECTRICAL SYSTEM
ODD SEMESTER 2023/2024

ASWANIKUMBA
Container
I HULL MACH
Signed

F ENGINE ROOM
Prepared by:
Jericho Hyansalem Wicaksono
5019201004
F
ARRANGEMENT
Signed
(PLATFORM PLAN) Approved by:
Ir. Hari Prastowo, M.Sc.
196510301991021001
Dwg no. Date Scale Rev.
NTS

1 2 3 4 5 6 7 8 9