0% found this document useful (0 votes)
6 views

Project-Update-Shoreline-ph2

Uploaded by

Gerry Baldomero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

Project-Update-Shoreline-ph2

Uploaded by

Gerry Baldomero
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Shoreline Protection Phase 2A (40Meters)

MINKONSTRAK ENGINEERING & GENERAL SERVICES


FV BALDOMERO Project Start:
Mon, 10/30/2023

Fri, 4/12/2024
Project Completion:
1 Oct 30, 2023 Nov 6, 2023 Nov 13, 2023 Nov 20, 2023 Nov 27, 2023 Dec 4, 2023 Dec 11, 2023 Dec 18, 2023 Dec 25, 2023 Jan 1, 2024 Jan 8, 2024 Jan 15, 2024 Jan 22, 2024 Jan 29, 2024 Feb 5, 2024 Feb 12, 2024 Feb 19, 2024 Feb 26, 2024 Mar 4, 2024 Mar 11, 2024 Mar 18, 2024 Mar 25, 2024 Apr 1, 2024 Apr 8, 2024
Display Week:
30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 1 2 3 4 5 6 7 8 9 10 11 12
DURATION
TASK PROGRESS START END M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F S S M T W T F
(DAYS)

MOBILIZATION WORKS

Mobilization of Backhoe 1 100% 10/30/23 10/31/23

Mobilization of Sheet Piles 30 100% 11/1/23 11/30/23

Mobilization of Rebars 120 10% 11/20/23 3/18/24

Mobilization of Formworks 80 0% 11/27/23 2/14/24

MAJOR WORKS

Excavation Works for Sheet Pile Elev. 10 100% 10/26/23 11/5/23

Instalaltion of Sheetpile 10 100% 11/6/23 11/15/23

Excavation for Sheetpile Concrete elev. 0 - 20m 8 100% 11/16/23 11/23/23

Rebars for Sheetpile Foundation 8 0% 11/24/23 12/1/23

Formworks for Sheetpile Foundation 6 0% 12/2/23 12/7/23

Concrete Pouring for Sheetpile Foudnation 1 0% 12/8/23 12/8/23

Excavation for Sheetpile Concrete elev. 20m - 40m 8 0% 12/9/23 12/16/23

Rebars for Sheetpile Foundation 8 0% 12/17/23 12/24/23

Formworks for Sheetpile Foundation 6 0% 12/25/23 12/30/23

Concrete Pouring for Sheetpile Foudnation 1 0% 12/31/23 12/31/23

Backfill works sheetpile foundation 0 - 40m 7 0% 1/1/24 1/7/24

Rebar works for Seawall footing 0 - 20m 8 0% 1/8/24 1/15/24

Formworks for Seawall footing 0-20m 6 0% 1/16/24 1/21/24

Concrete pouring for seawall foundation 0-20m 1 0% 1/22/24 1/22/24

Rebar works for Seawall footing 20 - 40m 8 0% 1/23/24 1/30/24

Formworks for Seawall footing 20-40m 6 0% 1/31/24 2/5/24

Concrete pouring for seawall foundation 20-40m 1 0% 2/6/24 2/6/24

Backfill works seawall foundation 0-40m 7 0% 2/7/24 2/13/24

Rebar works for Seawall 0 - 20m 8 0% 2/14/24 2/21/24

Formworks for Seawall 0-20m 6 0% 2/22/24 2/27/24

Concrete pouring for seawall 0-20m 1 0% 2/28/24 2/28/24

Rebar works for Seawall 20 - 40m 8 0% 2/29/24 3/7/24

Formworks for Seawall 20-40m 6 0% 3/8/24 3/13/24

Concrete pouring for seawall 20-40m 1 0% 3/14/24 3/14/24

Backfill works seawall 0-40m 5 0% 3/15/24 3/19/24

Rebar works for Seawall crown and tension beams,


14 0% 3/20/24 4/2/24
0-40m
Formworks for Seawall 0 - 40m 9 0% 4/3/24 4/11/24

Concrete pouring for seawall 0-40m 1 0% 4/12/24 4/12/24

This is an empty row


Insert new rows ABOVE this one

Prepared by:

Fred Vincent S. Baldomero


Project Engineer