Dear Sirs,
You are instructed to proceed with the following as described below in accordance with all the
Terms and Conditions set forth in the Contract stated above.
Subject: Addition DB Panel for Private Residence L31 to L36
Location: L31 to L36
Description: Refer to EXM MEP designer of Private Residence L31 – L36 requested for main electrical 3P 80A for
each floor and NLP approved;
MTL-MEP revised the load schedule to coverage the requirement from EXM by modify existing
31DB1 Panel and addition new 33DB1 Panel as listed below.
for Private Residence L34, L35, L36 & kitchen exhaust fan at roof top (ACMCC-F/34-01, F/35-01,
F/36-01).
2. Addition the new 33DB1 Panel following the update load schedule from MTL for Private
Residence L34, L35, L36 & kitchen exhaust fan at roof top (ACMCC-F/34-01, F/35-01, F/36-01).
3. Install main power feeder for 33DB1 Panel (4 x 185, G1 x 25, IEC01 in dia. 80mm. Flex).
4. Main power feeder for 31DB1 panel and 33DB1 panel connected from existing main plug-in 3P
250A for both panels.
TOC is instructed to proceed with the construction using the given information.
Attachments: - “20240619_Load schedule for 31DB1&33DB1.pdf” from MTL issued of June 19, 2024.
- E-mail log – ANL Residence L31-L36 : Electrical drawing - Cost Estimate for addition DB Panel
at L31 for Private Residence L31-L36: email coordination of July 3, 2024.
Remarks:
Name: Name:
Signed on behalf of the Project Manager Signed on behalf of the Contractor
Meinhardt (Thailand) Ltd. GENERAL FORM 603
PROJECT : NAI LERT PARK, HOTEL AND RESIDENCE, BANGKOK INITIAL : KHC DATE : 19/06/2024
PROJECT NO. : MT2319/2 REVISION : B PAGE NO. : 24
PROJECT : NAI LERT PARK, HOTEL AND RESIDENCE, BANGKOK INITIAL : KHC DATE : 19/06/2024
PROJECT NO. : MT2319/2 REVISION : - PAGE NO. :
Dear K. Tookta,
To help
protect your
privacy ,
Micro so ft
Office
prevented
Best regards,
Kraidej
Regards,
Please confirm for the update 31DB1 & 33DB1 panel from MTL.
31DB1 panel - for L31,L32,L33 & kitchen exhaust fans at roof top (ACMCC-F/31-01, F/32-01, F/33-01)
33DB1 panel - for L34,L35,L36 & kitchen exhaust fans at roof top (ACMCC-F/34-01, F/35-01, F/36-01)
Best regards,
1
Kraidej Pringprerdprurnt
Archetype Thailand
Please confirm for the update 31DB1 & 33DB1 panel from MTL as attached to go ahead.
31DB1 panel - for L31,L32,L33 & kitchen exhaust fan at roof top (ACMCC-F/31-01, F/32-01, F/33-01)
2
33DB1 panel - for L34,L35,L36 & kitchen exhaust fan at roof top (ACMCC-F/34-01, F/35-01, F/36-01)
3
Looking forward to your confirmation.
Best regards,
Kraidej Pringprerdprurnt
4
From: Khwunchai Bootthai <[email protected]>
Sent: Wednesday, June 19, 2024 5:36 PM
To: Kraidej Pringprerdprurnt <[email protected]>;
[email protected] <[email protected]>; Chaisit Nimmalairat <[email protected]>
Cc: ANL-team <[email protected]>; Yanin Kotiboonlo <[email protected]>; Ratana
<[email protected]>; Kunyarutn Munprasit <[email protected]>; mt2319
<[email protected]>; Arkom Klongdee <[email protected]>; Stuart Dugard
<[email protected]>; Ariel Sardou <[email protected]>; Christophe Chastagner
<[email protected]>; Aurélien Souverain <[email protected]>;
Nipon Jaito <[email protected]>; Putchong (Nib) Ulitsatit <putchong.ulitsatit@archetype-
group.com>; Puttinon (Keng) Natesiw <[email protected]>; Prasyth (Tii) Pasunathpong
<[email protected]>
Subject: RE: ANL Residence L31-L36 : Electrical drawing - Cost Estimate for addition DB Panel at L31 for Private
Residence L31-L36
Please see the updated load schedule for 31DB1 and new panel for 33DB1 in attachment.
We design with the 80% demand factor and can use main plug-in 3P 250A for both panels.
Please note: Meinhardt assume load consumption for L33 same as L31.
Best regards,
Khwunchai Bootthai
Senior Electrical Engineer I Meinhardt Thailand
Dear K. Khwunchai,
5
Please design the new DB panel for L31-L36 with the 80% demand factor from EXM that our main plug-
in 3P 250A shall be upsize to following the load schedule from EXM.
Pending the load schedule of L33 (L33 also requested main 3P 80A).
Best regards,
Kraidej Pringprerdprurnt
Archetype Thailand
Please see attached updated load schedule each floor (L31, L32, L34, L35, L36) that confirm to
request 3P, 80A.
Regards,
Please EXM submit the revise load schedule of (L31, L32, L33, L34, L35, L36) and demand factor to
us.
Best regards,
Kraidej Pringprerdprurnt
6
140/49-50, 22nd Floor, ITF Tower
Silom Road
Suriyawong, Bangrak
Bangkok, Thailand 10500
www.archetype-group.com
Please be informed that our MEP designer has reviewed and confirm as follow;
1. Please revise the new main MDB from 34th floor to 33th floor.
2. EXM recommend providing 3P-80A with digital meter for every floor (L31, L32, L33, L34, L35,
L36) that will come from main 31DB1 250A and revised main from 34DB1 to 33DB1.
Please let me know if you have any difficulty on the above requirement. Thank you.
--
Best regards,
Mr.Thayut Kanchanaporn
Director of Project Development
7
From: Kraidej Pringprerdprurnt <[email protected]>
Date: Friday, 7 June BE 2567 at 13:44
To: Thayut <[email protected]>, alexandre.b <[email protected]>, Frederic
Garnier <[email protected]>
Cc: ANL-team <[email protected]>, Ariel Sardou <[email protected]>,
Arkom Klongdee <[email protected]>, Aurélien Souverain
<[email protected]>, Christophe Chastagner
<[email protected]>, Kunyarutn Munprasit
<[email protected]>, Manutsawee Bovornsetthanan <[email protected]>,
mt2319 <[email protected]>, Nipon Jaito <[email protected]>, Prasyth
(Tii) Pasunathpong <[email protected]>, Ratana
<[email protected]>, Stuart Dugard <[email protected]>
Subject: Re: Fw: ANL Residence L31-L36 : Electrical drawing - Cost Estimate for addition DB
Panel at L31 for Private Residence L31-L36
Dear K. Ace,
Kindly remind that we are waiting the confirmation for addition DB Panel for Private Residence
(cost 400,000THB) details in this email below.
Best regards,
Kraidej Pringprerdprurnt
Archetype Thailand
8
Well received, I’m asking for the confirmation from the designer. Thank you.
--
Best regards,
Mr.Thayut Kanchanaporn
Director of Project Development
The cost for modification of existing DB Panel no. 31DB1 (3P 250AT) and addition new DB Panel
no. 34DB1 (3P 250AT) for Private Residence (following load schedule from MEP designer of L31 to
L36) .
Scope of work:
1. The existing DB Panel no. 31DB1 shall be modify to support Private Residence L31-L33 (following
load schedule from MEP designer of L31 to L33) and addition new CB 3P 50AT with Digital Meter
3P (existing meter is 1P) for L31, new CB 3P 80AT with Digital Meter for L32 and new CB 3P 50AT
with Digital Meter for L33.
2. Addition DB Panel no. 34DB1 (same spec as 31DB1) with main 3P 250AT , CB 3P 50AT for L34 , CB
3P 100AT for L35 and CB 3P 50AT for L36 with new Digital Meter (following load schedule from
MEP designer of L34 to L36) .
3. Main feeder of 34DB1 (new) plug in to the same feeder busduct of 31DB1.
4. Relocated CB 3P for kitchen exhaust fan AMCC-F/34-01, F/35-01 & F/36-01 from 31DB1 (existing)
to 34DB1 (new).
Best regards,
Kraidej Pringprerdprurnt
10
Dear Khun Ace,
Is the below fine for you ? I guess you may want to check with your MEP engineer to confirm.
Khun Kraidej,
I guess if you want khun Ace to approve this, he will need a cost estimate as well.
Thank you
Kind Regards,
Alexandre Bystrzejewski
Managing Director
Refer to the load schedule of Private Residence L31-L36 are over the current provisions at DB panel No.
31DB1 (3P 250AT).
Please approval for additional electrical work for modify existing DB Panel at L31 for Private Residence
L31-L33 and addition DB Panel at L34 for Private Residence L34-L36.
1. The existing DB Panel no. 31DB1 shall be modify to support Private Residence L31-L33 (following
load schedule from MEP designer of L31 to L33) and addition new CB 3P 50AT with Digital Meter
3P (existing meter is 1P) for L31, new CB 3P 80AT with Digital Meter for L32 and new CB 3P 50AT
with Digital Meter for L33.
2. Addition DB Panel no. 34DB1 (same spec as 31DB1) with main 3P 250AT , CB 3P 50AT for L34 , CB
3P 100AT for L35 and CB 3P 50AT for L36 with new Digital Meter (following load schedule from
MEP designer of L34 to L36) .
3. Main feeder of 34DB1 (new) plug in to the same feeder busduct of 31DB1.
4. Relocated CB 3P for kitchen exhaust fan AMCC-F/34-01, F/35-01 & F/36-01 from 31DB1 (existing)
to 34DB1 (new).
Best regards,
Kraidej Pringprerdprurnt
11
Archetype Thailand
Dear K.Kraidej
The addition DB panel can be relocated at L34 and will name it "34DB1"
Best regards,
Khwunchai Bootthai
Senior Electrical Engineer I Meinhardt Thailand
Dear K. Khwunchai,
Refer to load schedule of Private Residence L31-L36 over the current DB panel no. 31DB1.
TOC had checked the space for addition new DB panel at L31 but no space available then we
requested to addition new DB panel at L32 EE Room and will name it "32DB1"
Do we located this addition DB panel at L32 or relocated to L34 (existing 31DB1 for L31-L33 and
new DB for L34-L36)
12
Please recommended the location of this new DB panel and name it.
Looking forward to hearing from you.
Best regards,
Kraidej Pringprerdprurnt
Archetype Thailand
Dear K'Kraidej
After TOC check location for new panel (31DB2) in EE room L31 can't install because not have area of intallation
TOC request to move to EE room L32 and change panel name to 32DB1
Best Regard
M.Tanapat
Dear K. Kittichai,
Refer to the load schedule of Private Residence L31-L36 are over the current provisions at DB panel No.
31DB1 (3P 250AT)
Please estimate the cost for additional electrical work for DB Panel at L31 for Private Residence L31-L36.
Scope of addition DB Panel no. 31DB2 at L31 as below:
13
1. Addition DB Panel no. 31DB2 (same spec as 31DB1) with main 3P 250AT , CB 2 x 3P 50AT and 1 x
3P100AT with Digital Meter.
2. Relocated CB 3P for kitchen exhaust fan AMCC-F/34-01, F/35-01 & F/36-01 from 31DB1 (existing) to
31DB2 (new).
3. Main feeder of 31DB2 plug in to the same feeder busduct of 31DB1 (Load schedule of L31-L36 already
reviewed by MTL).
4. Wiring from 31DB2 - CB 3P 50AT to L-34 with main feeder 4x16,G1x6 mm2 IEC01, 32mm EMT. (bare
shell concept).
5. Wiring from 31DB2 - CB 3P 100AT to L-35 with main feeder 4x50,G1x10 mm2 IEC01, 50mm EMT. (bare
shell concept).
6. Wiring from 31DB2 - CB 3P 50AT to L-36 with main feeder 4x16,G1x6 mm2 IEC01, 32mm EMT. (bare
shell concept)
Best regards,
Kraidej Pringprerdprurnt
MEP Site Manager
+66 86 380 9234
140/49-50, 22nd Floor, ITF Tower
Silom Road
Suriyawong, Bangrak
Bangkok, Thailand 10500
www.archetype-group.com
EE_Aman32.pdf
14
EE-AMAN 34.pdf
EE-AMAN 35.pdf
EE-AMAN 36.pdf
EE_AMAN33.pdf
Please check the load schedule and we shall set up the con call for finalized the Main CB 3P 250A at panel
no. 31DB1 by today or tomorrow morning.
Please confirm the available time for our con call today.
Best regards,
Kraidej Pringprerdprurnt
MEP Site Manager
+66 86 380 9234
140/49-50, 22nd Floor, ITF Tower
Silom Road
Suriyawong, Bangrak
Bangkok, Thailand 10500
www.archetype-group.com
15
From: Ratana <[email protected]>
Sent: Wednesday, January 3, 2024 9:50 AM
To: Kraidej Pringprerdprurnt <[email protected]>; Thayut <[email protected]>; Frederic
Garnier <[email protected]>; Manutsawee Bovornsetthanan <[email protected]>
Cc: Chaisit Nimmalairat <[email protected]>
Subject: Re: Aman Residence L35 : MEP Packaged (Final)
Please allow me to postpone sending the MEP drawing for L33 within this week ka.
Best regards,
Ratana Kunchareon
The MEP drawing for L33 can sent to you within this week ka.
Best regards,
Ratana Kunchareon
Dear K. Ace,
Please send us the MEP drawing for L33 (for MTL to review EE Load of L31-L36)
Best regards,
Kraidej Pringprerdprurnt
MEP Site Manager
+66 86 380 9234
16
140/49-50, 22nd Floor, ITF Tower
Silom Road
Suriyawong, Bangrak
Bangkok, Thailand 10500
www.archetype-group.com
Dear K. Ace,
My observations:
1. AC Grilles are requested on the facade by MEP (for fresh air and toilet exhaust) too many locations
and not consistency, please re-arrange with MEP designer for typical and we have only one balcony.
2. For Sprinkler, the project did not provided sprinkler inside the fire stair case and balcony, please
confirm for sprinkler at the fire sprinkler and balcony if need.
3. EE load is missing L33 (we have L31,L32,L34,L35&L36) considered the provisions of L31-L36 Total
3Phase 250Amp. we need L33 for review the EE load.
Best regards,
Kraidej Pringprerdprurnt
MEP Site Manager
+66 86 380 9234
140/49-50, 22nd Floor, ITF Tower
Silom Road
Suriyawong, Bangrak
Bangkok, Thailand 10500
www.archetype-group.com
17
From: Thayut <[email protected]>
Sent: Wednesday, December 13, 2023 9:51 AM
To: Frederic Garnier <[email protected]>; Manutsawee Bovornsetthanan <[email protected]>; Kraidej
Pringprerdprurnt <[email protected]>
Cc: Chaisit Nimmalairat <[email protected]>; Ratana <[email protected]>
Subject: FW: Aman Residence L35 : MEP Packaged (Final)
Dear All,
Please check and confirm the building load schedule with the MEP design for Penthouse 35th Fl. As attached.
--
Best regards,
Mr.Thayut Kanchanaporn
Director of Project Development
18
https://drive.google.com/drive/folders/1itDKzfv75ZjgJUssOYfZrEFZHf9DTIsJ?usp=sharing
--
Chaisit Nimmalairat
Director
To help protect you r priv acy , Microsoft Office prevented automatic do wnload of this picture from the Internet.
To help protect you r priv acy , Microsoft Office prevented automatic do wnload of this picture from the Internet.
--
Chaisit Nimmalairat
Director
To help protect your privacy , Microsoft Office prevented automatic do wnload of this picture from the Internet.
To help protect your privacy , Microsoft Office prevented automatic do wnload of this picture from the Internet.
19