0% found this document useful (0 votes)
14 views

AUGUST 2024 MONTHLY PROGRESS REPORT

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views

AUGUST 2024 MONTHLY PROGRESS REPORT

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 11

PROGRESS REPORT FOR AUGUST 2024

MAIN CONTRACTOR : REXCEL BINA SDN. BHD.


CLIENT : DHAYA MAJU INFRASTRUCTURE(ASIA) SDN. BHD.

RAIL BOUND MACHINERY WORKSHOP


Fabrication and welding work
Location: Open fabrication yard, welding shed
Work completed: Welding of trusses and columns, anti-rust and prime coating.

Excavation and foundation work


Location: Rail Bound Machinery Workshop
Works: Excavation, levelling, lean concrete, and raft foundation preparation.
Dates:
Excavation & Lean concrete for the maintenance pit base.
Started : 08/08/2024 Completed : 14/08/2024

Maintenance pit outer formwork installation.


Started : 15/08/2024 Completed : 19/08/2024

Maintenance pit base reinforcement.


Started : 15/08/2024 Completed : 19/08/2024

Concreting Maintenance Pit Base.


Started : 22/08/2024 Completed : 22/08/2024

Excavation for raft foundation.


Started : 19/08/2024 In progress : 28/08/2024

Lean concrete for raft foundation.


Started : 19/08/2024 In progress : 30/08/2024

Maintenance pit base wall reinforcement.


Started : 23/08/2024 In progress : 30/08/2024

Miscellaneous Works
Spacer block preparation (09/08/2024,12/08/2024,22/08/2024)
Temporary earth excavation for drain diversion (13/08/2024)

PREPARED BY CHECKED BY
Name : Guruparan Name : Saravanan
Company : Rexcel Bina Sdn. Bhd. Company : Rexcel Bina Sdn. Bhd.
Designation : Site Engineer Designation : Construction Manager

REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PICTURES

REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PROGRESS REPORT FOR AUGUST 2024
MAIN CONTRACTOR : REXCEL BINA SDN. BHD.
CLIENT : DHAYA MAJU INFRASTRUCTURE(ASIA) SDN. BHD.

OFF-TRACK VEHICLE WORKSHOP


FABRICATION AND WELDING WORK
Location: Open fabrication yard, welding shed
Work completed: Welding of trusses and columns, anti-rust coating
Fabrication and welding trusses and columns
Started : 12/08/2024
In progress : 30/08/2024
Anti-rust and prime coating for trusses and columns
Started : 12/08/2024
In progress : 30/08/2024

DRW MARK FABRICATED IN-PROGRESS TOTAL (COMPLETED)


TR 1 5 0 5/5
TR 2 16 0 16/16
TR 1B 10 0 10/10
C (1,2,3,4,5),
0 9 +1 0/10
E (1,2,3,4,5)
A (1,2,3,4,5),
G (1,2,3,4,5) 0 10 0/10

TR 1A 3 2 3/10
others 19 1 19/20

PREPARED BY CHECKED BY
Name : Guruparan Name : Saravanan
Company : Rexcel Bina Sdn. Bhd. Company : Rexcel Bina Sdn. Bhd.
Designation : Site Engineer Designation : Construction Manager
REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PICTURES

TR 1 TR 2

TR 1B C (1,2,3,4,5), G (1,2,3,4,5)

TR 1A

A (1,2,3,4,5), G (1,2,3,4,5)

Others

REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PROGRESS REPORT FOR AUGUST 2024
MAIN CONTRACTOR : REXCEL BINA SDN. BHD.
CLIENT : DHAYA MAJU INFRASTRUCTURE(ASIA) SDN. BHD.

GANTRY
STRENGTHENING WORK FOR GANTRY NO.14 TO NO.23
Location: Gantries
Work completed: Strengthening work.
Dates:
Gantry no. 14, 15:
Completed : 01/08/2024

Gantry no. 16:


Started : 02/08/2024
Completed : 02/08/2024

Gantry no. 17,18,19


Started : 02/08/2024
Completed : 03/08/2024

Gantry no. 20,21,22


Started : 05/08/2024
Completed : 05/08/2024

Gantry no. 23:


Started : 06/08/2024
Completed : 06/08/2024

PREPARED BY CHECKED BY
Name : Guruparan Name : Saravanan
Company : Rexcel Bina Sdn. Bhd. Company : Rexcel Bina Sdn. Bhd.
Designation : Site Engineer Designation : Construction Manager
REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PICTURES:

REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PROGRESS REPORT FOR AUGUST 2024
MAIN CONTRACTOR : REXCEL BINA SDN. BHD.
CLIENT : DHAYA MAJU INFRASTRUCTURE(ASIA) SDN. BHD.

COLLECTION DRAIN AT THE DMIA SITE OFFICE


Dates:
Removing drain covers
Started : 27/08/2024
Completed : 27/08/2024

Excavation
Started : 28/08/2024
Completed : 29/08/2024

Sand base, crusher run base, BRC laying and concreting


Started : 29/08/2024
Completed : 29/08/2024

Installing U-drain and side backfilling with crusher run


Started : 30/08/2024
Completed : 30/08/2024

PREPARED BY CHECKED BY
Name : Guruparan Name : Saravanan
Company : Rexcel Bina Sdn. Bhd. Company : Rexcel Bina Sdn. Bhd.
Designation : Site Engineer Designation : Construction Manager
REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PICTURES:

REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PROGRESS REPORT
COVERED WORKSHOP
Location: Covered Workshop
Work completed: Leveling of crusher run, BRC laying, footing, concreting.
Dates:
Leveling of crusher run
Started : 02/08/2024
Completed : 08/08/2024

BRC laying
Completed : 09/08/2024

Additional footing (formwork, reinforcement, and concreting)


Completed : 05/08/2024

95m³ concreting
Started : 10/08/2024
Completed : 10/08/2024

Formwork dismantling, setup & threaded rods installation


Started : 11/08/2024
Completed :13/08/2024

PREPARED BY CHECKED BY
Name : Guruparan Name : Saravanan
Company : Rexcel Bina Sdn. Bhd. Company : Rexcel Bina Sdn. Bhd.
Designation : Site Engineer Designation : Construction Manager

REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PICTURES

REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988
PROGRESS REPORT
WELDING SHED
- Location: Welding shed
- Work completed: Installation of metal decks, Installation of 'Z' purlin
Installation of 'Z' purlin
Started : 03/08/2024
Completed : 06/08/2024

Metal deck installation:


Started : 07/08/2024
Completed : 09/08/2024

Miscellaneous works
Installation of door for worker's toilet 02/08/2024
The subsoil manhole cover has been fabricated 06/08/2024
Plumbing work for worker's toilet 09/08/2024
Installing drain cover slab 15/08/2024
Raising of manhole level 16/08/2024
Preparation of ‘ J ’ angle for footing 02/08/2024
Septic tank installation (worker’s toilet) 14/08/2024, 16/08/2024

PICTURES

REXCEL BINA SDN. BHD. (1085569-V), No. 50-A, Jalan Tun Abdul Aziz, 43000 Kajang, Selangor. T: +603-8733 7888 F: +603-8734 9988