0% found this document useful (0 votes)
7 views

06082024 DPR

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
7 views

06082024 DPR

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

REXCEL BINA SDN BHD

DAILY SITE REPORT AND PROGRESS


MAIN CONTRACTOR : REXCEL BINA SDN. BHD.
CLIENT : DHAYA MAJU LTAT SDN. BHD.

DATE : Tuesday, 6 August, 2024 WORKING HOUR : 12

WEATHER 0 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 0
0 1 2 3 4 5 6 7 8 9 0 1 2 3
Notes
FINE
DRIZZLE
RAIN
0 1 2 3 4 5 6 7 8 9 1 1 1 1 1 1 1 1 1 1 2 2 2 2 0
0 1 2 3 4 5 6 7 8 9 0 1 2 3

LABOUR
SUB-CONTRACTOR PERSON WORK START WORK END TOTAL HOURS
7 08:00 20:00 12
8 08:00 19:00 11
ACTIVITY SUMMARY
ACTIVITY LOCATION STATUS
The subsoil manhole cover has been fabricated Open Fabrication Completed
Yard
Crusher run leveling at 36 meters Covered workshop In Progress
Strengthening work on 23/23 of Gantry completed Gantry Completed
Earth leveling for covered workshop at 42 meters Covered Workshop In Progress
'Z' purlin installation welding shed Completed
Welding the Base of the High Beam for Rail Bound Machinery Open Fabrication In Progress
Workshop Yard

MATERIAL/EQUIPMENT RECEIVED MACHINERY


Excavator (DMIA)

REMARKS:

PREPARED BY CHECKED BY
Name : Guruparan Name : Saravanan
Company : Rexcel Bina Sdn. Bhd. Company : Rexcel Bina Sdn. Bhd.
Designation : Site Engineer Designation : Construction Manager
REXCEL BINA SDN BHD