Sir
With reference to the subject cited above, it is to inform that the Feasiblity Report for the
at DEGAN river Mahanadi submitted by you under reference
proposed barrage project across
returned back vide this office letter under reference (iv) with a request to re-submit
(ii) was
alongwith related soft-copies after due compliance to the observations communicated by this
number of times by this office as well as from O/o the
office earlier. You have been requested a
However, the
then CE, PPF&I to comply the observations & update/ correct the feasibility report.
response from you as well as from your co-consultant has delebrately been unprecise.
As regards issue of final comment list for compliance, it is requested to consider all the
observations of the CE, Planning i.e. the then CE,PPF&l as well as the observations of this office
communicated to you from time to time till sofar may be complied and accordingly the feasibility
Yours faithfully,
Superintendinghginèer,
Padampur Investigation Division,
Padampur.
Memo No.: 2022 Dated: 2D- 08 2022
to the Engineer-In-Chief, Planning & Design, Odisha, Bhubaneswar for
Copy submitted
favour of your kind information.
SUPERINTENDAKUNEER
Page- 1 of 2
Dated: 20- 08. 2 022
Memo No.: 2023wE)
Copy alogwith copy of letter No- 928/ ocCI SMP/ SM dated 19.08.2022 of SM (Civil).
ocC Ltd, Sambalpur Group of Projects, Sambalpur submitted to the Chief Engineer, Planning.
Odisha, Bhubaneswar for favour of your kind information and necessary action.
Encls.: As above
SUPERINTÉNDINYGENN`NEER,
Memo No. 202y Dated: 2D- 08-AD22
Copy submitted to the Chief Engineer, Survey & Investigation, HP Building, Delta
Square, Unit-8, Odisha, Bhubaneswar for favour of your kind information and necessary action
with reference to memo No.- 929/ OCC/ SMP/ SM dated 19.08.2022 of SM (Civil), OCC Ltd.
Sambalpur Group of Projects, Sambalpur
( .
Memo No.:
SUPERINTENDSKBMAEER,
Dated:a 0.08 2022
Copy submitted to the Managing Director, OcC Ltd., Gopabandhunagar, Bhubaneswar
for favour of your kind information and necessary action with reference to memo No.- 930/ OCC/
SMP/ SM dated 19.08.2022 of SM (Civil), OCC Ltd., Sambalpur Group of Projects, Sambalpur.
SUPERINTENDINABR
Memo No.: 2026 Dated: aO- O8 A022
Copy submitted to the Additional Chief Engineer, Northern Investigation Circle, Burla for
favour of your kind information and necessary action with reference to memo No.- 931/ OCCI
SMP/ SM dated 19.08.2022 of SM (Civil), ocC Ltd., Sambalpur Group of Projects, Sambalpur.
SUPERINTENDNGRNeNEER
Memo No. 20a7 Dated: 2 D- 08 2029
Copy submitted to the General Manager (Civil), OCC Ltd., Western Zone, Sambalpur for
kind information and necessary action with reference to memo No.- 930/ OCC/ SMP/ SM dated
19.08.2022 of SM (Civil), OCC Ltd., Sambalpur Group of Projects, Sambalpur.
( o.
SUPERINTENDIN ENGRe
Page- 2 of 2