SITE OBSERVATION TEST REPORT

PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.


EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000

Device to be commissioned: Transformer Differential Stability & Restricted Earth Fault Test
Test Sheet Name: Transformer Stability Test

1. Transformer Details:

Designation No : U/V/W
Manufacturer: Bharat Bijlee
Rated MVA : 100 MW
HV Voltage (kV) : 220 KV
MV Voltage (kV) : 33 KV
HV Rated Current (A): 262.4
MV Rated Current (A): 1749.5
Impedance % : 11.901
Vector Group : YNyn0
HV Bushing CT Ratio : 400/1
HV Neutral CT Ratio : 400/1
LV Bushing CT Ratio : 2000/1
LV Neutral CT Ratio : 2000/1
SERIAL NO : 5938/1

TESTED BY CHECKED BY WITNESSED BY


VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000

2. Transformer Stability Test Procedure

1.Objective:
The objective of this test is confirm that the differential relay(87T) and Restricted earth fault (BCPU &
87T) relay doesn't operate at normal conditions even though load currents are high, where It should
operate when a fault occurs in its zone.
2.Source:
Suitable 3 phase generator (Separate) – 415volt – 50 Hz or Suitable Voltage.
3.3 Phase shorting is to be done in Medium Voltage side to create load.

3. Precautions:

1.Good earth of: The Transformer, The shield of the cables, Relays & Star Point of CT’s.
2.The correct size of connected testing cables.
3.Determine working zones and places and preventing any person to be in these zones.
4.Suitable MCB for 3-phase supply.
5.CT terminal blocks must be checked and tightness well.
6.Check the Phase Sequence of the 3-Phase Supply.
7.Test equipments and tools:
8.Calibrated multi-meter.
9.Calibrated tester for measure current.

4. Calculation:

- H.V side:

o Ip = (100*10^6) / (√3*220*10^3) = 262.431 A


o I2S = (262.431) / (400/1) = 0.6560 A
- LV Side:
o Ip = (100*10^6) / (√3*33*10^3) = 1749.54627 A
o I2S = (1749.54627) / (2000/1) = 0.874773135 A
- Transformer Short Circuit Calculation:

% Z Voltage = 11.901 * 220000 /100 = 26182.2

HV Short Circuit Primary Current = 415*262.4 / 26182.2 = 4.1591 A


HV Short Circuit Secondary Current = 4.1591 / 400 = 0.01039A

LV Short Circuit Primary Current = 415*1749.5 / 26182.2 = 27.73038A


LV Short Circuit Secondary Current = 27.730/2000 = 0.013865 A

TESTED BY CHECKED BY WITNESSED BY


VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000

5. Transformer Differential Stability – Stable Condition

Primary Measurements

Measured 1U-1V 1V-1W 1W-1U Measured 1U 1V 1W 1N


Voltage 416.5 417.3 415.8 Current 5.0 5.0 4.9 0

Secondary Measurements

87 T
Phase HV BCT LV BCT
I, differential I, restrain
CORE -2 (mA) CORE -2 (mA)
U 13.0 15.6 0.002 0.020
V 12.9 15.6 0.002 0.019
W 12.6 15.1 0.002 0.019
N 0 0 - -

6. HV SIDE
I. Transformer Differential Stability – Unstable Condition (HV BCT 1U Ph Polarity reversed)

Secondary Measurements

87 T
Phase HV BCT LV BCT
I, differential I, restrain
CORE -2 (mA) CORE -2 (mA)
U 12.9 15.6 0.024 0.018
V 13.0 15.5 0.013 0.018
W 12.5 15.1 0.012 0.017
N 0 0 - -

TESTED BY CHECKED BY WITNESSED BY


VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000

II. Transformer Differential Stability – Unstable Condition (HV BCT 1V Ph Polarity reversed)

Secondary Measurements

87 T
Phase HV BCT LV BCT
I, differential I, restrain
CORE -2 (mA) CORE -2 (mA)
U 13.3 15.2 0.012 0.018
V 13.5 15.3 0.024 0.018
W 13.4 15.4 0.013 0.018
N 26.2 0 - -

III. TransforOmer Differential Stability – Unstable Condition (HV BCT 1W Ph Polarity reversed)

Secondary Measurements

87 T
Phase HV BCT LV BCT
I, differential I, restrain
CORE -2 (mA) CORE -2 (mA)
U 13.4 15.2 0.012 0.018
V 13.4 15.3 0.012 0.018
W 13.6 15.4 0.024 0.017
N 25.2 0 - -

7. LV SIDE
IV. Transformer Differential Stability – Unstable Condition (LV BCT 2U Ph Polarity reversed)

Secondary Measurements

87 T
Phase HV BCT LV BCT
I, differential I, restrain
CORE -2 (mA) CORE -2 (mA)
U 13.0 15.5 0.026 0.020
V 12.9 15.5 0.013 0.019
W 12.9 15.1 0.013 0.019
N 0 31.2 - -

TESTED BY CHECKED BY WITNESSED BY


VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000
V. Transformer Differential Stability – Unstable Condition (202 LV BCT 2V Polarity reversed)

Secondary Measurements

87 T
Phase HV BCT LV BCT
I, differential I, restrain
CORE -2 (mA) CORE -2 (mA)
U 13.0 15.4 0.013 0.020
V 13.2 15.5 0.025 0.019
W 13.1 15.3 0.012 0.019
N 0 31.3 - -

VI. Transformer Differential Stability – Unstable Condition (202 LV BCT 2W Polarity reversed)

Secondary Measurements

87 T
Phase HV BCT LV BCT
I, differential I, restrain
CORE -2 (mA) CORE -2 (mA)
U 13.3 15.5 0.012 0.020
V 13.2 15.4 0.013 0.019
W 12.9 15.2 0.025 0.019
N 0 30.2 - -

8. Transformer Differential Stability – Stable Condition


Primary Measurements

Measured 1U-1V 1V-1W 1W-1U Measured 1U 1V 1W 1N


Voltage 416.5 417.3 415.8 Current 4.9 5.0 4.8 0
Secondary Measurements
87 T
Phase HV BCT LV BCT
I, differential I, restrain
CORE -2 (mA) CORE -2 (mA)
U 13.3 15.5 0.000 0.00
V 13.2 15.4 0.000 0.00
W 12.9 15.2 0.000 0.00
N 0 0 - -

9. Transformer HV & LV REF Stability –-Stable Condition


TESTED BY CHECKED BY WITNESSED BY
VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000
Primary Measurements

Measured 1U-1V 1V-1W 1W-1U Measured 1U 1V 1W 1N


Voltage(V) 416.5 417.3 415.8 Current(A) 4.9 5.0 4.8 0

Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
0 0 0 0
W
N

10. Transformer HV REF Stability- 2U SHORT WITH GROUND & Polarity reversed in HV 1U CT
Primary Measurements

Measured 1U 1V 1W 1N
Current(A) 4.9 0 0 4.9

Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
0 11.8 14.6 9.99
W
N

TESTED BY CHECKED BY WITNESSED BY


VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000

11. Transformer HV REF Stability 2V SHORT WITH GROUND & Polarity reversed in HV 1V CT
Primary Measurements

Measured 1U 1V 1W 1N
Current(A) 0 4.9 0 4.9

Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
0 11.8 14.6 9.56
W
N

12. Transformer HV REF Stability 2W SHORT WITH GROUND & Polarity reversed in HV 1W CT
Primary Measurements

Measured 1U 1V 1W 1N
Current(A) 0 0 4.9 4.9

Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
0 11.8 14.6 9.89
W
N

TESTED BY CHECKED BY WITNESSED BY


VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000

13. Transformer LV REF Stability 2U SHORT WITH GROUND & Polarity reversed in LV 2U CT
Primary Measurements

Measured 2U 2V 2W 2N
Current 28.8 - - 28.9

Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
58.1 11.8 14.6 0
W
N

14. Transformer LV REF Stability –-Stable Condition 2U Ph SHORT WITH GROUND


Primary Measurements

Measured 2U 2V 2W 2N
Current 28.8 - - 28.9
Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
0 11.8 14.6 0
W
N

TESTED BY CHECKED BY WITNESSED BY


VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000

15. Transformer LV REF Stability 2V SHORT WITH GROUND & Polarity reversed in LV 2V CT
Primary Measurements

Measured 2U 2V 2W 2N
Current(A) - 29.5 - 29.5

Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
59.12 11.8 14.6 0
W
N

16. Transformer HV REF Stability –-Stable Condition 2V SHORT WITH GROUND


Primary Measurements

Measured 2U 2V 2W 2N
Current - 28.8 - 28.8
Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
0 11.8 14.6 0
W
N

TESTED BY CHECKED BY WITNESSED BY


VOLTECH HARTEK POWER PVT LTD AMPLUS SOLAR QA / QC
Name
Signature
SITE OBSERVATION TEST REPORT
PROJECT 3x100MW PROJECT JAI BIKANER, RAJASTHAN.
EPC CONTRACTOR HARTEK POWER PVT LTD
CLIENT GRIAN ENERGY PRIVATE LIMITED DATE 24/08/2023
NAME OF EQUIPMENT POWER TRANSFORMER LOCATION BAY 202
Document No. M+/QMS/4070 DETAILS
Issue No. 01 Rev. No. 00
Issue Date 21.09.2020 Rev. Date 00.00.0000

17. Transformer LV REF Stability 2W SHORT WITH GROUND & Polarity reversed in LV 2W CT
Primary Measurements

Measured 2U 2V 2W 2N
Current(A) - - 28.2 28.2

Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
58.2 11.8 14.6 0
W
N

18. Transformer HV REF Stability –Stable Condition 2W SHORT WITH GROUND


Primary Measurements

Measured 2U 2V 2W 2N
Current - - 28.8 28.8
Secondary Measurements

87T BCPU
Phase
LV REF(A) HV SEF(mA) LV SEF(mA) HV REF(A)
U
V
0 11.8 14.6 0
W
N

19. Remarks:
Transformer Differential , REF & SEF Test Found OK