Name MR. Charndra Shaker/Noorullah Shaikh Mr. MIRZA Mr. Soumnath Chaudhuri MR. Karanbir Singh
Signature
Critical Control Points for this HIRA 1.Peripheral protection is provided in periphery if the tower
2.scaffold tag system is in place.
3.Only authorized operators are allowed to operate equipments.
1. Combustibles near the vicinity of hot 1.Ensure all work equipment protects against
works needs to cleared catching fire or overheating.
2. Spatter protection needs to be made 2.Ensure proper housekeeping, such as preventing
injury/burns, to arrest the hot metal in the same floor ventilation points on machinery becoming clogged
Fire hazard, Burn or smell Fire incident suffocation,Dam workmen/ Supervisor 3. Fire extinguisher needs to be provided 3 3 9M with dust or other materials - causing overheating 3 1 3L A S
age 4. Helmet mounted welding face shield 3.A planned maintenance programme should deal
with required shade glass must be used with 4.Do not use portable
with necessary PPE - Apron, Leather heaters unnecessarily.
gloves 5.routine checking and supervision
Fabrication of MS
Pipe system
4 (Welding/ Gas
cutting/ Grinding.
Cutting)
Fabrication of MS
Pipe system 1. Compressed gas cylinders must be
4 (Welding/ Gas kept in upright position always 2. Gas
cutting/ Grinding. cylinder set should not be directly
Cutting) slinged & lifted; must be transported by
crane only through baskets & that too In
1.Periodical medical health check up camp must
upright position & securing the cylinder
be arrange for workers.
to arrest movement while lifting
injury/burns, 2. Take rest in some interval.
Fire & explosion due to unsafe Gas 3. Cylinders should not be kept
inproprate gases suffocation,Dam workmen/ Supervisor 4 4 16H 3. Arrange ment of water at work 4 1 4L A S
cutting horizontally
age location.Periodical medical health check up of
4. Valve cap needs to be ensured in
workers.
cylinder all the time
5. Combustibles near the vicinity of hot
works needs to cleared
6. Spatter protection needs to be made
to arrest the hot metal in the same floor
7. Fire extinguisher needs to be provided
1.Inform all concerned about this plan and to
identify the safe reporting line.
1. Wheel needs to be checked for expiry
2.Provide necessary safety inputs to all personnel
& cracks
& contractors on the development and
2. Ring test needs to be conducted to
Wheel breakage & hit to person Contect with sharp implementation of project specific safety plan
Injury/ Damage workmen/ Supervisor check the hollowness of the wheel 4 3 12M 4 1 4L A S
while grinding edges 3.To appraise the core opertor on intending
3. Helmet mounted clear face shield
priority for safety in our project work.
must be used with necessary PPE -
Apron, Leather gloves
and ensure that work place is free from
occupational illness
_______________________________________ _______________________________________
Risk Index
Risk Matrix
Risk Category
Risk Level (Quantitative)
(Qualitative)
1 to 4 Low (L)
5 to 12 Medium(M)
13 to 25 High (H)