E M CH 45 Addendum 01
E M CH 45 Addendum 01
IECT DIRECTOIT
MPPWD (PIU), NIRMAN BHAWAN, BHOPAL
SCHEDULE OF RATES ELECTII.ICAL WORKS i.e. (01/1212{)20)
(W/ADDENDUMNO.-01)
The rates of lbllowing items (Electrical SOR i.e. 0111212020) are added in chapter no-45 and
NABL/CPRI test charges as under and rates shall be aplicable with etlbct from the date of issue of
order i.e. ....10312022
No. F-97-171 l202llE&M SOn/ Adtlendum l..lG.l.. Btrop:rto Dt. ...OJ./0flZOZZ
CHAPTER 45
MEDICAL GAS PIPELINE SYSTEM (NIGPS)
Item Sub Ilate
No Ilpm
Itenr Nanrc Descriptinn of Itenr Unit
t'in Ils\
.,
I ,l 6
Supply,instal lation,testing and comnr issioning ol' [u I ly, airtontatic
rnedical isolation panel 1br OT and ICU , isolatotecl power
distribLrtion panelas per ItsC 60364-7-710 and BIS SP 30-2011
part -3 section 4of medical establishntents.ntedical isolaton
Medical
45.r8 lsolation transformer, earth fault location system and rentote indicator
panel should be CE certified irnported from foriegn countries witlr
Panel
4 Digit nurnber european notified body no. , coLrntry of origin
mention on it and consists of fbllorving:
iii) panel must have provision for two different power supply at
primary side of transformel and system should be designcd
and installed to facilitate the automatic changeover ltom
main ciistributin systenr to electrical safefy porver source
feeding essential loads as per IEC 60364-5-536-2.2.4.
Page 1 of 2