Work Distribution
Work Distribution
In continuation to earlier distribution, following distribution of works are made amongst the
officers and supervisors as enclosed annexure 'A'.
Remaining all the works as being supervised on date, shall continue to be supervised by
respective senior supervisors.
All SSEs nominated to work between Beed to Parli sections has to camp at Beed invariably.
~/ --..:~ ~~--
(~tf',p
:r z . 31,'f!Tl
,... v, 'I
..._ .., I
-:0
',;) if
0
R-42
Une Project.
f..lrthworkil1 ~fflbankmt.nt, cutting and bridgt approacht!i .1nd
constructton or minor br1dgts, RUDs In srction bttwttn Uttd to P.irU
f7 t 44.S 1 ICAO(C )/992 dated 09.o3:i0t8 M/s. P. Venkata
IRamanalah & Co.
8494 75 10070.39 84.35 f86.3S 1575.64 IAXEN(C )BEED Shri. Suresh Kumar
Manda! (SSE/Wks / Beed)
I
rfrom Ch.210000 m to 230000 m for ANG· 8,.d - PV New BG Line Prol«L
.
3 IR-132 Construction of Balance Minor Bridges, RUBs. Droln work.
earthwork and other mlscellaneous work from Ch.100000 m to
17518 32 I CAO (C) 1000 Dtd.14.0B.2018.
IM/s. Dream Construction, 18402.06
Nandurbar.
j104~ j00.46 j02.46 j2040 19 jAXEN(C )ANG Shri. S. R. Kuwar
(SSE/Wks/ANG)
'
167000 m In connection with Ahmtdnagar- Bttd - Parll New Broad
I
..I'
Gauge Line Project
14 IR-162 ·construction of Balance Minor Bridges, RU B's, Height C.A. No. CR/CRC/Clvll/2024/0007 Shri. Satram j889.23 fo li:606 j18.86 j4384.69 /AXEN(C )BEED Shn. S.R. Ku war (SSE/Wks
Gauges, Drain work, Earthwork, Toe wall, stone pitching Dtd. 28.02.2024 lnfrastructureOVJ, / ANG)
stair, ladder, footpath, Railing, other misc. work Wadwani to Latur
Parli from Ch. 200000 to Parli and construction of CDP & 5273.92
FOB at Eganwadi & Bttd station in connection with
Ahmednagar•Bttd·Parli Valjnath New Broad Gauge Line."
s I
I
IR-131 Construction of Major Bridges from Chalnage 140000m to 17642.53 ICAO/C/1013 Dtd 05.10.2018. M/s. P. Venkata 16181.88 17676.03 180.53 182.53 11494.15 IAXEN(C JANG Shn. S. Shnvastav !
160000m & Road over Bridges from Chalnage 100000m to 160000 Ramanalah & Co. I (SSE/Wks/ANG)
m Including approach earthwork In connection with Ahmednagar-
Beed-Parll Valjnath New BG Line Project.
LAO No. EW/187 /R/41 IS dated M/s Ferro Concrete Const, 3741.31 XEN(C )ANG Shn. A.K Akela (SSE/Wks
l
'·constrcuUon of FOB, COP and Subway at various staUons and 4110.62
I
6 IR-146 rl37.08 /62.96 /2395.77
locaUons from Naroyandoh to Bud Including construction of 13.01.2020 Indore r96 I Bttd)
substrcuture and superstrcuture of ROB at Ch. 22 l 00 m & 35050m AXE~ (C)ANG
and superstructure of ROB at Ch. 52475 m, 53475m
60550m.61400m and Mlsctllaneous works In connection with '
1Ahmednagar-Beed- aprll valjnath New BG line Project".
1;
I
7 IR-149 !Construction of Daund Road ROB at Km 354.15 on Ahmednagar • 4680.81 WA No.: EW/187/R/4186 Dtd. Shrl. Satyasal Baba lnfro 2859,79 5839.12 48.98 50.98 2979.33 XEN(C JANG Shri. S. Shnvastav
I
I Daund Road NH 160 In connection with ANG-BEED·Parll ValJnath
N•u• Rr. lln, p.a••ct.
09.09.2022
I
XEN(C JANG
'9 IR-172 Construction of Road Over Brtdaes at Ch. 242762 and at
252950 in connection with Ahmednagar -Beed•Parll Valjnath
1576.28
Englnetr1ng/ DYCECANG _
M/s. Venkateshwara
(SSE/Wks/Parli) '!
2023_!3/ 00830120097339 dated
New Braod Gauge Line Project Infrastructure JV
12.02.2024
( Latur)
I I I
131.00 133.08 1226.37
I
10 IR-175 328.44 CA No. CR/CRC/Clvll/2023/0029 M/s. Pushpak Rall 1102.01 10
Otd. I 5.05.2023 Construction Private
"Supplying, fabricaUon and erection of steel inspection -~
Limited- Shn. S. Shnvastav
platfonn for ROB and providing OHE mast holding
arrangements on piers of major bridges protective screen
ULHASNAGAR.
XEN/C/ANG
( SSE/Wks/ANG) i
11 IR-90
Iover ROB between ANG-BEED secUon In connection with
lAhmedna2ar • Beed-Parii Vairnath New BG line orolect."
!"Flash Butt Welding of 52 Kg/ 60 Kg, 90/72 UTS (New/S. H.) 1032.53 ANG/ W/ CN/R·63 Dtd. 05.03.2019 The India Thermlt 596.86 1045.3 57.1 59.J 448.44 XEN/C/ANG Shri. Shishlr Kumar Shri.
I
(Single/ SWR / LWR) rolls In Naroyandoh to KM 160 In connection CorporoUon Limited Mahendra Kumar Meena
with Ahmednagar - Beed - Parll Valjnath New BG Line Project". (SS!i/P.Way/ANG)
12 IR-130 ICollectIon of 2nd Class 60 kg rolls reelased from main line In 739.73 ANG/W/CN/R•67 Dtdl8.10.20J9 M/s Tlrupatl Balajl 266.97 769.19 34.71 36.71 472.76 AXEN/C/ANG Shri. Shishir Kumar Shri.
var1aous division and tronsportatlon of released rails for use In ANG Roadllnes Mahendra Kumar Meena
betd-aprll Vaijanth New BG Un• Project. (SSE/P.Way/ANG)
~l--
~(~,
1'll1 ~.31t!'td-i'I"
DY. CHIEF ENGINEER 1t
~EN,TRAt RAlfivAV:,.kHllieo~ (C)ANG
----~ ,,..._ ~--~ ----~ ~Tt·r :. OPfe'.Wll..-ilR ,-/ -1./
.. .,, , _ ~ , l,"V - --·-
~<r_
~-~3 lfmra t(~.,
lfut ~,31t;qe;,11~
DY. CHIEF EHGIM\fER 1t
CEfmW RAllWAY.AH('1EDNAG.a·
;i
-~
1;;,,
.
Laying & Linking or BG track from Km. 170 to Km.
CR/CRC/CIVIL/2024/00I1 Dtd.
M/s. Khodal 105.27 0 7.62 9.62 127 S.89 Shrl. Shlshlr Kumar Shri. \
25
215 in Beed-Telgaon section an connection with
18.05.2024
Corpora lion -
Vlramgam 7, Ramnagar
Mahendra Kumar Meena
(SSE JP.Way/ANG)
}1
Ahmednagar-Beed·Parli Va1inath New BG line Pro1ecl (Re· XEN/C/ANG ti
Society, IOC Colony
R-167
invitation).
1381.16
Road, Viramgam, ~r
·-~
Gujarat
'1t
~',1
LOA/ Contract No. DyCE-C-ANG· M/s. Khodal 0 0 0.00 2 1849.83 ShrI. Shlshir Kumar Shri.
26 Laying & Linking orBG track from Km. 215 to Km 261 In Corporation -
Engineering/ DYCECANG _ Mahendra Kumar Meena
Telgaon • Parh section In connection with Ahmednagar-Beed-
2023_008/ 00884200094024 dated Viramgam 7, Ramnagar (SSE/P.Way/ANG)
Parli Vaijnath New BG lane project. AXEN/C/ANG ~l
R-168 1849.83 26.12.2023 Society, IOC Colony
Road, Vlramgam, (a
t•)
Gujarat
CAO (C )/1019 Dtd. 14.12.2018. M/s. Mcrakl Dream 1739.4S 2799.l 62.14 64.14 10S9.6S AXEN(C )BEED °i'.1
27 R-43 Construction or station building ,platform and circulating area etc. 2283.9S
at MauJ. Ghatsawall. Wadwanl, Telgaon, jawala. Sirsala, Nagapur,
Buildcon (JV) Shri. A.K. Akela (SSE/Wks };.~
r.
/ Beed)
and Tokwadl In connection with Ahmednagar ·Beed• Parll Valjnath
28 R-22
New Broad Gauge Line Project
Construction ofSt.itlon Building. platform,clrculatlng area etc. at S32.9 BEED/W/CN/R. 06 Dtd. 30.12.2017. Syed Ismail Syed Karim 494.54 663.3 74.56 76.56 168.76 AXEN(C )ANG ·i-'~'
• ~-·,
Talegaon and Beed In connection with Ahmednagar • Beed• Parli Shri. A.K. Akela (SSE/Wks
Valjnath New Broad Gauge Line Project. ~•'
/ Beed)
i.
'it'
29 R-139 Construction orRB II, RB Ill and RB IV Qtrs. At Ashtl to Eganwadl 1807.32 ANG{W/CN/R-76
M/s. Sal Construction,
Ahmednagar, Maharastra
2050.S 1 2582.87 79.39 81.39 532.36 Shri. Shreekesh Meena
(SSE/Wks/ ANG)
~,..,.1
section In first Section In first phase In connection with
XEN/C/ANG
Ahmednagar-Beed-Parll Valjnath New BG line Project.· (Re•
Invitation)
11
1521.98 ANG/W/CN/R-77 M/s. Shrlram 882.74 0 58 60 639.24 AXEN(C)BEED
30 R-140 Construction or RB II, RB Ill and RB IV Qtrs. At Ralmoha to Beed
Construction Engineers &
section in first section In first phase In connection with Shri. A.K. Akela (SSE/Wks -~
Contractor, Latur.
Ahmednagar-Beed-Parll Valjnath New BG line Project." (Re- / Beed)
Invitation)
1677.l LOA No. DYCE·C-ANG- M/S, IHAIHARIA NlRMAN 557.82 1995.61 27.95 29.95 1437.79
31 R-153 •construction or Tower wagan shed, substation with 132kv
switching st.itlon (Type X) Tss and ssp for power supply ENGINEERING/DYCECANG_2022_08 LTD· BILASPUR Shr\. Shriram Meena
/00828690069938 Dtd.18.01.2023 XEN/C/ANG
arrangement or Ahmednagar to Beed station In connection with (SSE/Wks / Beed)
Ahmednagar-Beed-Parli Valjnath BG Line Project."
ANG/W /CN/R-33 Dtd.23.06.2017 LKT Engineering 53.07 72.13 73.58 75.58 19.06 AXEN(C)ANG Shr\. V .G. Dhandore
32 R-62 "Exploration and preparation or GAD, detall working drawings and 49.48
Consultants Limited, New
design for Road Over Bridges (ROBs) In deep cutting from Kada to (SSE/Wks/ ANG)
Delhi
Parll In connection with Ahmednagar •Beed• Parll Valjnath New BG
I In• DMl•,o•
-\eL-
~~~Udtl~ ,
lttlt ,3'f4di1iN
OY. CHIEF E~INEER \L
:t:.NiRA\ RMlWAY.A.HtAE.DNM,~•
'<:,.
....
)6 R-179 Connrurtton ofb1Lanr, ~s1dc-nt1al qlrs 8u1ldln1 in OyCECANC Otd 05062024 0 Shn Shrlr.im Mttn,.
0 000 200 1530
Ahmf'dn;a,.ir to Rl,moha in conn,ruon w,th Ahmfdn.1,:.1r• (SSE/Wk</ANG),
Bffd·P.irt1 V,aijnath Ntw Broad Gaugr Wnf projKt.• Shn Shtih1r Kum.ir
XEN/C/ANG (SSE/P W,y/ANG)
]7 R-181 Conslruruon of balance rt-sidtnt1al qm Building at Wadw.11ni 1q42 58 DyCECANC.2024.06 Old oq 05 0 0 000 2 00 15]0
and T•la;aon In connect1on with Ahmtdn;1gu•Bffd·P,u11
V.111n;ath New Broad G.auge Unc- proJKt. •
Shn Am.;ar Kumir Aktl..1
AXEN/C/BEEO
(SSE/Wk</ S..d)
38 R-182 Pre and Post tamping Track MusurtmtnU Sur.-ty usina ]2 )4 CA No M/s TEROTECII 0 0 000 200 Jl
Timblt Gtdo Vorsys Systtm Bttwt"fn Am,1lner•Egh;anwad1, CR/CRC/Clvll/2024.07 /00835990 I ENGINEERS
0S720D1d
Eah.anwadi·Htf'd, Beed- W.ldw;an1, W;adw.am ·Sirs.ala stctJon PRIVATE LIMITED- Shn Shishlr Kum,.r
1n ronnKtlon with Ahm~nagar•Btt-d· P.1rli V;a1jnath MORAOA8AO AXEN/C/Bttd
(SSE/P Way/ANG)
new BG Im, projKt..•
39 Construct1on of 29 Nos Ro;ad Ovc-r Bnd1es(ROBs) 1n LOA No CR-CAO-C-HQ· 2000 0 850 10 so 215]5
conntctlon with ntw lint bttwttn Bttd•Puli Stctaon under ENGG/CAOC-08· 1) Shn S Shnvut~v
Solapur 01vislon In lhr Crntr.al Ra1lw.1y zont 2023/00828690090116dtd (SSE/Wks/ANG)
31 10.2023 2} Shn. Shnetkesh Mtt-n.1
(SSE/Wks/ANG)
M/S JHAJHARIA 3)Shr1 Shnram Mun.a
R•l58 2353514 NIRMAN LTD- XEN/C/ANG (SSE/Wk</ Bttd)
DIV.SPUR 4)Shn SurtSh Kum..r
M,nil,\ (SSE/Wk</ Btod)
S)Shn M.1nslnah
OE/Wks/P,rl,)
~t<z_
1'Uf~,31F'le't•I"
DY. CHIEF EffGINE.ER tt
~~NTRAI 11.tl\.WAY..AHMEONAC>-•