0% found this document useful (0 votes)
14 views1 page

IC-RMP-MAR2020-142

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
14 views1 page

IC-RMP-MAR2020-142

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

INSPECTION CERTIFICATE

1.IC Number:IC-RMP-MAR2020-142 Date. 12-03-2020

2. Order Number:2300051342/109
P O Validity Start Date**:15.04.2019 P O Validity End Date**:30.09.2020
3. Name & Address of Supplier:M/s Effwa Infra & Research Pvt Limited(M/s. Century Crane Engineers Pvt. Ltd)

4.Category of Inspection: Waiver Inspection

5. Place of Inspection:

Purchase Order Quantity Inspection Quantity


Sap Order Cumulative
Line Description Quantity Quantity for which Offered Accepted Remarks
Rejected
Item No (Nos.) IC issued till Date (Nos.) (Nos.)

300 Manual Mechanical Hoist 1 NIL 1 1 NIL

(Provided Electric Hoist-1 Ton in


310 Manual Mechanical Hoist 1 NIL 1 1 NIL place of Manual Hoist -1
Ton as requested by TSL)
(Provided Electric Hoist-1 Ton in
320 Manual Mechanical Hoist 1 NIL 1 1 NIL place of Manual Hoist -1
Ton as requested by TSL)

Ref:

JIR No:
Drawing No:
QAP No:
ICS Document Ref No:

Deviations Found:

a) NA

b) NA

c) NA

**Clearance Code:

Please Tick If The Inspection Material Is Hard Stamped By You Inspection Certificate Issued By:

Note: This Inspection Certificate does not absolve the suppliers / manufacturers from their responsibility for (a) the correct supply of the equipment / material
regarding quality , performance and quantity ,(b) the supply of entire ordered quantity (ies) of the material / equipment in complete conformity to the
requirement as to quality and quantity of the purchasing authority , and (c) replacement of material / equipment in case of non conformity of quantity , quality
and performances when rechecked by the consignee or checked in operation at site , with the purchasers specification , or manufacturers certificates /
accepted specifications and en rechecked by the consignee or checked in operation at site , with the purchasers specification , or manufacturers certificates /
accepted specifications and suppliers works /premises.

** For Internal use of Issuing Authority

You might also like