24kk0081_c
24kk0081_c
49.60
1.50 5.40 5.00 5.40 1.50 12.00 1.50 5.40 5.00 5.40 1.50
B8 B8 B8 CB
1 3.00 1
3.00
B8 B9 B8 B8 B8 S1 B9
STAIRWELL S2 S2 S2
0.30
0.30
2 CB
B8 B8 B8 CB
2
8.00
8.00
5.00
5.00
S1 B8 S2 B8 S2 B8 S2 B8 S1 B9
B9
3 CB B8 B8 B8 CB
3
3.00
3.00
B9 S1 B8 S2 B8 S2 B8 S2 B8 S1 B9
4 CB B8 B8 B8 CB
4
24.00
24.00
8.00
8.00
EXISTING
5.00
5.00
5 B9 S1 B8 S2 B8 S2 B8 S2 B8 S1 B9
5
STRUCTURES
6 CB B8 B8 B8 CB
6
5.00
5.00
B9 B8 S2 B8 S2 B8 S2 B8 S1 B9
S1
8.00
8.00
CB B8 B8 B8 CB
7 7
3.00
3.00
B8 STAIRWELL B9 B8 S2 B8 S2 B8 B9
S2 S1
CB
8 B8 B8
8
B8
49.60
A B C D E F G H I J
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
ARCHITECT II
CONSTRUCTION OF S
MISAMIS ORIENTAL FIRST 50
MULTI-PURPOSE BUILDING, DESIGNED BY:
FOURTH FLOOR FRAMING PLAN
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 9 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
10mmØ STRAIGHT BARS 10mmØ STRAIGHT BARS
SPACED AT 250mm O.C. SPACED AT 250mm O.C. BOTHWAYS
L
LENGTH
L/4 L/4
L/4 L/4
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
CONSTRUCTION OF TYPICAL SUSPENDED SLAB ARCHITECT II
MISAMIS ORIENTAL FIRST REINFORCEMENT DETAIL S 51
MULTI-PURPOSE BUILDING, DESIGNED BY:
TYPICAL DETAIL OF REINFORCED
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY,
CONCRETE BEAM JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 10 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
TYPICAL CONCRETE SLAB SECTION ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
A B C D E F G H I J
1 1
2 2
12.00
3 2.22 7.55 2.22 3
1.28 5.00 1.28
150 x 50 mm LC PURLINS
4 4
1.35
5 EXISTING GIRT - 1 5
1.22
STRUCTURES
1.28
GIRT - 1
6 6
TRUSS - 1
TRUSS - 1
5.00
12mmØ SAGROD
WITH NUT AND WASHER
GIRT - 1
7 GIRT - 1
7
1.25
TRUSS - 2
TRUSS - 2
2.85
8 GIRT - 1 8
1.35
1.15 5.00 1.15
7.30
A B C D E F G H I J
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
ARCHITECT II
CONSTRUCTION OF S
MISAMIS ORIENTAL FIRST 52
MULTI-PURPOSE BUILDING, DESIGNED BY:
GROUND FLOOR ROOF FRAMING PLAN
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 11 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
A B C D E F G H I J
13.40 13.40
0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.70 0.70 0.70 0.70 0.70 0.70 0.70
0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.65 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.40
1.35
1.35
TRUSS - 4 TRUSS - 4 TRUSS - 1 TRUSS - 1
1 1
GIRT - 1
GIRT - 1
GIRT - 1
2.90
2.90
3.00
3.00
GIRT - 2
GIRT - 2
GIRT - 2
GIRT - 2
7.22
7.22
TRUSS - 4 TRUSS - 4 TRUSS - 1 TRUSS - 1
2 2
2.35
2.35
150 x 50 mm LC PURLINS 150 x 50 mm LC PURLINS
TRUSS - 4 TRUSS - 4
GIRT - 1
GIRT - 1
GIRT - 1
5.00
5.00
0.62
0.62
GIRT - 3 GIRT - 3
GIRT - 3
GIRT - 3
12mmØ SAGROD
WITH NUT AND WASHER
GIRT - 1
GIRT - 1
GIRT - 1
W/ STANDARD TURNBUCKLE W/ STANDARD TURNBUCKLE
GIRT - 2
GIRT - 2
GIRT - 2
GIRT - 2
4.00
4.00
4 4
12mmØ SAGROD
24.00
24.00
TRUSS - 3 TRUSS - 3 TRUSS - 2 TRUSS - 2
WITH NUT AND WASHER
5 EXISTING GIRT - 2 5
GIRT - 2
GIRT - 2
GIRT - 2
GIRT - 1
GIRT - 1
GIRT - 1
4.00
4.00
STRUCTURES
TRUSS - 3 TRUSS - 3 TRUSS - 1 TRUSS - 1
6 6
GIRT - 1
GIRT - 1
GIRT - 1
4.00
4.00
GIRT - 2
GIRT - 2
GIRT - 2
GIRT - 2
TRUSS - 2 TRUSS - 2
TRUSS - 3 TRUSS - 3
7 7
4.00
4.00
GIRT - 2
GIRT - 2
GIRT - 2
GIRT - 2
GIRT - 1
GIRT - 1
GIRT - 1
TRUSS - 1 TRUSS - 1
8 TRUSS - 3 TRUSS - 3
8
150 x 50 mm LC PURLIN
0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70 0.70
1.50 5.40 4.70 0.70 0.70 0.70 0.70 0.30 0.30 0.70 0.70 0.70 0.70 4.70 5.40 1.50
A B C D E F G H I J
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
ARCHITECT II
CONSTRUCTION OF S
MISAMIS ORIENTAL FIRST 53
MULTI-PURPOSE BUILDING, DESIGNED BY:
ROOF FRAMING PLAN (FOURTH FLOOR)
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 12 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
5.53
A B C
2" x 2" x 6mm THK. 2" x 6mm THK.
ANGLE BAR FLAT BAR
0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40
PC PC
0.70
0.60
GIRT - 2
GIRT - 2
A
0.40
2.90
2.90
A
B B
A B A
PC PC
A
B
B B
A
A
0.40
2 FASCIA FRAME DETAILS
A
13 18 SCALE 1:30MTS
GIRT - 3
GIRT - 3
GIRT - 3
4.65
4.65
SCHEDULE OF TRUSS/GIRT MEMBERS
AND WELDS
WELDS
TRUSS MEMBERS SIZE
MARK
5.40 TRUSS 1 (mm) THICKNESS
(mm)
LENGTH
L1 L2 L3
0.40
B
B B
B B B
0.40
B
B B B
B B 0.40
A A A
B
0.40
B B B B B B B B B
A A A
0.40
GIRT 1
TRUSS 2 B B B
0.40
B B B B B B B B B
C D B B B
0.70
0.55
C D GIRT 2
15MM THICK GUSSET PLATE
A 55mm X 55mm X 15mm 0.40
0.40
B B
A B
0.65 A A A
A CEMENTITOUS GROUT
0.40 (SELF LEVELING)
A B B B B B B B B B
0.50
B
0.40
4 - 20mmØ X 400mm ANCHOR BOLT
WITH STANDARD NUTS & WASHERS B
B B
B B
A A A
5.40 B
0.40
GIRT 3
TRUSS 3 TRUSS 4
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
CONSTRUCTION OF BUILT-UP TRUSS ELEVATION ARCHITECT II
MISAMIS ORIENTAL FIRST FASCIA FRAME DETAILS S 54
MULTI-PURPOSE BUILDING, DESIGNED BY:
BUILT-UP GIRT ELEVATION
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY,
SCHEDULE OF TRUSS/GIRT JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 13 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
MEMBERS & WELDS ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
150mm
S -1
80mm TRUS
150mm
12.7mm THK. GUSSET PLATE GIRT
-1
-2 80mm
GA. 26 PRE-PAINTED TRUSS
CORRUGATED G.I. SHEET
CENTER LINE
12mmØ SAGRODS WITH GIRT
OF TRUSS - 2
FULL 6mm STANDARD NUT AND WASHER
WELD J-BOLT @ EVERY
50mm
S- 1
TRUS
6mm
GIR DOUBLE to DOUBLE (RIGHT)
TYP. T-
2
LC PURLINS PANEL 1 PANEL 2
LC PURLIN
℄
FULL
SINGLE to SINGLE (RIGHT)
WELD 6mm
SS -1
TRU GIRT
TRUSS DETAILED CONNECTION OF ROOFING PANEL -1
J-BOLT SPACING
PURLIN TO SAGROD SIDE LAP DETAIL
⅊, S- 2
TRUS SINGLE to DOUBLE (RIGHT)
GIRT
- 2
S-1
6mmØ J-BOLT SPACED AS SHOWN TRUS
AT ALL PURLINS
GIR DOUBLE to DOUBLE (LEFT)
T-
2
BIGGER SIZE OF
CENTER LINE
WASHER
OF TRUSS
FULL 6mm
1.6mm THK. x 20mm x 50mm x NUT
WELD SINGLE to SINGLE (LEFT)
100mm C-PURLINS NEOPRENE
GASKET
TRUSS
J-SHAPED BOLT
6mm
TYP.
FULL
⅊,
WELD 6mm
LC PURLINS
2 GIRT TO TRUSS CONNECTION DETAILS
GA. 26 PRE-PAINTED 14 18 SCALE NTS
CROSS-BRACING CONNECTION DETAIL ROOFING FIXER CORRUGATED G.I. SHEET
ISOMETRIC VIEW
ROOFING TO PURLIN CONNECTION
200mm
400mm
500mm
15.2mm THK. GUSSET PLATE
GUSSET
500
300
LC PURLINS
LC PURLINS
GUSSET PLATE PLACEMENT
A 307 BOLTS 10mmØ X 50mm 125 50
A 307 BOLTS 10mmØ X 50mm
WITH NUT AND WASHER 125 WITH NUT AND WASHER
6
125
25
25
LC PURLINS 15.2mm THK. BASE PLATE
125
500
LC PURLINS
125
S RD
US S See BASE PLATE detail
TR CHO US RD
50
125
P TR CHO
50
125
TO P
TO
PC1
PC1
50
(PC1) PURLIN CONNECTOR BENT PLATE
4 - 10mmØ A 307 BOLTS 50
4mm X 125mm X 125mm LEG X 50mm LEG TOP CHORD PC1 4 - 10mmØ A 307 BOLTS
WITH NUT AND WASHER TOP CHORD
75 WITH NUT AND WASHER 300
75
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
CONSTRUCTION OF ROOFING INSTALLATION DETAILS ARCHITECT II
MISAMIS ORIENTAL FIRST PURLIN CONNECTION DETAIL S 55
MULTI-PURPOSE BUILDING, DESIGNED BY:
GIRT TO TRUSS CONNECTION DETAILS
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY,
STEEL TO CONCRETE CONNECTION JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 14 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
DETAIL ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
1.75 2.20 2.80 1.15
0.
15
OVERHEAD TANK
FLOOR LEVEL 15
10mmØ CHAIR BARS SPCD AT 300mm O.C. SECOND FLOOR FFL
14
1 - 10mmØ NOSING BAR 30
0.915
1.015
0.
30
0.25 0. 13
B9
1.60
1 2 3 4 5 6 7 8 9 10 11 12
0.20
1.10 16mmØ MAIN BARS
SPACED AT 150mm O.C.
30
0. PLAN
30
0.
LANDING 12mmØ TEMP BARS
SPACED AT 300mm O.C.
LB
12mmØ TOP AND BOTTOM BARS
SPACED AT 300mm O.C.
0.90
RAILINGS
2"Ø B.I. PIPE SCHED. 40 OVERHEAD TANK
FLOOR LEVEL
0.20
0.30
BALUSTER
2 - 16MMØ BOTTOM BARS
2"Ø B.I. PIPE SCHED. 40
2.31
MEMBERS - ANGLE BAR
40mm x 40mm x 4mm THK.
LANDING 10mmØ CHAIR BARS SPCD AT 300mm O.C.
0.
30
LB 0.
30
1 - 10mmØ NOSING BAR MAIN FRAME - ANGLE BAR
50mm x 50mm x 6mm THK.
0.
30 SEE BRACING DETAIL
0. 0.25 FOURTH FLOOR
30
1.80
0.28
3.60 2mm THK. STEEL CHECKER
PLATE
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
ARCHITECT II
CONSTRUCTION OF S
MISAMIS ORIENTAL FIRST STAIR SECTION DETAIL 56
MULTI-PURPOSE BUILDING, DESIGNED BY:
DETAIL OF REINFORCED CONCRETE RAMP
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY,
OVERHEAD TANK STAIR DETAILS JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 15 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
7m 2
2.9
7m
2.9
2.8
7m
2.9
4m
2. 97m FTB -F 1
C1
7m FTB FTB
2.8
2.9 -F 1
C1
7m FTB
4m
2.9 C1-
F1
C1
-F1
7m FTB -F1
2.9 FTB
2.8
C1
7m FTB
2.9 -F 1
4m
C1
-F1
9.4
6m 2. 97m FTB
C1-
F 1 C1
5 FTB
2.8
2. 97m FTB
C1
-F1
4m
7m FTB
2.9 F 1 -F1
C1- C1
7m FTB FTB
2.8
2.9
28.
C1 -F1
7m FTB
4m
38m
2.9 C1
-F1
-F1
7m C1
FTB
2.9 C1-
F1 FTB
2.8
7m FTB -F1
2.9
4m
C1
m -F1
2 .97 FTB
C1
-F 1 C1
FTB
2.8
m
2 .97 FTB
C1-F1
4m
7m FTB
2.9 C1
-F1
C1-
F1
7m FTB FTB
2.8
2.9 C1-
F1
7m FTB
4m
2.9 C1-
F 1
F1
C1-
FTB -F1
m FTB
2.8
C1
6.30 FTB -F1
4m
C1
m F1
1 .93 FTB
C1 -F1 C1-
FTB
2.8
-F1
C1
4m
1 F1
C1- F1
C1
-
F1 -F1 TB
C1-
-F1
C1 C1-F1
C1 F
3
2.7
-F1
FTB C1 FTB
6m
F1
C1- FTB
-F1 4m
2.7
2.9
1 1
FTB C C1
-F
FTB
m
.94
6m
-F1 TB 2
C1 F
-F1 4m
-F1 2.9
2.7
1 C1
FTB C FTB
4m
F1
2.9
6m
C1- FTB
m
16.
C1-
F1 C1 -F1
FTB 2.94
2.7
FTB
4m
59m
2.9
-F 1
C1
6m
FTB
4m
2.9
-F 1
-F1 C1 FTB
2.7
1 m
FTB C
C 1-F
1
FTB 2 .94
6m
4m
1 C1-
F1
FTB 2.9
1-F 4m
2.7
FTB C
C1
-F1
FTB 2.9
94m
6m
1
C1
-F
FTB 2.
4m
C1
-F1 TB
F 2.9
4m 69m
2.9
F 1
C1- FTB 67.
6.3
4m
-F1 TB 2.9
0m
C1 F
-F1
C1
C1
-F1 TB 2. 94m
F
4 m
2.9
-F1
F 1 C1 FTB
C1- 4m
2.2
FTB
C1-
F1
FTB 2.9
4m
4m
C1
-F1 C1-F1
FTB 2.9
2.2
FTB 4m
2.9
-F 1
6.7
C1 FTB
4m
F1 m
C1- B .94
PERIMETER FENCE FOUNDATION PLAN
3m
2
2.2
FTB FT 1
4m
2.9
4m
4m 16 18 SCALE 1:150MTS
2.9
4 2 .94
m
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
ARCHITECT II
CONSTRUCTION OF S
MISAMIS ORIENTAL FIRST 57
MULTI-PURPOSE BUILDING, DESIGNED BY:
PERIMETER FENCE FOUNDATION PLAN
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 16 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
3.00
2.50
2.50
1.00
N.G.L.
0.20
0.30
1.00
1.00
10mm THK GRAVEL BASE
(WELL COMPACTED) FOOTING TIE BEAM (FTB)
EARTH EARTH
C1-F1 PLAN
0.30
6 - 16mmØ BED BARS
SPACED EQUALLY BOTHWAYS
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
ARCHITECT II
CONSTRUCTION OF S
MISAMIS ORIENTAL FIRST 58
MULTI-PURPOSE BUILDING, FENCE COLUMN, FOOTING (C1F1) & DESIGNED BY:
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, FTB DETAILS JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 17 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
PLAN
FENCE
12mmØ @200mm
LINE CANAL COVER ROAD
5-10mmØ @200mm
12mmØ @200mm
12mmØ @200mm
12mmØ @200mm
PROJECT NAME AND LOCATION: SHEET CONTENTS: DRAFTED BY: REVIEWED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X JULIE CARR S. NALAGON
ARCHITECT II
CONSTRUCTION OF S
MISAMIS ORIENTAL FIRST 59
MULTI-PURPOSE BUILDING, DESIGNED BY:
LINED CANAL DETAILS
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, JOSHUA B. DELA PEÑA HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 18 18
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ENGINEER II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
ODILON D. OCLARET, JR. OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE: DATE:
ENGINEER II
P. PLUMBING PLAN
CONSTRUCTION OF MULTI-PURPOSE BUILDING,
BARANGAY 26, GINGOOG CITY, MISAMIS ORIENTAL (PHASE II)
EO L
PLUMBING NOTES: KEY TO SYMBOLS:
WH
-MO
FD
N LI
NE
CA
NA
TO
DP WC WATER CLOSET
1. ALL PLUMBING PLAN SPECIFICATIONS AND SHOP DRAWINGS
NA
L
NA
CA
NE
TIO
LI
SHALL MEET ALL REQUIREMENTS SET BY THE NATIONAL URI URINAL
NA
BUILDING CODE,NATIONAL PLUMBING CODE, AND THE LOCAL
L
L
NA
CA
FD FLOOR DRAIN
HIG
NE
LI
2
CODE OF CAGAYAN DE ORO CITY.
HW
LAV LAVATORY
A
L
NA
2. CONSTRUCTION NOTES AND TYPICAL DETAILS APPLY TO ALL
Y
CA
NE
LI
AY
TH
W
DRAWINGS UNLESS OTHERWISE SHOWN OR NOTED, MODIFY CO CLEAN OUT
PA AL
28.6
VTR VENT THRU ROOF
N
CA
LI
NE
N68
°00
'E
TYPICAL DETAILS AS DIRECTED TO MEET SPECIAL CONDITIONS.
24.4
3m
3m
67.9
5m
S23
AL 3. SHOP DRAWINGS WITH THE ERECTION AND PLACING OF SH SHOWER HEAD
°14
CA
N
RY
LI
NE
ITO
'E
RM PLUMBING MEMBERS SHALL BE SUBMITTED FOR THE
m
ED
DO FAU FAUCET
15.8
9m 5.00
S
AL
O PO 1 ENGINEER/DESIGNER'S APPROVAL BEFORE FABRICATION. GV GATE VALVE
N
6.00
m
NE
CA
PR ING )
LI ILD ng
1.20
m
BU MALE -Rem
aini
(FE -C-1
m
2.0
1 0.80
TR
AN
CE 1185
4. ALL PIPES SHALL BE INSTALLED AS INDICATED ON PLANS, CV CHECK VALVE
0m
EN
SI
MP
DE
RA
N AL UP
WA
CA
LI
NE
LK
LI
3
CA
CB CATCH BASIN
NA
0m
2.5
L
SI
SI
DE
L
DE
NA
DS DOWNSPOUT
WA
CA
29.9
WA
G
IN
NE
OR ENGINEER.
LK
m
R
RK A 2 .81
LK
LI
PA RE
ING 18
3m
A
ILD
O
)
BU ALE
SV SEPTIC VAULT
N2
(M
A D
LI
DE
CA
WA
12'W
NA
0m
LK
55'W
L
12.0
4mS
66° ACTUAL LOCATION, DEPTH AND INVERT ELEVATION OF ALL PIPES LINE
67.9
EXISTING PIPES AND STRUCTURES AS VERIFIED BY THE WATER LINE
EX
6.00
IT
m
MP 0m
PU M 18.8
R
RO
O
CONTRACTOR. WATER METER
WE
PO USE
M
2.60
HO
m
RN
6. PLUMBING INSTALLATION SHALL NOT IMPAIR THE STRENGTH
2.40
TE
CIS
AV ANGLE VALVE
m
3m
2.00
15.8
4
OF ANY STRUCTURAL MEMBER, COORDINATE WITH STRUCTURAL
m
W
ITH
IN APPROPRIATE FITTINGS USING PROCEDURES. SEE
MANUFACTURERS SPECIFICATIONS. Polyvinyl Chloride (PVC) series 1000.
15. CONDUCT PROPER ROUGHING-INS AND/OR WATER TEST Interior - Polyvinyl Chloride (PVC) series 1000.
PRIOR TO POURING TO ENSURE AGAINST LEAKAGE. Exterior - Polyvinyl Chloride (PVC) series 1000.
16. ALL PLUMBING FIXTURES SHALL BE AS PER ARCHITECTS
Polyvinyl Chloride (PVC) series 1000.
SPECIFICATIONS.
17. ALL PLUMBING INSTALLATIONS AS INDICTED HEREIN SHALL Polyvinyl Chloride (PVC) series 1000.
BE DONE AS PER PLANS AND SPECIFICATIONS; NO Up to 50mmØ B62, 860 Kpa Class, threaded end.
ALTERNATIONS SHALL BE DONE WITHOUT THE APPROVAL OF
Polyvinyl Chloride - PVC Compund, Galvanized Iron - Teflon tape.
THE DESIGNER; CONSULT DESIGNER AND/OR HIS
REPRESENTATIVE ON THIS REGARD. All drains & cleanouts shall be cast iron body w/ bronze/brass top.
2 LOCATION PLAN
1 13 SCALE NTS
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF SITE DEVELOPMENT PLAN
MISAMIS ORIENTAL FIRST LOCATION PLAN P 60
MULTI-PURPOSE BUILDING, MASTER PLUMBER
PLUMBING NOTES
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY,
KEY TO SYMBOLS PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 1 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
SPECIFICATION PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
A B C D E F G H I J
1 FD
FD FD FD FD FD FD
FD 1
CB CB CB CB
DS DS
LAV LAV LAV LAV LAV LAV
2 VTR
PIPE
DS DS
PIPE
VTR
2
CHASE CHASE
PIPE PIPE
CHASE CHASE
WC WC
FD FD FD FD
CB WC WC CB
DS FD FD FD FD FD FD DS
3 3
LAV STRUCTURES
VTR VTR LAV
CB
DS DS
CB
LAV VTR VTR LAV
WC WC
FD FD FD FD
VTR VTR
PIPE PIPE
CHASE CHASE
7 LAV
DS DS
LAV
7
CB CB CB CB
8 DS VTR
DS DS
DS 8
TO PUBLIC TO PUBLIC
STORM DRAINAGE STORM DRAINAGE
A B C D E F G H I J
WASTE DISTRIBUTION LAYOUT
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 61
MULTI-PURPOSE BUILDING, WASTE DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, GROUND FLOOR PLAN PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 2 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
A B C D E F G H I J
18.80 18.80
1.50 5.40 5.00 5.40 1.50 1.50 5.40 5.00 5.40 1.50
1.65 1.70 1.65 1.00 1.00 1.65 1.70 1.65
1 FD
FD FD FD FD FD FD
FD 1
3.00
3.00
PIPE LAV LAV LAV LAV LAV LAV PIPE
DS DS
2 CHASE
VTR
DS DS
VTR
CHASE
2
8.00
8.00
PIPE PIPE
CHASE CHASE
5.00
WC WC
FD FD FD FD
WC WC
DS FD FD FD FD FD FD DS
3 3
3.00
3.00
4 4
24.00
24.00
8.00
8.00
PIPE PIPE PIPE PIPE
EXISTING
CHASE CHASE CHASE CHASE
LAV STRUCTURES
VTR VTR LAV LAV VTR VTR LAV
5.00
5.00
5 5
WC WC WC WC
FD FD FD FD FD FD FD FD
WC WC WC WC
DS FD FD FD FD FD FD FD FD FD FD FD FD DS
6 FD FD 6
WC WC
FD FD FD FD
WC WC
FD FD FD FD
5.00
5.00
VTR
PIPE PIPE
CHASE CHASE
8.00
8.00
7 LAV
DS DS
LAV
7
3.00
3.00
8 DS DS DS DS 8
A B C D E F G H I J
WASTE DISTRIBUTION LAYOUT
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 62
MULTI-PURPOSE BUILDING, WASTE DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, SECOND FLOOR PLAN PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 3 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
A B C D E F G H I J
18.80 18.80
1.50 5.40 5.00 5.40 1.50 1.50 5.40 5.00 5.40 1.50
1.65 1.70 1.65 1.00 1.00 1.65 1.70 1.65
1 3.00
FD
FD FD FD FD FD FD
FD 1
3.00
PIPE LAV LAV LAV LAV LAV LAV PIPE
DS DS
2 CHASE
VTR
DS DS
VTR
CHASE
2
8.00
8.00
PIPE PIPE
CHASE CHASE
5.00
WC WC
FD FD FD FD
WC WC
DS FD FD FD FD FD FD DS
3 3
3.00
3.00
4 4
24.00
24.00
8.00
8.00
PIPE PIPE PIPE PIPE
EXISTING
CHASE CHASE CHASE CHASE
LAV STRUCTURES
VTR VTR LAV LAV VTR VTR LAV
5.00
5.00
5 5
WC WC WC WC
FD FD FD FD FD FD FD FD
WC WC WC WC
DS FD FD FD FD FD FD FD FD FD FD FD FD DS
6 FD FD 6
WC WC
FD FD FD FD
WC WC
FD FD FD FD
5.00
5.00
VTR
PIPE PIPE
CHASE CHASE
8.00
8.00
7 LAV
DS DS
LAV
7
3.00
3.00
8 DS DS DS DS 8
A B C D E F G H I J
WASTE DISTRIBUTION LAYOUT
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 63
MULTI-PURPOSE BUILDING, WASTE DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, THIRD FLOOR PLAN PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 4 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
A B C D E F G H I J
18.80 18.80
1.50 5.40 5.00 5.40 1.50 1.50 5.40 5.00 5.40 1.50
1 FD FD FD FD
1
FD LAV LAV LAV LAV FD FD LAV LAV LAV LAV FD
3.00
3.00
WC WC WC WC WC WC WC WC
8.00
5.00
5.00
DS DS
3 3
3.00
3.00
4 4
24.00
24.00
8.00
8.00
EXISTING
STRUCTURES
5.00
5.00
5 5
DS DS
6 6
5.00
5.00
8.00
8.00
FD FD
7 DS DS 7
3.00
3.00
8 DS DS DS DS 8
A B C D E F G H I J
WASTE DISTRIBUTION LAYOUT
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 64
MULTI-PURPOSE BUILDING, WASTE DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, FOURTH FLOOR PLAN PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 5 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
A B C D E F G H I J
49.60
1.50 5.40 5.00 5.40 5.00 5.00 5.00 5.40 5.00 5.40 1.50
1.70 1.70
1.65 (CLEAR) 1.65 1.00 1.35 1.50 1.50 1.35 1.00 1.65 (CLEAR) 1.65
RISER
1 1
3.00
3.00
CISTERN
PIPE PIPE
CHASE CHASE
LAV LAV LAV LAV LAV LAV RISER
2 2
8.00
8.00
PIPE PIPE
CHASE CHASE
LAV LAV
5.00
5.00
WC WC
SHO SHO
HB HB
WC SHO SHO WC
3 3
3.00
3.00
4 4
24.00
24.00
8.00
8.00
PIPE PIPE PIPE PIPE
EXISTING
2.50
2.50
CHASE CHASE CHASE CHASE
2.50
WC
WC
6 6
SHO WC WC SHO
SHO SHO
WC WC
5.00
5.00
LAV LAV
8.00
8.00
PIPE PIPE
CHASE CHASE
7 HB
LAV LAV
HB
7
SHO
3.00
3.00
LAV
WC
8 8
1.50 5.40 5.00 5.40 5.00 5.00 5.00 5.40 5.00 5.40 1.50
49.60
A B C D E F G H I J
WATER DISTRIBUTION LAYOUT
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 65
MULTI-PURPOSE BUILDING, WATER DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, GROUND FLOOR PLAN PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 6 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
A B C D E F G H I J
18.80 18.80
1.50 5.40 5.00 5.40 1.50 1.50 5.40 5.00 5.40 1.50
1.65 1.70 1.65 1.00 1.00 1.65 1.70 1.65
RISER
1 1
3.00
3.00
PIPE PIPE
CHASE CHASE
LAV LAV LAV LAV LAV LAV RISER
2 2
8.00
8.00
PIPE PIPE
CHASE CHASE
LAV LAV
5.00
5.00
WC WC
SHO SHO
WC SHO SHO WC
3 3
3.00
3.00
4 4
24.00
24.00
8.00
8.00
PIPE PIPE PIPE PIPE
EXISTING
CHASE CHASE CHASE CHASE
5.00
5 5
WC WC WC WC
SHO SHO SHO SHO
6 6
SHO WC WC SHO
SHO SHO
WC WC
5.00
5.00
LAV LAV
8.00
8.00
7 LAV LAV
7
3.00
3.00
8 8
A B C D E F G H I J
WATER DISTRIBUTION LAYOUT
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 66
MULTI-PURPOSE BUILDING, WATER DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, SECOND FLOOR PLAN PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 7 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
A B C D E F G H I J
18.80 18.80
1.50 5.40 5.00 5.40 1.50 1.50 5.40 5.00 5.40 1.50
1.65 1.70 1.65 1.00 1.00 1.65 1.70 1.65
RISER
1 1
3.00
3.00
PIPE PIPE
CHASE CHASE
LAV LAV LAV LAV LAV LAV RISER
2 2
8.00
8.00
PIPE PIPE
CHASE CHASE
LAV LAV
5.00
5.00
WC WC
SHO SHO
WC SHO SHO WC
3 3
3.00
3.00
4 4
24.00
24.00
8.00
8.00
PIPE PIPE PIPE PIPE
EXISTING
CHASE CHASE CHASE CHASE
5.00
5 5
WC WC WC WC
SHO SHO SHO SHO
6 6
SHO WC WC SHO
SHO SHO
WC WC
5.00
5.00
LAV LAV
8.00
8.00
7 LAV LAV
7
3.00
3.00
8 8
A B C D E F G H I J
WATER DISTRIBUTION LAYOUT
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 67
MULTI-PURPOSE BUILDING, WATER DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, THIRD FLOOR PLAN PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 8 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
A B C D E F G H I J
18.80 18.80
1.50 5.40 5.00 5.40 1.50 1.50 5.40 5.00 5.40 1.50
RISER
1 FAU FAU FAU FAU
1
3.00 WC WC LAV LAV LAV LAV WC WC WC WC LAV LAV LAV LAV WC WC
3.00
PIPE PIPE
CHASE URI URI URI URI CHASE
RISER
2 2
8.00
8.00
RISER RISER
5.00
5.00
3 3
3.00
3.00
4 4
24.00
24.00
8.00
8.00
EXISTING
STRUCTURES
RISER RISER RISER RISER
5.00
5.00
5 5
6 6
5.00
5.00
RISER RISER
8.00
8.00
7 7
3.00
3.00
8 8
A B C D E F G H I J
WATER DISTRIBUTION LAYOUT
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 68
MULTI-PURPOSE BUILDING, WATER DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, FOURTH FLOOR PLAN PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 9 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE:
VTR
FD
FD
CHPIP
AS E
E
WC
DS
UR WC
I U
RI WC
LA
V
LA
V
FD VTR LAV
DS LA
V
CHPIP WC
AS E
E FD WC
WC FD
DS
FD
LA FD
V
VTR LA
V
LA
VTR FD V FD
DS DS
CHPIP
AS E T
E SEO PU FD
WE BL
DS R S IC
VTR TO TO
D
LRAM DPUB FD FD S
V R LIC
LAAINA CHPIP
V GE AS E
LA E
V FD
DS DS LA
FD V
FD WC
DS FD WC
FD FD
LA CHPIPCHPIP
V AS E AS E DS FD FD
FD E E DS
FD WC LA FD FD
F V
FD D FD CHPIP CHPIP
FD WC AS E LA AS E
E V E
WC FD LA
DS LA V LA FD
WC FD DS V V
FD FD WC
WC
FD FD
FD WC WC D
FD S
FD CHPIP
C PI LA AS EF FD
FD HASPE V E D FD FD DS
E VTR
FD WC FD FD
F
FD D FD CHPIP
FD LA
WC FD AS E CHPIP FD
V DS E AS E FD
WC FD E
LA ST WC
DS WC FD
FD V LA
V ORTO P
WC FD M UB WC
FD WC DR LI
DS FD WC AIN C DS WC
FD WC AG
E LA
V
CHPIFPD LA CHPIP F LA
A E V AS E D FD FD DS V
FD SE E FD LA
V VTR
FD VTR LA
FD WC FD V
F
LA FD D FD CHPIP
FD V WC DS AS E VTR WC
FD E WC
WC
LA UR WC
WC FD V
FD WC I U FD
FD DS DFS FD RI
DS FD D CHPIP FD
WC LA AS E
FD ST V E
CHPIP ORTO P DS
AS E FD FD F W
MC UB FD
E DS D VTR FD DR LI CHPIP
LA FD WC FD AIN C AS E
V AG E
FD E LA
DS V FD
DS LA
V
DS
LA FD
V
DS FD
FD FDDS CHPIP
LA CHPIP LA
V AS E F V AS E
FD E D E DS
WC WC FD
DS FD FD CHPIP
WC FD CHPIP WC FD AS E
AS E E
FD E FD LA
DS V FD
LA LA
DS V V
FD WC DS DS
LA FD
WC FD V
DS FD P FD
FD
LA WC CHAIPE FD
V LA CHPIP
FD CHPIP FD W S
FDEFDF FD V AS E
E
DS
ST AS E WC C D
ORTO P DS FD E FD WC CHPIP
M UB LA CFHDPIP FD AS E
DR LI WC FD FD E
AIN C
V AS E W FD
E C
AG FD FD
E FD LA
LA V FD
DS DS V ST
FD W
C DS DS
LA
V ORTO P
M UB
FD W LA FD DR LI
C V AIN C
FD W AG TO
FD C C PIP F SEE PU
CHPIP L HA F E D FD WE BL
FD FD W AV SD DS R IC
AS E C E
E FD CHPIP
DS FD WC AS E
LA FD
V WC FD CHPIP E
FD AS E
FD E
DS DS LA
FD W V
ST T DS DS
OR O P C
M UB FD W
DR LI C
AIN C FD W
AG C
E F
CHPIP FD W FD D FD
WASTE DISTRIBUTION LAYOUT AS E
E
C FD
FD
1 ISOMETRIC LAYOUT LA
V DS
FD
DS
10 13 SCALE NTS
DS
DESIGNED BY
PROJECT NAME AND LOCATION: SHEET CONTENTS: MASTER PLUMBER (SIGNED & SEALED) PREPARED: SUBMITTED: RECOMMENDED: APPROVED: SET NO. SHEET NO.
REPUBLIC OF THE PHILIPPINES
DEPARTMENT OF PUBLIC WORKS AND HIGHWAYS
REGIONAL OFFICE X
CONSTRUCTION OF P
MISAMIS ORIENTAL FIRST 69
MULTI-PURPOSE BUILDING, WASTE DISTRIBUTION LAYOUT - MASTER PLUMBER
DISTRICT ENGINEERING OFFICE BARANGAY 26, GINGOOG CITY, ISOMETRIC LAYOUT PRC: VALIDITY: JULIE CARR S. NALAGON HAROLD C. CAERMARE MARCELINO O. CABEGUIN, JR., A.E.R. MARIVEL FRANCES L. ONG, A.E.R. 10 13
GINGOOG CITY, MISAMIS ORIENTAL MISAMIS ORIENTAL (PHASE II) ARCHITECT II CHIEF, PLANNING AND DESIGN SECTION DISTRICT ENGINEER
108
PTR: DATE: OIC-ASSISTANT DISTRICT ENGINEER
DATE: DATE: DATE:
TIN: PLACE: