Boq 20 Classroom Unit Cost Analysis
Boq 20 Classroom Unit Cost Analysis
A. EIGHT-
CLASSROOMS
I. Mobilization /
l.s 1
Demobilization
II. Temporary
mo 8
Facilities
IV. Earthworks
Item 803(1)
Excavation and m³ 1,219.43
Footing & Wall Footing
Item 804(1)a
Backfilling of m³ 874.78
Excavated Materials
Item 804(1)b
m³ 87.14
Embankment
Item 8004(3) Gravel
Bedding @ CF, WF, TG, m³ 60.48
SOF
V. Termite Control
Works
Item 404(1)a
Reinforcing Steel for kg 34,351.67
Column Footing & WF
Item 900(1)c2 R.C. for
SOF, Corridor and m³ 58.16
Ramp
Item 1046(2)a1
Masonry Units (100m m² 447.5
Wall)
Item 1046(2)a2
Masonry Units (150m m² 1,558.86
Wall)
VIII. Fabricated
Materials and
Hardwares
Item 1010(1)b
50x150mm thk.
Mahogany Jamb with set 40
Fixed Clear Glass
Transom (D-1)
Item 1010(1)
50x150mm thk.
set 2
Mahogany Door Jamb
(D-2)
Item 1010(1)
50x100mm thk. set 5
Mahogany Jamb (D-4)
Item 1010(1)b
50x100mm Hollow
set 18
Core Flush Type Door
Jamb (BD-1)
Item 1018(1)
200x200mm Vitrified
m² 264.9
Glazed Tiles Wall
Finish
Item 1018(2)
200x200mm Vitrified
m² 526.9
Unglazed Tiles Floor
Finish
X. Carpentry Works
Item 1032(1)a
m² 8,267.71
Masonry Painting
Item 1032(1)b
m² 373.84
Wooden Painting
XIV. Plumbing /
Sanitary Works
Item 1001(9)
Downspout/Storm l.s. 1
Drainage