0% found this document useful (0 votes)
18 views

Schedule Rectify Tube sheet 206-E-001A

Uploaded by

prasetiyo87budi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

Schedule Rectify Tube sheet 206-E-001A

Uploaded by

prasetiyo87budi
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Date : 26 Nov 2023

SCHEDULE RECTIFIE 206-E-001A Rev. 0


NOZZLE MODIFICATION PROJECT

ID Task Name Duration % Start Finish Nov 26, '23 Dec 3, '23 Dec 10, '23
Complete S S M T W T F S S M T W T F S S M T W T F
1 MILLESTONE 16 days 0% Tue 11/28/23 Thu 12/14/23

2 Rectifie Item 206-E-001A 16 days 0% Tue 11/28/23 Thu 12/14/23

3 Refacing Tube Sheet Out Sitde 2 days 0% Tue 11/28/23 Wed 11/29/23

4 Refacing Tube Sheet In Side 2 days 0% Wed 11/29/23 Fri 12/1/23

5 Insert Tube Bundle To Sheel 1 day 0% Fri 12/1/23 Sat 12/2/23

6 Install Channel & Insert Bolt & Nut 1 day 0% Sat 12/2/23 Mon 12/4/23

7 Tightening Bolt manual and with machine 1 day 0% Mon 12/4/23 Tue 12/5/23

8 Check Gab and Offset Nozzle N-F and N-G 1 day 0% Tue 12/5/23 Wed 12/6/23

9 Rectifie Nozzle N-F 8 days 0% Wed 12/6/23 Thu 12/14/23

10 cutting Flange from Neck 1 day 0% Wed 12/6/23 Wed 12/6/23

11 Bevell & Fit Up Flange to Neck 2 days 0% Thu 12/7/23 Fri 12/8/23

12 Welding 2 days 0% Fri 12/8/23 Mon 12/11/23

13 NDT Welding Flange To Neck 1 day 0% Mon 12/11/23 Tue 12/12/23

14 Insert Bolt N-F & N-G 1 day 0% Tue 12/12/23 Wed 12/13/23

15 Tightening Bolt, Manual and Machine 1 day 0% Wed 12/13/23 Thu 12/14/23

Task Milestone External Tasks


Project: Schedule Rectifie
Split Summary External Milestone
Date: Sun 11/26/23
Progress Project Summary Deadline