protection schem
protection schem
Setting
No Description Page
Attachment
3 Single Line Diagram
9 PSS Study
Cadangan Stesen Janakuasa Elektrik Sekam Padi 9.95MW Naka Kedah Untuk
Tetuan Majunaka Eco Energy
Prepared by :
Erni Bt Abdul Ghani
Jurutera Projek
IFME Consultants Sdn Bhd
Generator
Size 9.95 KW
Voltage 11000 V
Full Load Current 653 A
Power Factor 0.8 lag to 0.9 lead
Xd"(SAT) 19.4 %
Transformer
Voltage Primary 33000 V
Voltage Secondary 11000 V
Rating 12.5 MVA
Vector Group Dyn11
Impedence 8.35 %
Cable
Cable Length 1.3 KM
Cable Type 150mmsq 3C AL/XLPE/SCT/PVC/ABC
Resistance per km 0.206 ohm/km
Reactance per km 0.123 ohm/km
b) Cable
For the 33kV 150 ABC cable the following data are obtained from manjfacturer
Resistance per km = 0.206 ohm/km
Reactance per km = 0.123 ohm/km
Cable length = 1.3 km
= √(Resistance^2 + Reactance^2)
Impedance per km , Z
Z = 0.240
Total Z 0.312 at cable length given
c) Transformer
MVA tx = S = 12.5
Z pu (impedance) 0.0835
= 149.7 MVA
d) Generator
The Generator operate at between pf 0.8 lagging and 0.9 leading
power factor avg = 0.8 as average power factor
Real power = 9.95 MW
Zpu = X"d (sat) = 19.4 % = 0.19
S = Apparent Power = Real power = 12.4375 MVA
pf
The fault at a point is calculated by summing the MVA sources feeding to the point with the parallel
resistance method used to combined MVA sources from the same feeder in the same direction.
Fault
Point MVA current If
(KA)
A 127.2 2.23
B/C 125.8 2.20
D/E 116.7 6.12
A = 13.72 MW
B = 9.60 MW
C = 10.15 MW
D = 10.36 MW
E = 10.97 MW
OC
Load
I MW V LOC. ct size MW volt
current
A 13.72 33000 300.0 A 600.0 13.72 33000
B 9.60 33000 210.0 B 600.0 9.60 33000
C 10.15 33000 222.0 C 600.0 10.15 33000
D 10.36 11000 680.0 D 800.0 10.36 11000
E 10.97 11000 720.0 E 800.0 10.97 11000
The setting are calculated from location A (TNB PPU Naka ) with the TMS selected as 0.18 which is standard
for TNB. Based on the load current of 300A
tE = 0.18 x 0.14
((2230/300)^0.02-1)
tE = 0.62
Relay downstream from E are graded with suitable trip time diffrentiation and ther TMS calculated by adjusting the formula. The
trip time at B should be faster than A. The trip time at C,D & E are progressively slower than B.
Nearest
Max Fault t= time to
Location Load Current (A) setting Ir=F/S p TMS
Current (A) trip
current (A)
As the TMS will be set in steps of 0.05 the calculated TMS is rounded to the nearest 0.01. The E/F relay is set at 10%,0.2 for
location A as per refer TNB data given.
a) Power loss at Fiah 11kV and switchgears and PPPU NAKA= negligible
The MV and LV currents are calculated from the above loss using , I = (kVA x 1000)/ (√3xV)
The primary current at 109.4kVA , 33000V = 1.21 A
The relay is set to nearest higher setting i.e 1% of 300/5 CT ratio = 1.21 A
7.OTHER RELAYS
Over/Under Voltage Relay
Over Voltage Setting Under Voltage Setting
% of % of
Relay Loc Voltage Value (V) Value (V)
Nominal Nominal
Frequency % of % of
Relay Loc Value (V) Value (V)
(Hz) Nominal Nominal
Vector Switch
ROCOF
Relay Loc Shift on time
Setting
Setting delay
D 3Hz/sec 8 degrees 1.5 sec
TMS
setting
0.18
0.14
0.16
0.17
0.18
et at 10%,0.2 for
E/F RELAY
TMS
0.14
0.1
0.1
0.1
0.1
@0.8 pf
kVA
VA
Appendix 1
17| Page
Appendix 5
11KV SWITCHGEAR FiAH SITE POWE
18| Page
Appendix 6
33KV SWITCHGEAR FiAH SITE
Appendix 7
Appendix 8
POWER SYSTEM STUDY
Protection Coordination Study And Protection
Setting
Prepared by :
Erni Bt Abdul Ghani
Jurutera Projek
IFME Consultants Sdn Bhd
Reference taken from PSS from TNB on the proposed of 7.9MW biomas at PPU Naka
Short curcuit current base on at connection point at PPU Naka is = 1.45 kA
Voltage = 33000
a) Grid
MVA = √3 x V x Isc
= 82.9 MVA
b) Cable
For the 33kV 150 ABC cable the following data are obtained from manjfacturer
Resistance per km = 0.206 ohm/km
Reactance per km = 0.123 ohm/km
Cable length = 1.3 km
c) Transformer
MVA tx = S = 12.5
Z pu (impedance) 0.0835
= 149.7 MVA
d) Generator
The Generator operate at between pf 0.8 lagging and x leading
power factor avg = 0.8 as average power factor
Real power = 9.95 MW
Zpu = X"d (sat) = 19.4 % = 0.19
S = Apparent Power = Real power = 12.4375 MVA
pf
Fault
Point MVA current If
(KA)
A 127.2 2.23
B/C 125.8 2.20
D/E 116.7 6.12
3. LOAD CURRENT CALCULATION
Load
I MW V
current
A 9.95 33000 217.6 10 30 1371.744
B 8.3 33000 181.5 4 12 548.6976
C 8.7 33000 190.6 5 15 685.872
D 9.2 11000 600.4 5 40 609.66
E 9.95 11000 652.8 5 40 609.66
A 2.23 217.6
B 2.20 181.5
C 2.20 190.6
D 6.12 600.4
E 6.12 652.8
The setting are calculated from location E (TNB PPU Naka ) with the TMS selected as 0.25 which is
standard for TNB. Based on the load current of 218.7A we add 10% to allow for transient peaks.
tE = 0.25 x 0.14
((2230/245)^0.02-1)
tE = 0.78
Relay downstream from E are graded with suitable trip time diffrentiation and ther TMS calculated by adjusting
the formula. The trip time at B should be faster than A. The trip time at C,D & E are progressively slower than
B.
Primary
Max Fault Load Nearest
setting t= time to TMS
Location Current Current setting Ir=F/S p TMS
Current trip setting
(A) (A) current (A)
(A)
A 2225 217.6 239.4 240 9.272 3.07 0.78 0.2524 0.25
B 2202 181.5 199.7 200 11.009 2.85 0.13 0.0456 0.05
C 2202 190.6 209.7 210 10.484 2.91 0.27 0.0928 0.1
D 6123 600.4 660.4 661 9.263 3.08 0.45 0.1463 0.15
E 6123 652.8 718.1 719 8.516 3.20 0.47 0.15 0.15
** selected based on TNB setting
As the TMS will be set in steps of 0.05 the calculated TMS is rounded to the nearest 0.01. The E/F relay is set
at 10%,0.2 for location A as per refer TNB data given.
a) Power loss at Fiah 11kV and switchgears and PPPU NAKA= negligible
d)POwer loss in 33kV cable from part 1 the cable resistence is = 0.206 ohm/km
Resistence of 1.3km length = 0.206 x 1.3 = 0.2678
Power loss = 3i^2R = 22450.1697 w
= 22.5 kW
For RPR setting we request for twice the calculated value to allow for margin of error, low power factor and
more stable operation.
Hence the power loss for RPR setting = total power loss x 2 = 61 kW
= 77 kVA @0.8 pf
The MV and LV currents are calculated from the above loss using , I = (kVA x 1000)/ (√3xV)
Current Setting
7.OTHER RELAYS
Over/Under Voltage Relay
Over Voltage Setting Under Voltage Setting
Relay % of % of
Voltage Value (V) Value (V)
Loc Nominal Nominal
Relay Frequency % of % of
Value (V) Value (V)
Loc (Hz) Nominal Nominal
Vector Switch
Relay ROCOF
Shift on time
Loc Setting
Setting delay
D 3Hz/sec 8 degrees 1.5 sec
PLUG IN