ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
GENERAL REQUIREMENTS
1 Supervision 1 LS 0% 1 $ - $ - $ -
2 Permits 1 LS 0% 1 $ - $ - $ -
3 Final Clean-up 1 LS 0% 1 $ - $ - $ -
4 Mobilization Costs 1 LS 0% 1 $ - $ - $ -
5 Project Overheads 1 LS 0% 1 $ - $ - $ -
6 Bonds 1 LS 0% 1 $ - $ - $ -
7 Temporary Control & Facilities 1 LS 0% 1 $ - $ - $ -
Subtotal (General Requirements) $0
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
First Floor
Interior Wall "F3" @ (11'-6" H,449 LF)
86 (5/8") Gypsum Wall Board 5164 SF 10% 5680 $ 1.20 $ 0.80 $ 11,361
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
(6") Interior Wall @ (11'-6" H,6 LF)
99 (6") Metal Stud @ 16" O.C (5 EA,52 LF) 69 SF 10% 76 $ 3.00 $ 2.00 $ 380
100 (5/8") Gypsum Wall Board 138 SF 10% 152 $ 1.20 $ 0.80 $ 304
101 Insulation (As Required) 69 SF 10% 76 $ 0.90 $ 0.60 $ 114
102 Acoustical Sealant 24 LF 10% 26 $ 1.10 $ 0.90 $ 53
103 (6") Top Runner 6 LF 10% 7 $ 4.00 $ 3.00 $ 46
104 (6") Bottom Runner 6 LF 10% 7 $ 4.00 $ 3.00 $ 46
Second Floor
(3-5/8") Interior Wall @ (11'-6" H,345 LF)
117 (3-5/8") Metal Stud @ 16" O.C (260 EA,2984 LF) 3968 SF 10% 4365 $ 3.00 $ 2.00 $ 21,824
118 (5/8") Gypsum Wall Board 7936 SF 10% 8730 $ 1.20 $ 0.80 $ 17,459
119 Insulation (As Required) 3968 SF 10% 4365 $ 0.90 $ 0.60 $ 6,547
120 Acoustical Sealant 1380 LF 10% 1518 $ 1.10 $ 0.90 $ 3,036
121 (3-5/8") Top Runner 345 LF 10% 380 $ 4.00 $ 3.00 $ 2,657
122 (3-5/8") Bottom Runner 345 LF 10% 380 $ 4.00 $ 3.00 $ 2,657
Ceiling
Basement Level
130 Gypsum Board Ceiling 1123 SF 10% 1235 $ 3.50 $ 2.50 $ 7,412
(2X2) Acoustical Ceiling Tile "ACT-1"
131 Manf: USG Ceiling 5733 SF 10% 6306 $ 4.00 $ 3.00 $ 44,144
Color: White
(2X4) Acoustical Ceiling Tile "ACT-3"
132 Manf: Armstrong 1101 SF 10% 1211 $ 4.00 $ 3.00 $ 8,478
Color: White
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
Subtotal (Finishes) $802,855
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
290 (8") Dia Duct 162 LF 10% 178 $ 18.00 $ 10.00 $ 4,990
291 (14") Dia Duct 166 LF 10% 183 $ 24.00 $ 12.00 $ 6,574
292 (16x10) Duct 166 LF 10% 183 $ 24.00 $ 12.00 $ 6,574
293 (16x16) Duct 129 LF 10% 142 $ 25.00 $ 12.00 $ 5,250
294 (18x14) Duct 34 LF 10% 37 $ 27.00 $ 12.00 $ 1,459
295 (24x14) Return Air Duct 10 LF 10% 11 $ 32.00 $ 14.00 $ 506
296 (3/4") Condensate Drain Pipe 120 LF 10% 132 $ 6.00 $ 3.00 $ 1,188
Roof Level
297 (3/4") Condensate Drain Pipe 202 LF 10% 222 $ 6.00 $ 3.00 $ 2,000
Equipment
Condensing Unit "CU-1"
298 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR6036N
Condensing Unit "CU-2"
299 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR6036N
Condensing Unit "CU-3"
300 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR4018
Condensing Unit "CU-4"
301 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR4018
Condensing Unit "CU-5"
302 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR6024
Condensing Unit "CU-6"
303 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR6024
Condensing Unit "CU-7"
304 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR6024
Condensing Unit "CU-8"
305 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR4018
Condensing Unit "CU-9"
306 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR6024
Condensing Unit "CU-10"
307 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR6024
Condensing Unit "CU-11"
308 Manf :Trane 1 EA 0% 1 $ 2,500.00 $ 500.00 $ 3,000
Model #: 4TTR6024
Furnance "F-1"
Manf: Trane
313 1 EA 0% 1 $ 3,500.00 $ 500.00 $ 4,000
Model #: 4PXC-S9V2B
CFM: 1200
Furnance "F-2"
Manf: Trane
314 1 EA 0% 1 $ 3,500.00 $ 500.00 $ 4,000
Model #: 4PXC-S9V2B
CFM: 1200
Furnance "F-3"
Manf: Trane
315 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4PXC-S9V2B
CFM: 600
Furnance "F-4"
Manf: Trane
316 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4PXC-S9V2B
CFM: 600
Furnance "F-5"
Manf: Trane
317 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4TXC-S9V2B
CFM: 800
Furnance "F-6"
Manf: Trane
318 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4TXC-S9V2B
CFM: 800
Furnance "F-7"
Manf: Trane
319 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4TXC-S9V2B
CFM: 800
CLIENT'S INFORMATION:
PROJECT ID: St Cloud Behavioral Health CONTACT:
Address 302 5th Ave S ST. CLOUD, MN E-MAIL ADDRESS:
SCOPE: Everything PHONE NUMBER:
Date: 7/25/2024
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
Furnance "F-8"
Manf: Trane
320 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4PXC-S9V2B
CFM: 600
Furnance "F-9"
Manf: Trane
321 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4TXC-S9V2B
CFM: 800
Furnance "F-10"
Manf: Trane
322 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4TXC-S9V2B
CFM: 800
Furnance "F-11"
Manf: Trane
323 1 EA 0% 1 $ 3,000.00 $ 500.00 $ 3,500
Model #: 4TXC-S9V2B
CFM: 800
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
Power
Basement Level
341 Occupancy Sensor 15 EA 0% 15 $ 200.00 $ 100.00 $ 4,500
342 Single Way Switch 4 EA 0% 4 $ 100.00 $ 50.00 $ 600
343 TV Outlet 6 EA 0% 6 $ 200.00 $ 100.00 $ 1,800
344 Data Outlet 21 EA 0% 21 $ 200.00 $ 100.00 $ 6,300
345 Single Way Switch 6 EA 0% 6 $ 100.00 $ 50.00 $ 900
346 Three Way Switch 6 EA 0% 6 $ 120.00 $ 50.00 $ 1,020
347 Disconnect Switch 9 EA 0% 9 $ 200.00 $ 100.00 $ 2,700
348 Duplex Receptacle 59 EA 0% 59 $ 200.00 $ 100.00 $ 17,700
349 Special Receptacle 13 EA 0% 13 $ 220.00 $ 100.00 $ 4,160
350 GFI Duplex Receptacle 17 EA 0% 17 $ 220.00 $ 100.00 $ 5,440
351 Quad Duplex Receptacle 1 EA 0% 1 $ 220.00 $ 100.00 $ 320
Panel "B1"
Phase: 3
352 1 EA 0% 1 $ 1,800.00 $ 500.00 $ 2,300
Wire: 4
Main Ratings: 225A
Panel "B2"
Phase: 3
353 1 EA 0% 1 $ 1,800.00 $ 500.00 $ 2,300
Wire: 4
Main Ratings: 225A
Panel "K"
Phase: 3
354 1 EA 0% 1 $ 1,800.00 $ 500.00 $ 2,300
Wire: 4
Main Ratings: 225A
Panel "R1"
Phase: 3
355 1 EA 0% 1 $ 1,800.00 $ 500.00 $ 2,300
Wire: 4
Main Ratings: 225A
356 Allowances For Wiring & Conduits 9716 SF 10% 10688 $ 0.90 $ 0.80 $ 18,169
First Floor
357 Data Outlet 37 EA 0% 37 $ 200.00 $ 100.00 $ 11,100
358 TV Outlet 4 EA 0% 4 $ 200.00 $ 100.00 $ 1,200
359 Floor Box 1 EA 0% 1 $ 150.00 $ 100.00 $ 250
360 Occupancy Sensor 33 EA 0% 33 $ 200.00 $ 100.00 $ 9,900
361 Single Way Switch 3 EA 0% 3 $ 100.00 $ 50.00 $ 450
362 Three Way Switch 4 EA 0% 4 $ 120.00 $ 50.00 $ 680
363 Disconnect Switch 23 EA 0% 23 $ 200.00 $ 100.00 $ 6,900
364 Duplex Receptacle 133 EA 0% 133 $ 200.00 $ 100.00 $ 39,900
365 Special Receptacle 5 EA 0% 5 $ 220.00 $ 100.00 $ 1,600
366 GFI Duplex Receptacle 9 EA 0% 9 $ 220.00 $ 100.00 $ 2,880
367 Quad Duplex Receptacle 14 EA 0% 14 $ 220.00 $ 100.00 $ 4,480
Panel "R2"
Phase: 3
368 1 EA 0% 1 $ 1,800.00 $ 500.00 $ 2,300
Wire: 4
Main Ratings: 225A
Panel "M1"
Phase: 3
369 1 EA 0% 1 $ 1,800.00 $ 500.00 $ 2,300
Wire: 4
Main Ratings: 225A
Panel "M2"
Phase: 3
370 1 EA 0% 1 $ 1,800.00 $ 500.00 $ 2,300
Wire: 4
Main Ratings: 225A
371 Allowances For Wiring & Conduits 9822 SF 10% 10804 $ 0.90 $ 0.80 $ 18,367
Second Floor
372 Data Outlet 7 EA 0% 7 $ 200.00 $ 100.00 $ 2,100
373 TV Outlet 1 EA 0% 1 $ 200.00 $ 100.00 $ 300
374 Disconnect Switch 4 EA 0% 4 $ 200.00 $ 100.00 $ 1,200
375 Duplex Receptacle 64 EA 0% 64 $ 200.00 $ 100.00 $ 19,200
376 Occupancy Sensor 5 EA 0% 5 $ 200.00 $ 100.00 $ 1,500
377 Special Receptacle 2 EA 0% 2 $ 220.00 $ 100.00 $ 640
378 GFI Duplex Receptacle 9 EA 0% 9 $ 220.00 $ 100.00 $ 2,880
379 Quad Duplex Receptacle 3 EA 0% 3 $ 220.00 $ 100.00 $ 960
Panel "R3"
Phase: 3
380 1 EA 0% 1 $ 1,800.00 $ 500.00 $ 2,300
Wire: 4
Main Ratings: 225A
381 Single Way Switch 8 EA 0% 8 $ 100.00 $ 50.00 $ 1,200
382 Three Way Switch 10 EA 0% 10 $ 120.00 $ 50.00 $ 1,700
383 Allowances For Wiring & Conduits 7995 SF 10% 8795 $ 0.90 $ 0.80 $ 14,951
Roof Level
384 GFI Duplex Receptacle 4 EA 0% 4 $ 220.00 $ 100.00 $ 1,280
385 Disconnect Switch 8 EA 0% 8 $ 200.00 $ 100.00 $ 2,400
Lighting Fixture
Basement Level
Emergency Wall/ Ceiling Lighting Fixture "E1"
386 Manf: Hubbell Gual Lite 5 EA 0% 5 $ 350.00 $ 150.00 $ 2,500
Model #: LZ-2-I-03L
Emergency Recessed Ceiling Lighting Fixture "E2"
387 Manf: Hubbell Gual Lite 4 EA 0% 4 $ 350.00 $ 150.00 $ 2,000
Model #: W-RA-D
(12") Slim round Surface Mounted Lighting Fixture "F1"
388 Manf: Halo 52 EA 0% 52 $ 300.00 $ 150.00 $ 23,400
Model #: SMD12R-20 9S-WH-UNV-MMB
CLIENT'S INFORMATION:
PROJECT ID: St Cloud Behavioral Health CONTACT:
Address 302 5th Ave S ST. CLOUD, MN E-MAIL ADDRESS:
SCOPE: Everything PHONE NUMBER:
Date: 7/25/2024
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
ITEM # DWG. # DESCRIPTION QUANTITY UNIT WSTG QUANTITY W/ UNIT COST UNIT COST TOTAL COST TRADE COST
WASTAGE (Material) (Labor) (Labor + Material)
SUBTOTAL $2,334,199.90
OVERHEAD 15% $350,129.99
INSURANCE 5% $116,710.00
CONTINGENCY 7% $163,393.99
TOTAL BASE BID $2,964,433.87
Note:
PROJECT ID: St Cloud Behavioral Health Date: 7/25/2024
AREA SUMMARY:
BUILDING GSF 27,533 No. of Floors: 3
Basement (SF) 9716
First Floor (SF) 9,822
Second Floor (SF) 7,995