I PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1,00 Unit 500.000,00 500.000,00 0,37 1,00 Unit 500.000,00 500.000,00 0,37 - - - -
2 Bongkaran Tembok KM 2,43 M3 747.400,00 1.816.182,00 1,35 2,43 M3 747.400,00 1.816.182,00 1,34 - - - -
3 Bongkaran Keramik Dinding KM 0,72 M3 747.400,00 538.128,00 0,40 0,72 M3 747.400,00 538.128,00 0,40 - - - -
4 Bongkaran Keramik Lantai Lama KM 0,37 M3 747.400,00 276.538,00 0,20 0,37 M3 747.400,00 276.538,00 0,20 - - - -
5 Bongkaran Ornamen Taman Nambor 0,72 M3 747.400,00 538.128,00 0,40 0,72 M3 747.400,00 538.128,00 0,40 - - - -
6 Bongkaran & Perbaikan Tiang Neonbox Kantor 1,00 Pkt 2.500.000,00 2.500.000,00 1,85 1,00 Pkt 2.500.000,00 2.500.000,00 1,85 - - - -
7 Bongkaran Tiang Parkiran (Pipa Besi) 1,00 Pkt 3.500.000,00 3.500.000,00 2,59 1,00 Pkt 3.500.000,00 3.500.000,00 2,59 - - - -
JUMLAH Sub Total 9.668.976,00 7,17 JUMLAH 9.668.976,00 7,16
II PEK. PASANGAN & PLESTERAN - - - -
1 Pas Batu Kali Tangga Akses G. Palsar 1,35 M3 1.041.300,00 1.405.755,00 1,04 1,35 M3 1.041.300,00 1.405.755,00 1,04 - - - -
2 Finishing Siar Pasangan Batu Kali 6,72 M2 71.000,00 477.120,00 0,35 6,72 M2 71.000,00 477.120,00 0,35 - - - -
3 Pelat Beton Akses Gudang Palsar Tbl.8cm - - - -
Beton (K-175) 0,14 M3 1.327.300,00 185.822,00 0,14 0,14 M3 1.327.300,00 185.822,00 0,14 - - - -
Besi Dia.10-10cm 21,47 Kg 18.300,00 392.901,00 0,29 21,47 Kg 18.300,00 392.901,00 0,29 - - - -
Begisting 1,74 M2 238.400,00 414.816,00 0,31 1,74 M2 238.400,00 414.816,00 0,31 - - - -
4 Kolom Beton Dudukan Tiang Parkiran 20x20cm - - - -
Beton (K-175) 0,05 M3 1.327.300,00 66.365,00 0,05 0,05 M3 1.327.300,00 66.365,00 0,05 - - - -
Begisting 0,48 M2 132.300,00 63.504,00 0,05 0,48 M2 132.300,00 63.504,00 0,05 - - - -
5 Rabat Lantai Mutu F'c=7,4 MPa Tbl.8cm (Beton K-100) 0,26 M3 1.159.600,00 301.496,00 0,22 0,26 M3 1.159.600,00 301.496,00 0,22 - - - -
6 Pas. Tembok 1/2 Bata camp. 1pc : 6pp 3,42 M2 164.800,00 563.616,00 0,42 3,42 M2 164.800,00 563.616,00 0,42 - - - -
7 Pas. Keramik Dinding 25x40cm 31,15 M2 263.500,00 8.208.025,00 6,08 31,15 M2 263.500,00 8.208.025,00 6,07 - - - -
8 Pas. Keramik Lantai 25 x 25 cm KM 5,27 M2 270.400,00 1.425.008,00 1,06 5,27 M2 270.400,00 1.425.008,00 1,05 - - - -
9 Pembuatan Tiang Untuk Net Lapangan Voli 1,00 Pkt 5.175.000,00 5.175.000,00 3,84 1,00 Pkt 5.175.000,00 5.175.000,00 3,83 - - - -
10 Penggantian Tiang Pipa Besi 3" Galvanis (Parkiran) 16,65 Ml 416.666,67 6.937.500,00 5,14 16,65 Ml 416.666,67 6.937.500,00 5,13 - - - -
11 Pas. Pavingstone Abu-Abu K-225 Halaman 151,22 M2 299.200,00 45.245.024,00 33,53 151,22 M2 299.200,00 45.245.024,00 33,48 - - - -
JUMLAH Sub Total 70.861.952,00 52,52 JUMLAH 70.861.952,00 52,44
III PEKERJAAN PENGECATAN - - - -
1 Pengupasan Cat Lama 493,00 Ml 16.100,00 7.937.300,00 5,88 483,64 Ml 16.100,00 7.786.532,19 5,76 - 9,36 - 150.767,81
2 Cat Dinding 986,00 M2 23.100,00 22.776.600,00 16,88 967,27 M2 23.100,00 22.343.961,95 16,53 - 18,73 - 432.638,05
3 Cat Plafond Eternite 73,27 M2 23.100,00 1.692.537,00 1,25 74,28 m3 23.100,00 1.715.752,50 1,27 1,01 - 23.215,50 -
4 Cat Tiang Dan Rangka Parkiran 24,86 M2 75.200,00 1.869.472,00 1,39 32,31 75.200,00 2.429.662,36 1,80 7,45 - 560.190,36 -
JUMLAH Sub Total 34.275.909,00 25,40 JUMLAH 34.275.909,00 25,36
IV PEKERJAAN ATAP & PLAFOND - - - -
1 Pas. Rangka Plafond PVC Hollow 2x4 cm 5,27 M2 180.700,00 952.289,00 0,71 5,27 M2 180.700,00 952.289,00 0,70 - - - -
2 Pas. Penutup Plafond PVC 5,27 M2 114.200,00 601.834,00 0,45 5,27 M2 114.200,00 601.834,00 0,45 - - - -
3 Pas. Sekat Partisi Aluminium Kaca 1,26 M2 2.500.000,00 3.150.000,00 2,33 1,26 M2 2.500.000,00 3.150.000,00 2,33 - - - -
JUMLAH Sub Total 4.704.123,00 3,49 JUMLAH 4.704.123,00 3,48
V PEKERJAAN KELISTRIKAN & SANITAIR - - - -
KONTRAK AWAL KONTRAK CCO TAMBAH - KURANG
NO. URAIAN PEKERJAAN HARGA SATUAN BOBOT HARGA SATUAN BOBOT VOLUME JUMLAH HARGA
VOL. SAT. JUMLAH HARGA VOL. SAT. JUMLAH HARGA
(+PPN 11%) (%) (+PPN 11%) (%)
+ - + -
1 Pas. Closset Duduk 1,00 Bh 2.929.800,00 2.929.800,00 2,17 1,00 Bh 2.929.800,00 2.929.800,00 2,17 - - - -
2 Pas. Wastafel 1,00 Bh 1.362.700,00 1.362.700,00 1,01 1,00 Bh 1.362.700,00 1.362.700,00 1,01 - - - -
3 Pas. Shower 1,00 Bh 450.000,00 450.000,00 0,33 1,00 Bh 450.000,00 450.000,00 0,33 - - - -
4 Pas. Pintu Km 1,00 Bh 2.300.000,00 2.300.000,00 1,70 1,00 Bh 2.300.000,00 2.300.000,00 1,85 - - - -
5 Pas. Titik Lampu + Vitting 2,00 Bh 77.490,00 154.980,00 0,11 2,00 Bh 77.490,00 154.980,00 0,11 - - - -
6 Pas. Lampu Downlight 8w 2,00 bh 90.000,00 180.000,00 0,13 2,00 bh 90.000,00 180.000,00 0,13 - - - -
7 Pas. Saklar Tunggal 3,00 BJ 14.600,00 43.800,00 0,03 3,00 BJ 14.600,00 43.800,00 0,03 - - - -
JUMLAH Sub Total 7.421.280,00 5,50 JUMLAH 7.421.280,00 5,64
VI PEKERJAAN LAINYA - - - -
1 Lanscape Taman Depan Nambor 1,00 Pkt 8.000.000,00 8.000.000,00 5,93 1,00 Pkt 8.000.000,00 8.000.000,00 5,92 - - - -
JUMLAH Sub Total 8.000.000,00 5,93 JUMLAH 8.000.000,00 5,92