0% found this document useful (0 votes)
3 views

CCO

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
3 views

CCO

Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DAFTAR PERHITUNGAN CCO

NAMA PEKERJAAN :
LOKASI PEKERJAAN :
ANGGARAN :

KONTRAK AWAL KONTRAK CCO TAMBAH - KURANG

NO. URAIAN PEKERJAAN HARGA SATUAN BOBOT HARGA SATUAN BOBOT VOLUME JUMLAH HARGA
VOL. SAT. JUMLAH HARGA VOL. SAT. JUMLAH HARGA
(+PPN 11%) (%) (+PPN 11%) (%)
+ - + -

I PEKERJAAN PERSIAPAN
1 Uitzet Lapangan 1,00 Unit 500.000,00 500.000,00 0,37 1,00 Unit 500.000,00 500.000,00 0,37 - - - -
2 Bongkaran Tembok KM 2,43 M3 747.400,00 1.816.182,00 1,35 2,43 M3 747.400,00 1.816.182,00 1,34 - - - -
3 Bongkaran Keramik Dinding KM 0,72 M3 747.400,00 538.128,00 0,40 0,72 M3 747.400,00 538.128,00 0,40 - - - -
4 Bongkaran Keramik Lantai Lama KM 0,37 M3 747.400,00 276.538,00 0,20 0,37 M3 747.400,00 276.538,00 0,20 - - - -
5 Bongkaran Ornamen Taman Nambor 0,72 M3 747.400,00 538.128,00 0,40 0,72 M3 747.400,00 538.128,00 0,40 - - - -
6 Bongkaran & Perbaikan Tiang Neonbox Kantor 1,00 Pkt 2.500.000,00 2.500.000,00 1,85 1,00 Pkt 2.500.000,00 2.500.000,00 1,85 - - - -
7 Bongkaran Tiang Parkiran (Pipa Besi) 1,00 Pkt 3.500.000,00 3.500.000,00 2,59 1,00 Pkt 3.500.000,00 3.500.000,00 2,59 - - - -
JUMLAH Sub Total 9.668.976,00 7,17 JUMLAH 9.668.976,00 7,16
II PEK. PASANGAN & PLESTERAN - - - -
1 Pas Batu Kali Tangga Akses G. Palsar 1,35 M3 1.041.300,00 1.405.755,00 1,04 1,35 M3 1.041.300,00 1.405.755,00 1,04 - - - -
2 Finishing Siar Pasangan Batu Kali 6,72 M2 71.000,00 477.120,00 0,35 6,72 M2 71.000,00 477.120,00 0,35 - - - -
3 Pelat Beton Akses Gudang Palsar Tbl.8cm - - - -
Beton (K-175) 0,14 M3 1.327.300,00 185.822,00 0,14 0,14 M3 1.327.300,00 185.822,00 0,14 - - - -
Besi Dia.10-10cm 21,47 Kg 18.300,00 392.901,00 0,29 21,47 Kg 18.300,00 392.901,00 0,29 - - - -
Begisting 1,74 M2 238.400,00 414.816,00 0,31 1,74 M2 238.400,00 414.816,00 0,31 - - - -
4 Kolom Beton Dudukan Tiang Parkiran 20x20cm - - - -
Beton (K-175) 0,05 M3 1.327.300,00 66.365,00 0,05 0,05 M3 1.327.300,00 66.365,00 0,05 - - - -
Begisting 0,48 M2 132.300,00 63.504,00 0,05 0,48 M2 132.300,00 63.504,00 0,05 - - - -
5 Rabat Lantai Mutu F'c=7,4 MPa Tbl.8cm (Beton K-100) 0,26 M3 1.159.600,00 301.496,00 0,22 0,26 M3 1.159.600,00 301.496,00 0,22 - - - -
6 Pas. Tembok 1/2 Bata camp. 1pc : 6pp 3,42 M2 164.800,00 563.616,00 0,42 3,42 M2 164.800,00 563.616,00 0,42 - - - -
7 Pas. Keramik Dinding 25x40cm 31,15 M2 263.500,00 8.208.025,00 6,08 31,15 M2 263.500,00 8.208.025,00 6,07 - - - -
8 Pas. Keramik Lantai 25 x 25 cm KM 5,27 M2 270.400,00 1.425.008,00 1,06 5,27 M2 270.400,00 1.425.008,00 1,05 - - - -
9 Pembuatan Tiang Untuk Net Lapangan Voli 1,00 Pkt 5.175.000,00 5.175.000,00 3,84 1,00 Pkt 5.175.000,00 5.175.000,00 3,83 - - - -
10 Penggantian Tiang Pipa Besi 3" Galvanis (Parkiran) 16,65 Ml 416.666,67 6.937.500,00 5,14 16,65 Ml 416.666,67 6.937.500,00 5,13 - - - -
11 Pas. Pavingstone Abu-Abu K-225 Halaman 151,22 M2 299.200,00 45.245.024,00 33,53 151,22 M2 299.200,00 45.245.024,00 33,48 - - - -
JUMLAH Sub Total 70.861.952,00 52,52 JUMLAH 70.861.952,00 52,44
III PEKERJAAN PENGECATAN - - - -
1 Pengupasan Cat Lama 493,00 Ml 16.100,00 7.937.300,00 5,88 483,64 Ml 16.100,00 7.786.532,19 5,76 - 9,36 - 150.767,81
2 Cat Dinding 986,00 M2 23.100,00 22.776.600,00 16,88 967,27 M2 23.100,00 22.343.961,95 16,53 - 18,73 - 432.638,05
3 Cat Plafond Eternite 73,27 M2 23.100,00 1.692.537,00 1,25 74,28 m3 23.100,00 1.715.752,50 1,27 1,01 - 23.215,50 -
4 Cat Tiang Dan Rangka Parkiran 24,86 M2 75.200,00 1.869.472,00 1,39 32,31 75.200,00 2.429.662,36 1,80 7,45 - 560.190,36 -
JUMLAH Sub Total 34.275.909,00 25,40 JUMLAH 34.275.909,00 25,36
IV PEKERJAAN ATAP & PLAFOND - - - -
1 Pas. Rangka Plafond PVC Hollow 2x4 cm 5,27 M2 180.700,00 952.289,00 0,71 5,27 M2 180.700,00 952.289,00 0,70 - - - -
2 Pas. Penutup Plafond PVC 5,27 M2 114.200,00 601.834,00 0,45 5,27 M2 114.200,00 601.834,00 0,45 - - - -
3 Pas. Sekat Partisi Aluminium Kaca 1,26 M2 2.500.000,00 3.150.000,00 2,33 1,26 M2 2.500.000,00 3.150.000,00 2,33 - - - -
JUMLAH Sub Total 4.704.123,00 3,49 JUMLAH 4.704.123,00 3,48
V PEKERJAAN KELISTRIKAN & SANITAIR - - - -
KONTRAK AWAL KONTRAK CCO TAMBAH - KURANG

NO. URAIAN PEKERJAAN HARGA SATUAN BOBOT HARGA SATUAN BOBOT VOLUME JUMLAH HARGA
VOL. SAT. JUMLAH HARGA VOL. SAT. JUMLAH HARGA
(+PPN 11%) (%) (+PPN 11%) (%)
+ - + -
1 Pas. Closset Duduk 1,00 Bh 2.929.800,00 2.929.800,00 2,17 1,00 Bh 2.929.800,00 2.929.800,00 2,17 - - - -
2 Pas. Wastafel 1,00 Bh 1.362.700,00 1.362.700,00 1,01 1,00 Bh 1.362.700,00 1.362.700,00 1,01 - - - -
3 Pas. Shower 1,00 Bh 450.000,00 450.000,00 0,33 1,00 Bh 450.000,00 450.000,00 0,33 - - - -
4 Pas. Pintu Km 1,00 Bh 2.300.000,00 2.300.000,00 1,70 1,00 Bh 2.300.000,00 2.300.000,00 1,85 - - - -
5 Pas. Titik Lampu + Vitting 2,00 Bh 77.490,00 154.980,00 0,11 2,00 Bh 77.490,00 154.980,00 0,11 - - - -
6 Pas. Lampu Downlight 8w 2,00 bh 90.000,00 180.000,00 0,13 2,00 bh 90.000,00 180.000,00 0,13 - - - -
7 Pas. Saklar Tunggal 3,00 BJ 14.600,00 43.800,00 0,03 3,00 BJ 14.600,00 43.800,00 0,03 - - - -
JUMLAH Sub Total 7.421.280,00 5,50 JUMLAH 7.421.280,00 5,64

VI PEKERJAAN LAINYA - - - -
1 Lanscape Taman Depan Nambor 1,00 Pkt 8.000.000,00 8.000.000,00 5,93 1,00 Pkt 8.000.000,00 8.000.000,00 5,92 - - - -
JUMLAH Sub Total 8.000.000,00 5,93 JUMLAH 8.000.000,00 5,92

Jumlah Biaya 134.932.240,00 134.932.240,00


PPN 11% 14.842.546,40 14.842.546,40
100,0 100,0 Jumlah 583.405,86 583.405,86

JUMLAH TOTAL 149.774.786,40 149.774.786,40