0% found this document useful (0 votes)
21 views

ITP for Slab on Grade

ITP for Slab on Grade

Uploaded by

Bernardo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

ITP for Slab on Grade

ITP for Slab on Grade

Uploaded by

Bernardo
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

ITP No.

:
INSPECTION AND TEST PLAN Rev. :
Date :
TITLE: CONCRETE SLAB ON GRADE
DISCIPLINE: CIVIL

PROJECT : CONTRACTOR:
INSPECTION
FORMS / RESPONSIBILITIES
Sl. No. ACTIVITY DESCRIPTION REFERENCE DOCUMENTS ACCEPTANCE CRITERIA VERIFYING DOCUMENTS Remarks
CHECKLIST

1 DOCUMENT REVIEW

Conformance to
Material Technical
1.1 Material Submittal (RSB) AES-C-0004 AES-C-0004, - R R/A
Data
Sec. 6.5

AES-C-0004 / Conformance to
Third Party
1.2 Concrete Design Mix RC 03 30 00 AES-C-0004, - R R/A
crushing test report
Approved Mixed Design Sec. 7.6

2 MATERIAL RECEIVING INSPECTION

Conformance to
2.1 Material receiving inspection. AES-C-0004 Material Approval / No Material Certificate - H W
physical damage

3.0 INSTALLATION

3.1 SLAB ON GRADE

Min. 90% - General fill


AES-C-0103 Min. 95% - Structural Fill Third party Test perform by approved third
3.1.1 FDT of the compacted base. AMCC-QF-C001 H W
ASTM D 1557 ±2% - Optimum Moisture Test Report party
Content

IFC Drawing / Conform to manufacturers Quality Form /


3.1.2 Termite protection application and vapor barriers AMCC.QF.C002 H W
Approved drawings instruction Checklist

Installed filler boards, reinforcement bars, IFC Drawing / Conform to IFC Drawing / Quality Checklist /
3.1.3 AMCC.QF.C002 H W
embedded items and elevations. Approved drawings Approved drawings Survey Report

3.2 CONCRETE POURING

Legend: W - Witness, H - Hold Point, , R-Review, A-Approval, 1 of 2


ITP No. :
INSPECTION AND TEST PLAN Rev. :
Date :
TITLE:
DISCIPLINE: CIVIL

PROJECT : CONTRACTOR:
INSPECTION
FORMS / RESPONSIBILITIES
Sl. No. ACTIVITY DESCRIPTION REFERENCE DOCUMENTS ACCEPTANCE CRITERIA VERIFYING DOCUMENTS Remarks
CHECKLIST

* For 35 Mpa
Slump Test: 150±25 mm
Fresh Concrete sampling Approved Conc. Temp.: Not exceed 30 ºC Third Party Test perform by approved third
3.2.1 AMCC.QF.C003 H W
(Slump and Temperature) Design Mix * For 20 Mpa Test Report party
Slump Test: 125±40 mm
Temp.: Not exceed 32 ºC
AES-C-0004 /
AES-C-0004 Quality Form / Test perform by approved third
3.2.2 Monitor concrete placement Approved Conc. AMCC.QF.C003 W W
Clause 7.14 Checklist party in laboratory
Design Mix

Minimum Compresive
AES-C-0004 /
Strength Third Party Test perform by approved third
3.3.3 Concrete Compressive Testing (7th & 28th days) Approved Conc. AMCC.QF.C003 W W/R
7th days: 24 Mpa Test Report party in laboratory
Design Mix
28th days: 35 Mpa
3.3 POST CONCRETE

AES-C-0004 Quality Form /


3.3.1 Water concrete curing (7 days) AES-C-0004 AMCC.QF.C003 W W
clause 7.15 Checklist

4 PRE-COMMISSIONING

4.1 Not applicable - - - - - - -

Legend: W - Witness, H - Hold Point, , R-Review, A-Approval, 2 of 2