11. Business models and Refences
11. Business models and Refences
TopSide
EPC (Yard) EPC
Electrical Package
T&I
2
Business Model
Different Options
Internal
4 © 2021 Hitachi Energy. All rights reserved.
The latest hybrid switchgear support China's first 66-kilovolt
offshore wind farm in reducing carbon emissions
Challenge
Hitachi Energy’s latest high-voltage hybrid switchgear for
offshore wind application is the first-of-its-kind to enable the
collection grid between the wind towers to operate at a
higher voltage level. Offshore wind turbines typically operate
at up to 5-megawatt (MW) generation capacity and 33-
kilovolt (kV). However, the growing demand for renewable
energy has led to the increase of generation capabilities
currently at 14 MW and is expected to reach 20 MW,
by 2030. Hitachi Energy has introduced a 72.5 kV high-
voltage hybrid switchgear, Plug and Switch System (PASS)
M00 – Wind.
Solution
This innovative solution will be installed at
China's first 66 kV offshore wind
farm, Huadian Yuhuan Phase 1 to optimize
the energy landscape in the Yangtze River
Delta. Hitachi ABB Power Grids will supply 22
units of PASS M00 – Wind to Dongfang Electric
Wind Power Co. Ltd., a leading wind turbine
manufacturer in China.
Impact
Scheduled for completion at the end
of 2021, Huadian Yuhuan Phase 1 will supply 770
million kilowatt-hour (kWh) of electricity to power
approximately 240,000 households in the
Zhejiang province per annum. This decreases the use
of fossil fuels by reducing around 584,000 tons of
carbon dioxide (CO2) emissions, equivalent to more
than 12,600 passenger vehicles driven for one year.
Scottish Power, UK
Örsted (Denmark)
Internal
7 © 2021 Hitachi Energy. All rights reserved.
Equinor Baltyk II & III – 1.4 GW
Internal
8 © 2022 Hitachi Energy. All rights reserved. Electrical systems infrastructure contract for Baltyk offshore wind projects awarded - Equinor
Offshore wind connection
The largest offshore windfarm HVDC connection
Equinor
Highlights
Project scope • Hitachi Energy to provide AC grid connection and FACTS for two biggest
• RelCare and Station
and most advanced offshore wind farms in Poland
Connect online condition
• Combined generating capacity: 1,440 MW
monitoring allowed to meet
• Location: polish sector of the Baltic Sea.
all customer’s requirements
from RFP regarding condition
monitoring systems
Service contribution
Context • Grid connection’s risk profile monitoring platform • RelCare platform allows
• Primary equipment online condition monitoring Service to engage from day
• Project is 1st phase of Polish solution (CB’s, power TX’s, shunt reactors) one to maximize customer
offshore wind generation • O&M management platform value – asset diagnostics,
development program – objective maint. engineering, risk
to reach 5,9 MW capacity management, lifecycle
• Generation to start in 2027 decisions support, etc.