0% found this document useful (0 votes)
18 views

11. Business models and Refences

11. Business models and Refences

Uploaded by

Hyungwoo Jang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
18 views

11. Business models and Refences

11. Business models and Refences

Uploaded by

Hyungwoo Jang
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 13

Hitachi Energy - Offshore wind

Business Models and references


Alfredo Parres, Head of Renewables

2023-03-10 © Hitachi Energy 2021. All rights reserved


Business Model
Different approach

Approach 1 Approach 2 Approach 3

Employer/Developer Employer/Developer Employer/Developer

TopSide
EPC (Yard) EPC

Electrical Package

Hitachi Energy Hitachi Energy


Shipyard Consultant
(Electrical package) (Electrical package)
Jacket/Foundation

T&I

2
Business Model
Different Options

Multiple Options for OSS Contract Model Examples

Hitachi Energy will flexibly adapt to the different setups


Floating offshore wind
WindSTAR transformer

MHI Vestas Offshore Wind

Challenge Solution Impact


– Transformer specifically designed for floating – Transformer specifically designed to be extra – Pioneering technology that opens up for large
wind turbines. resilient against strong vibrations and extreme offshore wind potential in deep waters.
– WindFloat Atlantic project: 8.4 MW turbines and sudden movements encountered on floating
positioned 20 km from shore, wind turbines.
in a location where the sea is 100 m deep. – Compact transformer designed to fit in the tower,
66 kV transformer allowing
for significant reduction in transfer losses and
enabling higher efficiency.

Internal
4 © 2021 Hitachi Energy. All rights reserved.
The latest hybrid switchgear support China's first 66-kilovolt
offshore wind farm in reducing carbon emissions

Challenge
Hitachi Energy’s latest high-voltage hybrid switchgear for
offshore wind application is the first-of-its-kind to enable the
collection grid between the wind towers to operate at a
higher voltage level. Offshore wind turbines typically operate
at up to 5-megawatt (MW) generation capacity and 33-
kilovolt (kV). However, the growing demand for renewable
energy has led to the increase of generation capabilities
currently at 14 MW and is expected to reach 20 MW,
by 2030. Hitachi Energy has introduced a 72.5 kV high-
voltage hybrid switchgear, Plug and Switch System (PASS)
M00 – Wind.

Solution
This innovative solution will be installed at
China's first 66 kV offshore wind
farm, Huadian Yuhuan Phase 1 to optimize
the energy landscape in the Yangtze River
Delta. Hitachi ABB Power Grids will supply 22
units of PASS M00 – Wind to Dongfang Electric
Wind Power Co. Ltd., a leading wind turbine
manufacturer in China.

Impact
Scheduled for completion at the end
of 2021, Huadian Yuhuan Phase 1 will supply 770
million kilowatt-hour (kWh) of electricity to power
approximately 240,000 households in the
Zhejiang province per annum. This decreases the use
of fossil fuels by reducing around 584,000 tons of
carbon dioxide (CO2) emissions, equivalent to more
than 12,600 passenger vehicles driven for one year.

5 © 2021 Hitachi Energy. All rights reserved.


Offshore wind integration
East Anglia ONE – SVC Light® STATCOMs

Scottish Power, UK

Challenge Solution Impact


– Help Great Britain’s electricity transmission – Two STATCOM SVC Light® +/- 220 Mvar to the – Will allow Scottish Power to develop up to 714
network to meet the government’s target for 15 400 kV grid. MW of clean and reliable renewable energy that
percent of the UK’s energy to be produced from – MACH™ control system as part of Hitachi will be delivered to over 500,000 homes in Great
renewable sources by 2020. Energy-Ability™ digital offering acts as the brain Britain.
– Grid Code Compliance – Balance the power of the STATCOM – monitoring, control and – Increase power transfer capability and improved
output from an offshore windfarm protection. power quality (reduced Voltage fluctuations,
to the network delivering clean, renewable – Two special designed Autotransformers enhanced grid stability, reduced total losses).
energy. TrafoStar™.
– Site located 43km off the Suffolk Coast.
Internal
6 © 2021 Hitachi Energy. All rights reserved.
Offshore wind power integration
Hornsea II: the largest onshore wind farm AC connection

Örsted (Denmark)

Challenge Solution Impact


– A 1,800 megawatt (MW) project, about 100 – Three 240 MVA STATCOM SVC Light to windfarm. – Studies and technical recommendation to apply
– Hitachi Energy contract also includes the installation and reactive power compensation.
kilometer off commissioning of 66 kV, 220 kV and 400 kV gas-insulated
the Yorkshire coast in the North Sea. switchgear (GIS) – Full compliance with Grid Code requirements.
and 400/220 kV onshore and 220/66 kV offshore transformers
– Completion estimated in 2020. and reactors. – True partnership during design, tendering and
– Hitachi Energy will also be responsible for the project project execution
management, engineering, manufacturing, supply and to ensure full FACTS potential at the customer
commissioning of the IEC 61850 based substation automation,
control and protection systems for the onshore substation and the
site.
two offshore platform substations.

Internal
7 © 2021 Hitachi Energy. All rights reserved.
Equinor Baltyk II & III – 1.4 GW

Internal
8 © 2022 Hitachi Energy. All rights reserved. Electrical systems infrastructure contract for Baltyk offshore wind projects awarded - Equinor
Offshore wind connection
The largest offshore windfarm HVDC connection

Equinor

Challenge Solution Impact


– Connect 2,4 GW Dogger Bank – Hitachi Energy innovative offshore – One of the smallest footprint.
offshore wind farm to the grid wind technology and expertise. – The lowest energy losses in the
(Creyke Beck A and Creyke Beck B). – New generation HVDC Light® with the industry.
most compact design. – Support to grid stability and reliability.
– 2 x 1200 MW ±320 kV. – A competitive solution for offshore
– Innovative delivery model together with wind at a long distance from shore.
Aibel.
Internal
9 © 2021 Hitachi Energy. All rights reserved.
Servicing Offshore Wind Substation Automation + Communications
Ørsted Hornsea 2, Changhua 1 & 2

About the project Solution


Ørsted is the world’s most
experienced developer, owner and • Project name: Changhua 1&2, Hornsea 2 • Service Level Agreement (SLA) for 5 years for
operator of Offshore wind projects. • Location: TW, UK 20-89 km off coast and onshore SCADA and protection servicing with option to
Based on installed projects and • Customers: Ørsted (Denmark) prolongue for 2 years
projects under preparation, Ørsted
will look at a 10 GW offshore wind
• Completion date: Contract duration until approx.
portfolio by 2022. Jan 2026 (HOW02) and March 2026
(Changhua 1&2)
Leveraging their frame agreement
on protection, controls and
automation for substations in
offshore wind, Ørsted turned to
Hitachi for the servicing of:

• >150 protection + controls panels Customer benefits


incl. SCADA
• Communication equipment • 24/7 support on-site from local teams in UK, TW and
securing mission-critical remote from the Global Collaborative Operations
communications and Center (COC) in CH
cybersecurity btw onshore and • Comprehensive system maintenance
offshore substations (Weekly, Quarterly, Yearly)
• 6 offshore, 4 onshore substations • Guaranteed local spare parts availability for
5 years (extendable)
• 2 countries: UK and TW
• Standardized team interfaces across the globe
• Scalability potential for additional projects in US
and other new markets

10 © 2021 Hitachi Energy. All rights reserved.


Offshore wind Poland

Highlights
Project scope • Hitachi Energy to provide AC grid connection and FACTS for two biggest
• RelCare and Station
and most advanced offshore wind farms in Poland
Connect online condition
• Combined generating capacity: 1,440 MW
monitoring allowed to meet
• Location: polish sector of the Baltic Sea.
all customer’s requirements
from RFP regarding condition
monitoring systems
Service contribution
Context • Grid connection’s risk profile monitoring platform • RelCare platform allows
• Primary equipment online condition monitoring Service to engage from day
• Project is 1st phase of Polish solution (CB’s, power TX’s, shunt reactors) one to maximize customer
offshore wind generation • O&M management platform value – asset diagnostics,
development program – objective maint. engineering, risk
to reach 5,9 MW capacity management, lifecycle
• Generation to start in 2027 decisions support, etc.

• RelCare platform is the focal


Value for the customer point of the reliability
focused SLA proposal
• Assure accurate asset condition insights
• Reduce number of onsite visits
• Reduce health and safety risk exposure
• Orchestrate O&M value chain players incl. Hitachi Energy
service team and customer’s in-house resources
• Better prepare maintenance activities, make the most of
the scheduled outages and increases first-time-fix rate
© 2022 Hitachi Energy. All rights reserved.