0% found this document useful (0 votes)
5 views2 pages

GHW #3E (1)

Uploaded by

Kaiser Hòa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
5 views2 pages

GHW #3E (1)

Uploaded by

Kaiser Hòa
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Objectives: L.O.5.2, L.O.5.3, L.O.5.

4 GHW #3

A. Requirement

Consider a semi-automatic loading-unloading ore truck below:

Where:
X1: sensor signal – the ore cart is positioned at the loading hopper
X2: sensor signal – the ore cart is positioned at the ore discharge point
Y10: control signal – the ore cart is moved to the right
Y11: control signal – opens the hoppers doors and fills the truck with ore
Y12: control signal – the ore cart is moved to the left
Y13: control signal – opens the bottom doors

The system operation is described the SFC in which there are three push buttons: Reset, Start,
and Stop.

Requirement:
a. Explain the system operation.
b. (L.O.5.3) Design a relay control circuit.
c. (L.O.5.4) Write output expressions, then draw a power circuit.
d. (L.O.5.2) Modify the SFC so that the Start button is only active when the ore cart has to
be at the ore discharge point as seen in the figure.
e. (L.O.5.3) Modify the relay control circuit when there is 1 more push button (EM Stop)
so that the system operation stops immediately when the EM Stop is pressed.

Course: ME2019 1/3


Course: ME2019 2/3

You might also like