0% found this document useful (0 votes)
16 views

analysis of boards

Analysis of sign bords

Uploaded by

Daljit624
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
16 views

analysis of boards

Analysis of sign bords

Uploaded by

Daljit624
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 18

Analysis of rate for providing and fixing two legged board of 16 gauge CRC sheet (1500x1200mm) with

painting (for CRF information)


-------------------------------------------------------------------------------------------------------------------------------------
-
1. 16mm gauge CRC sheet
Area of sheet required 5 x 4 = 20 + 5% wastage = 21.00 sft or 1.95 sqm
@ 12.55 per sqm = 24.47 kg
@ Rs. 240+4% Vat = 269.60 Per kg Rs. 6108.00
2. Angle iron of size 25 x 25 x 3 for supporting sheet
2 (1.50+0.90) + 0.90 = 5.70 Mtr
Add 5% wastage = 0.28 Mtr
= 5.98 Mtr
@ 1.00 kg per mtr = 6.578 kg
@ Rs. 48.50 + 4% Vat = 50.44 Per kg Rs. 332.00
3. Angle iron of size 65 x 65 x 6 mm
Length 4 x 2 = 8 mtr +5% wastage = 8.40 mtr
@ 5.80 kg per mtr = 48.72 kg
@ Rs. 48.50 + 4% Vat = 50.44 Per kg Rs. 2457.00
4. MS plate (Bottom) 125 x 6 mm
Total length 2 x 125 x 6 mm plate = 0.25 mtr
@ 5.90 kg per mtr = 48.72 kg
@ Rs. 45 + 4% Vat = 46.80 Per kg Rs. 69.00
5. 32 Nos. holes @ 0.75each Rs. 24.00
6. 22 Nos. Rivet @ 3.00 each Rs. 66.00
7. Writing matter with paint
5’-0” x 3’-0” = 15 sft
@ Rs. 45.00 per sft Rs. 675.00
8. Carriage of material from market to work shop L.S. Rs. 75.00
9. Fabrication erection and board complete
Total weight of angle iron = 75.088 kg @ 8/- per kg Rs. 601.00
10. Painting
Priming of metallic surface with red oxide and painting two coats
With special quality synthetic paint (16.9+16.11)
M.S. sheet 2 x 1.50 x 0.90 = 2.70 sqm
Angle iron 25x25x3 5.70 x 0.10 = 0.57 sqm
Angle iron 65x65x6 8 x 0.26 = 2.08 sqm
= 5.35 sqm
@ Rs. 59.00 per sqm Rs. 316.00
11. Transporting and packing Rs. 200.00
Rs. 10923.00
a) Earth work in excavation (CSR 6.6)
2x0.60x0.60x0.60 = 0.432 cum
@ Rs. 90.00 per cum Rs. 39.00
b) Cement concrete 1:2:4 (10.11+10.13) = 0.432
@ Rs. 3449 per cum Rs. 1490.00
c) Labour for erection
Masson ¼ @ Rs. 170/- Rs. 43.00
Helper ¼ @ Rs. 136/- Rs. 34.00
Add 10 Contr. Profit on Rs. 10923 (item No. 1 to 11) Rs. 1092.00
Add 10% overhead charges Rs. 1092.00
Total Rs. 14670.00
Say Rs. Rs. 14700.00

Executive Engineer
Const. Divn. PWD B&R
Barnala
Analysis of rate for providing and fixing of village board 900mm x 600mm rectangular plate made up of
2mm thick aluminum plate fixed on L-iron 50 x 50 x 6mm with retro reflective sheeting (high intensity)
---------------------------------------------------------------------------------------------------------------------------------
1. Supply of 2 mm thick aluminum sheet
Area of sheet 3 x 2 = 6.00 sft
Wt. of sheet @ 1.11 lbs / sft = 6.66 lbs or = 3.02 kg
Add wastage 5% = 0.15 kg
@ Rs. 190.00 per kg + 4% ST = 3.17 kg Rs. 626.39
2. Angle iron of size 25 x 25 x 3 mm for back
support of rectangle indication sheet
2 (0.90+0.60) = 3.00 Mtr
Wt. @ 1.10 kg per mtr. = 3.30 kg
Add 5% wastage = 0.17 kg
@ Rs. 45.00 per kg + 4% ST = 3.47 kg Rs. 162.40
3. M.S. angle iron 50 x 50 x 6 mm for leg post
2 x 4.00 = 8.00 Mtr
hold fast = 0.60 Mtr
= 8.60 Mtr
Wt. @ 4.50 kg per mtr. = 38.70 kg
Add 5% wastage = 1.94 kg
@ Rs. 45.00 per kg + 4% ST = 40.64 kg Rs. 1901.95
4. Fabrication charges i.e. cutting straightening
drilling, rivetting, welding and cost of nuts
and bolts etc.
3.02+3.30+38.70 = 45.02 kg
@ Rs. 7.00 per kg Rs. 315.14
5. Painting two coats with one coat of primer coat
leg post 2 x 2 x 4 (0.05+0.05) = 1.60 Sqm
@ Rs. 9.70 + 455% CP = 53.84 per sqm Rs. 86.14
6. Retro reflecting (high intensity) prismatic sheeting consisting
of transparent sphericallenes elements for permanent
road sighting giving reflectivity and retro reflectance
with superior angularity under all weather conditions
Base sheet 0.90 x 0.60 m = 0.54 Sqm
Border 2(0.90+0.60) x 0.05 = 0.15 Sqm
Name of village in English & Punjabi av.
60% of area = 0.32 Sqm
= 1.01 Sqm
Add wastage 5% = 0.05 Sqm
Total = 1.06 Sqm
@ Rs. 6500.00per Sqm = Rs. 6890.00
7. Heat treatment process designing processing
placing & finishing or retro reflective sheeting
for permanent road signing on the substrate of
board by computor plotter Area = 1.01 Sqm
@ Rs. 1300.00 per Sqm Rs. 1313.00
8. Transporation & packing by comugated sheet
and plastic sheet charge. L.S. Rs. 60.00
9. Fixing charges
a Excavation of earth for fixing of boards Qty.
0.60 x 0.60 x 0.60 m = 0.216 Cum
@ Rs. 686+490% CP = 4047.40 per %cum Rs. 8.74
b Providing and laying RCC 1:2:4 for fixing of board
0.60 x 0.60 x 0.60 m = 0.216 Cum
@ Rs. 447+455% CP = 2480.85 cum Rs. 535.86
Rs. 544.60
Cost for two leg post Rs. 1089.20
Total for item 1 to 9 Rs. 12444.22
Add 10% contractor profit
on item No. 1 to 9 except item 5 to 9 i.e. Rs. 11268.88 Rs. 1126.88
Total Rs. 13571.10
Say Rs. 13570.00
Analysis of Rate for Providing & Fixing RCC Pillers for negotiating
---------------------------------------------------------------------------------------
(As per Allotted Rate)

1. Earth work excavation in ordinary soil


Kassi work undressed (CSR 6.6)
0.915 x 0.915 x 0.376 = 0.315 cum
@ Rs. 55.00 per cum Rs. 17.00

2. Cement concrete 1:4:8 with brick ballast


40 mm gauge (CSR 10.5a)
0.915 x 0.915 x 0.076 = 0.064 cum
3.14 x 0.15 x 0.15 x 0.15 = 0.010 cum
= 0.074 cum
@ Rs. 1800.00 per cum Rs. 133.00

3. Providing RCC pipe 300mm dia NP-2 1.40 mtr


@ Rs. 450.00 + 10% contr. profit Rs. 693.00

4. Painting two coats with ready mixed exterior


paint in all shades on newly plastered or concrete
including priming coat (ch 16.25 & 16.26)
3.14 x 0.376 x 1.00 = 1.18 Sqm
3.14 x 0.188 x 0.188 = 0.11 sqm
= 1.29 sqm
@ Rs. 59.00 per cum Rs. 76.00

5. Earth filling in pipe


3.14 x 0.30 x 1.40 = 1.32 cum
@ Rs. 72.50 Rs. 96.00

6. Cement concrete 1:2:4 with stone metal or shingle


0.915 x 0.915 x 0.40 = 0.335 cum
3.14 x 0.15 x 0.15 x 0.15 = 0.010 cum
1 /2 x 3.14 x 0.15 x 0.15 x 0.05 = 0.001 cum
Total = 0.346 cum
(-) 1 / 2 x 0.205 x 0.10 = 0.010 cum
(-) 3.14 x 0.188 x 0.188x0.40 = 0.044 cum
Total = 0.054 cum
Net = 0.292 cum

@ Rs. 3500.00 per cum Rs. 1022.00

Total Rs. 2037.00

Executive Engineer
Const. Divn. PWD B&R
Malerkotla
Analysis of rate for providing and fixing Hazard marker sign board 900mm x 300mm rectangular plate
made up of 2mm thick aluminum plate fixed on L-iron 50 x 50 x 6mm with retro reflective sheeting
(high intensity)
-------------------------------------------------------------------------------------------------------------------------------------
-
1. Supply of 2 mm thick aluminum sheet

Area of sheet 0.90 x 0.30 = 0.27 sqm or 2.90 sft

Wt. of sheet @ 1.11 lbs / sft = 3.20 lbs or = 1.45 kg

Add wastage 5% = 0.07 kg

= 1.52 kg

@ Rs. 240.00 + 4% Vat = 249.60 per kg Rs. 379.00

2. Angle iron of size 25 x 25 x 3 mm for back

support of rectangle indication sheet

2 (0.90+0.30) = 2.40 Mtr

Wt. @ 1.10 kg per mtr. = 2.64 kg

Add 5% wastage = 0.13 kg

= 2.77 kg

@ Rs. 48.50 + 4% Vat = 50.44 per kg Rs. 140.00

3. M.S. angle iron 50 x 50 x 6 mm for leg post

Leg post = 1.50 Mtr

Wt. @ 4.50 kg per mtr. = 6.75 kg

Add 5% wastage = 0.34 kg

= 7.09 kg

@ Rs. 48.50 + 4% Vat = 50.44 per kg Rs. 358.00

4. Fabrication charges i.e. cutting straightening

drilling, rivetting, welding and cost of nuts

and bolts etc.

1.45+2.64+6.745 = 10.84 kg

@ Rs. 8.00 per kg Rs. 87.00

5. Painting two coats with one coat of primer coat


(ch. 16.9 & 16.11)

leg post 2 x 3 x (0.05+0.05) = 0.60 Sqm

@ Rs. 59.00 per sqm Rs. 35.00

Primer coat Rs. 25.00

6. Retro reflecting sheeting (high intensity) consisting

of transparent shericallanes elements for permanent

road signing giving reflectivly and retro reflectance

with superior angulantry under all weather conditions

Base sheet 0.90 x 0.30 m = 0.27 Sqm

Add wastage 5% = 0.01 Sqm

Total = 0.28 Sqm

@ Rs. 6500.00 + 4% Vat =6760.00 per Sqm Rs. 1893.00

7. Heat treatment process designing processing

placing & finishing or retro reflective sheeting

for permanent road signing on the substrate of

board by computor plotter Area = 0.270 Sqm

@ Rs. 1300.00 + 4% Vat = 1352.00 per sqm Rs. 365.00

8. Transporation & packing by comugated sheet

and plastic sheet charge. L.S. Rs. 200.00

9. Fixing charges

a Excavation of earth for fixing of boards Qty.

0.45 x 0.45 x 0.45 m = 0.091 Cum

@ Rs. 90.00 per cum Rs. 8.00

b Providing and laying RCC 1:2:4 for fixing of board

0.45 x 0.45 x 0.45 m = 0.216 Cum

@ Rs. 3449.00 per sqm Rs. 745.00

c. Labour for erection

Masson ¼ @ Rs. 170.00 Rs. 43.00

Helper ¼ @ Rs. 136.00 Rs. 34.00


Total for item 1 to 9 = Rs. 4350.00

Add 10% contractor profit on item 1 to 8 i.e. Rs. 3525/- Rs. 353.00

Add 10% over head charges i.e. Rs. 3525/- Rs. 353.00

Total Rs. 5018.00

Say Rs. 5000.00

Executive Engineer
Const. Divn. PWD B&R
Barnala
Analysis of rate for providing and fixing single legged speed limit board made up of 2mm thick
aluminum sheet of size 600mm with retro reflective sheeting (high intensity)
-------------------------------------------------------------------------------------------------------------------------------------
-
1. Supply of 2 mm thick aluminum sheet

Area of sheet 2’ x 2’ (including wastage) = 4.00 sft

Wt. of sheet @ 1.11 lbs / sft = 4.44 lbs or = 2.01 kg

indication sheet 0.60 x 0.20 = 1.200 Sqm or 1.29 sft

Wt. of sheet @ 1.11 lbs / sft = 1.43 lbs or = 0.65 kg

Add wastage 5% = 0.03 kg

@ Rs. 240.00 + 4% Vat = 249.60 per kg = Rs. 671.00

2. Angle iron of size 25 x 25 x 3 mm for back

circular and indication sheet

Circular sheet 2x22/7x0.300 = 1.88 Sqm

Indication sheet 2 (0.60+0.20) = 1.60 Sqm

= 3.48 Sqm

Wt. @ 1.10 kg per mtr. = 3.83 kg

Add 5% wastage = 0.19 kg

= 4.02 kg

@ Rs. 48.50 + 4% Vat = 50.44 per kg Rs. 203.00

3. M.S. angle iron 50 x 50 x 6 mm for leg post

Leg post = 4.00 Mtr

Hold fast = 0.30 Mtr

= 4.30 Mtr

Wt. @ 4.50 kg per mtr. = 19.35 kg

Add 5% wastage = 0.97 kg


@ Rs. 48.50 + 4% Vat = 50.44 per kg Rs. 1025.00

4. Fabrication charges i.e. cutting straightening

drilling, rivetting, welding and cost of nuts

and bolts etc.

2.01+0.65+3.83+19.35 = 25.84 kg

@ Rs. 8.00 per kg Rs. 207.00

5. Painting two coats with one coat of primer coat

(ch. 16.9 & 16.11)

leg post 2 x 2 x 4(0.05+0.05) = 1.60 Sqm

@ Rs. 59.00 per sqm Rs. 94.00

Primer coat = Rs. 35.00

6. Retro reflecting sheeting (high intensity) consisting


of transparent shericallanes elements for permanent
road signing giving reflectivly and retro reflectance
with superior angulantry under all weather conditions
Base sheet 0.90 x 0.30 m = 0.283 Sqm
Border 65mm = 0.113 Sqm
Road Sign = 0.040 Sqm
Indication plate = 0.120 Sqm
Indication sign = 0.020 Sqm
= 0.576 Sqm
Add wastage 5% = 0.029 Sqm
Total = 0.605 Sqm
@ Rs. 6500.00 + 4% Vat = 6760.00 per sqm = Rs. 4090.00
7. Heat treatment process designing processing
placing & finishing or retro reflective sheeting
for permanent road signing on the substrate of
board by computor plotter
Area of trangle and indication plate = 0.403 Sqm
@ Rs. 1300.00 + 4% Vat = 1352.00 Rs. 545.00
8. Transporation & packing by comugated sheet
and plastic sheet charge. L.S. Rs. 200.00
Rs. 7070.00
9. Fixing charges
a Excavation of earth for fixing of boards Qty.
0.60 x 0.60 x 0.60 m = 0.216 Cum
@ Rs. 90.00 per cum Rs. 19.00
b Providing and laying RCC 1:2:4 for fixing of board
0.60 x 0.60 x 0.60 m = 0.216 Cum
@ Rs. 3449.00 per cum Rs. 745.00
c. Labour for erection
Masson ¼ @ Rs. 170.00 Rs. 43.00
Helper ¼ @ Rs. 136.00 Rs. 34.00
Total for item 1 to 9 = Rs. 7949.00
Add 10% contractor profit on item 1 to 8 i.e. Rs. 7070/- Rs. 707.00
Add 10% over head charges i.e. Rs. 7028/- Rs. 707.00
Total Rs. 9325.00
Say Rs. 9300.00

Executive Engineer
Const. Divn. PWD B&R
Malerkotla

Analysis of Rate for Const. of RCC Direction / Vill. Board as per standard design.
---------------------------------------------------------------------------------------------------------
1. Earth work excavation in ordinary soil
Kinds of soil and not exceeding 2 mtr.
depth.CSR 6.6)
4’-8” x 1’-7” x 1’-11” = 14.14 cft or 0.40 cum
@ Rs. 686+460% = 3841.60 %cum Rs. 15.37
2. Cement concrete 1:4:8 with brick ballast
40 mm gauge (CSR 10.8)
4’-8” x 11’-6” = 4.47 cft or 0.13 cum
@ Rs. 307+305% = 1243.35 cum Rs. 161.63
3. Cement concrete 1:2:4 with stone blast (ch 10.11)
4”-1’-3” x 1’-4” = 6.67 cft
deduct 3’ x 3” x 1’-4” (-) = 1.00 cft
= 5.67 cft or 0.16 cum
@ Rs. 447+305% = 1810.35 cum Rs. 289.66
4. RCC work hand mixed 1:2:4 for slab excluding steel
but including centring in shuttering (ch. 10.17)
3 x 3” x 1’-4” = 1.00 cft
2 (3+2-4”) x 3” x 6” = 0.67 cft
1 x 2 –4” x3” x 0’-6” = 0.29 cft
1 x 3’ x 3” x 1’-8” = 1.25 cft
= 3.21 cft or 0.091 cum
@ Rs 765.50+330% = 3291.65 cum Rs. 299.54
4b. Extra cost for steel
Detail of steel 8 Nos 52” = 34.66’ or 10.56 mtr.
16 mm dia bars
@ 1.578 kg per mtr. = 16.67 kg
10 mm dia bars
10 x 3’ = 30’
2 x 2’ –6” = 5’
2 x2 x 1” = 4.16
39.16 or 11.94 mtr
@ 0.62 kg per mtr. = 7.40 kg Rs. 774.76
Total weight 16.67+7.40 = 24.07 kg or 0.241 qtl.
@ 684+370% per qtl. 3214.80 per qtl
5 ¼” (6mm) thick cement plaster 1:4
above G.L. 2 x 2 (3+2-4”) x 6” = 5.33 sft
2 2
2x2x8x6 = 2.67 sft
2 x 3 x 1 – 8” = 10.00 sft
sides 2 x 3 –3x3” = 1.63 sft
top 3x3“ = 0.75 sft
2 x 3 x 3” = 1.50 sft
= 21.88 sft or 2.03 Sqm
@ Rs. 8.70 + 305% Sqm = 35.24 Sqm Rs. 71.54
6. Preparation of plaster or concrete surface
for painting and printing with cement primer
with 2 coats with ready mixed paint complete
in all respects.
Qty. same as per item No 5 2.03 Sqm
@ 30.55 + 275% = 114.56 Rs. 232.55

6b Lettering the direction and name of link road etc. Rs. 400.00
Total Rs. 2245.05
Say Rs. Rs. 2245.00

Analysis of rate for providing and fixing of retro reflective high intensity delinator post
----------------------------------------------------------------------------------------------------------------
1. M.S. high quality steel pipe ½” dia 60cm long
@ Rs. 40.00 Per Rft = 70.00

2. Bottom plate 10 cm dia welded on bottom side


@ Rs. 15.00 each = 10.00

3. Top plate 15 cm dia welded with wire mesh


@ Rs. 15.00 each = 15.00

4. Superior quality wire mesh 15cm dia 11” long


1” x 1” Sq plot welded
@ Rs. 45.00 each = 45.00

5. Nut and bolt at top and rare


@ Rs. 5.00 each (2 Nos) = 10.00

6. Inner flat included welded


@ Rs. 10.00 each = 10.00

7. Retro reflective high intensity 2 Nos 2’ wide strips


fixed over pipe with heating machine on top and rare
@ Rs. 110.00 each = 110.00
8. 4” wide retro reflective strips over centre of the delinator
@ Rs. 240.00 each = 240.00

9. Printed with heating treatment


@ Rs. 60.00 each = 60.00

10. Welding charges of wire mesh


@ Rs. 20.00 each = 20.00

11. Fixing charges at site in cement concrete


@ Rs. 30.00 each = 30.00

Total 620.00

Executive Engineer
Const. Divn. PWD B&R
Barnala

Analysis of rate for Single legged route informatory board of size 450 x 600mm made up of 2mm thick
aluminum sheet fixed on L-iron 50 x 50 x 6mm with retro reflective sheeting (high intensity)
-------------------------------------------------------------------------------------------------------------------------------------
-
1. Supply of aluminum sheet size 2’x2’
Area of sheet 0.60 x 0.45 = 0.270sqm or 2.91 sft
Wt. of sheet @ 1.11 lbs / sft = 3.23 lbs or = 1.47 kg
Add wastage 5% = 0.07 kg
@ Rs. 145.00 per kg + 4% ST Rs. 232.23
2. Angle iron of size 25 x 25 x 3 mm for back
circular and indication sheet
2 (0.45+0.60) = 2.10 Mtr
Wt. @ 1.10 kg per mtr. = 2.31 kg
Add 5% wastage = 0.12 kg
@ Rs. 30.50 per kg + 4% ST Rs. 77.08
3. M.S. angle iron 50 x 50 x 6 mm for leg post
Total length = 4.00 Mtr
M.S leg = 4.30 Mtr
= 4.30 Mtr
Wt. @ 4.50 kg per mtr. = 19.35kg
Add 5% wastage = 0.97 kg
= 20.32 kg
@ Rs. 30.50 per kg + 4% ST Rs. 644.55
4. Fabrication charges i.e. cutting straightening
drilling, rivetting, welding and cost of nuts
and bolts etc.
1.47+2.31+19.35 = 23.13kg
@ Rs. 7.00 per kg Rs. 161.91
5. Painting two coats with one coat of primer coat
(ch. 16.9 & 16.11)
leg post 2 x 4 x (0.05+0.05) = 0.80 Sqm
@ Rs. 9.70 + 425% CP = 50.93 per sqm Rs. 40.74
6. Retro reflecting sheeting (high intensity) consisting
of transparent shericallanes elements for permanent
road signing giving reflectivly and retro reflectance
with superior angulantry under all weather conditions
Base sheet = .27 Sqm
Signage = 0.13 Sqm
Add wastage 5% = 0.02 Sqm
Total = 0.42 Sqm
@ Rs. 3500.00 per Sqm = Rs. 1470.00
7. Heat treatment process designing processing
placing & finishing or retro reflective sheeting
for permanent road signing on the substrate of
board by computor plotter Area = 0.13 Sqm
@ Rs. 1300.00 per Sqm Rs. 390.00
8. Transporation & packing by comugated sheet
and plastic sheet charge. L.S. Rs. 60.00
9. Fixing charges
a Excavation of earth for fixing of boards Qty.
0.60 x 0.60 x 0.60 m = 0.216 Cum
@ Rs. 686+480% CP = 3978.80 per %cum Rs. .5.59
b Providing and laying RCC 1:2:4 for fixing of board
0.60 x 0.60 x 0.60 m = 0.216 Cum
@ Rs. 447+385% CP = 2167.95 cum Rs. 468.27
Rs. 476.86
Total for item 1 to 9 Rs. 3553.37
Add 10% contractor profit
on item No. 1 to 9 except item 5 to 9 i.e. Rs. 7275.35 Rs. 303.57
Total Rs. 3856.94
Say Rs. 3857.00

Executive Engineer
Const. Divn. PWD B&R
Barnala
Analysis of rate for supplying and fixing board 1200 x 900 rectangular plate made up of 2mm thick
aluminum sheet fixed on L-Iron 50x50x6mm with retro reflective sheeting (High Intensity)
-------------------------------------------------------------------------------------------------------------------------------------
-
1. Supply of 2 mm thick aluminum sheet
Area of sheet 4’ x 3’ = 12.00
Wt. of sheet @ 1.11 lbs / sft = 13.32 lbs or = 6.05 kg
Add wastage 5% = 0.30 kg
= 6.35 kg
@ Rs. 240 + 4% Vat = 249.60 Rs. 1585.00
2. Angle iron of size 25 x 25 x 3 mm for back
circular and indication sheet
2 (1.80+1.20) = 6.00 Mtr
Wt. @ 1.10 kg per mtr. = 6.60 kg
Add 5% wastage = 0.33 kg
= 6.93 kg
@ Rs. 48.50 + 4% Vat = 50.44 Rs. 350.00
3. M.S. angle iron 50 x 50 x 6 mm for leg post
Leg post 2x4.00 = 8.00 Mtr
Hold fast = 0.60 Mtr
= 8.60 Mtr
Wt. @ 4.50 kg per mtr. = 38.70 kg
Add 5% wastage = 1.94 kg
= 40.64 kg
@ Rs. 48.50 + 4% Vat = 50.44 Rs. 2050.00
4. Fabrication charges i.e. cutting straightening
drilling, rivetting, welding and cost of nuts
and bolts etc.
6.05+6.60+38.70 = 51.35 kg
@ Rs. 8.00 per kg Rs. 411.00
5. Painting two coats with one coat of primer coat
leg post 2 x 2 x 4(0.05+0.05) = 1.60 Sqm
@ Rs. 59.00 per sqm Rs. 94.00
Primer coat Rs. 35.00
6. Retro reflecting (high intensity) prismatic sheeting consisting
of transparent sphericallenes elements for permanent
road sighting giving reflectivity and retro reflectance
with superior angularity under all weather conditions
Base sheet 1.20 x 0.90 = 1.08 Sqm
Border 2(1.20+0.90) x 0.05 = 0.21 Sqm
Name of vill in english & punjabi av. 50% of area = 0.645 Sqm
= 1.935 sqm
Add wastage 5% = 0.096 Sqm
Total = 2.031 Sqm
@ Rs. 6800.00 + 4% Vat = 7072.00 Rs. 14363.00

7. Heat treatment process designing processing


placing & finishing or retro reflective sheeting
for permanent road signing on the substrate of
board by computor plotter
Area = 1.935 Sqm
@ Rs. 1300.00 + 4% Vat = 1352.00 Rs. 2616.00
8. Transportation & packing by comugated sheet
and plastic sheet charge. L.S. Rs. 150.00
9. Fixing charges
a Excavation of earth for fixing of boards Qty.
0.60 x 0.60 x 0.60 m = 0.216 Cum
@ Rs. 90.00 Rs. 19.00
b Providing and laying RCC 1:2:4 for fixing of board
0.60 x 0.60 x 0.60 m = 0.216 Cum
@ Rs. 3449/- per cum Rs. 745.00
c. Labour for erection
Masson ¼ @ Rs. 170.00 Rs. 43.00
Helper ¼ @ Rs. 136.00 Rs. 34.00
Rs. 879.00
` Cost for two leg post Rs 1758.00
Add 10% contractor profit
on item No. 1 to 4,6,7&8 i.e. Rs. 21525.00 Rs. 2153.00
Total Rs. 25527.00
Say Rs. 25500.00

Executive Engineer
Const. Divn. PWD B&R
Malerkotla

Analysis of rate for providing and fixing single legged cautionary board made up of 2mm thick
aluminum sheet of size 900x900x900mm with retro reflective sheeting (high intensity)
-------------------------------------------------------------------------------------------------------------------------------------
-
1. Supply of 2 mm thick aluminum sheet
Triangle 0.90x0.90x0.90 2 x ½ x 0.45 x 0.78 = 0.351 Sqm

Indication sheet 0.60 x 0.20 = 1.200 Sqm

= 1.551Sqm

Wt. of sheet @ 1.11 lbs / sft = 5.63 lbs or = 2.55 kg

Add wastage 5% = 0.13 kg

= 2.68 kg

@ Rs. 190.00 per kg + 4% ST Rs. 530.00

2. Angle iron of size 25 x 25 x 3 mm for back

circular and indication sheet

Triangle 0.85+0.85+0.85+0.75 = 3.30 Mtr

Indication sheet 2 (0.60+0.20) = 1.60 Mtr

= 4.90 Mtr

Wt. @ 1.10 kg per mtr. = 5.39 kg

Add 5% wastage = 0.27 kg

= 5.66 kg

@ Rs. 45.00 per kg + 4% ST Rs. 265.00

3. M.S. angle iron 50 x 50 x 6 mm for leg post

Leg post = 4.00 Mtr

Hold fast = 0.30 Mtr

= 4.30 Mtr

Wt. @ 4.50 kg per mtr. = 19.35 kg

Add 5% wastage = 0.97 kg

@ Rs. 45.00 per kg + 4% ST = 20.32 kg Rs. 951.00

4. Fabrication charges i.e. cutting straightening

drilling, rivetting, welding and cost of nuts

and bolts etc.

2.55+5.39+19.35 = 27.29 kg

@ Rs. 7.00 per kg Rs. 191.00

5. Painting two coats with one coat of primer coat

leg post 2 x 2 x 4(0.05+0.05) = 1.80 Sqm

@ Rs. 59.00per sqm Rs. 106.00

Primer coat Rs. 35.00


6. Retro reflecting (high intensity) prismatic sheeting consisting

of transparent sphericallenes elements for permanent

road sighting giving reflectivity and retro reflectance

with superior angularity under all weather conditions

Base sheet = 0.351 Sqm

Border 0.07x2.70 = 0.189 Sqm

Road Sign = 0.040 Sqm

Indication plate = 0.120 Sqm

Indication sign = 0.020 Sqm

= 0.720 Sqm

Add wastage 5% = 0.036 Sqm

Total = 0.756 Sqm

@ Rs. 6500.00per Sqm = Rs. 4914.00

7. Heat treatment process designing processing

placing & finishing or retro reflective sheeting

for permanent road signing on the substrate of

board by computor plotter

Area of triangle and indication plate = 0.470 Sqm

@ Rs. 1300.00 per Sqm Rs. 611.00

8. Transporation & packing by comugated sheet

and plastic sheet charge. L.S. Rs. 150.00

9. Fixing charges

a Excavation of earth for fixing of boards Qty.

0.60 x 0.60 x 0.60 m = 0.216 Cum

@ Rs. 90.00 per sqm Rs. 19.00

b Providing and laying RCC 1:2:4 for fixing of board

0.60 x 0.60 x 0.60 m = 0.216 Cum

@ Rs. 3449 per cum Rs. 745.00

c. Labour for erection

Masson ¼ @ Rs. 170.00 Rs. 43.00

Helper ¼ @ Rs. 136.00 Rs. 34.00


Total for item 1 to 9 = Rs. 8632.00

Add 10% contractor profit on item 1 to 8 i.e. Rs. 7714/- Rs. 771.00
Add 10% over head charges i.e. Rs. 8556/- Rs. 856.00

Total Rs. 10221.00

Say Rs. 10200.00

Executive Engineer
Const. Divn. PWD B&R
Malekotla
Analysis of rate for marking of centre line, zebra line with thermoplastic paint
as per MORT&H specifications.
-----------------------------------------

1. Material
thermoplastic paint
5.50 kg @ Rs. 75.00 Per kg 412.50

2. Drops of glass beeds for indication reflection


0.25 kg@ Rs. 90.00 Per kg 22.50

Total 435.00

Add 2% wastage 8.12

Labour charges with machinery L.S. 60.00

Handling charges L.S. 15.00

Carriage of material from market to site of work 15.00

Total 533.12

Add 10% contractor profit 53.31

Total 586.43
Say Rs. 586.00

Executive Engineer