0% found this document useful (0 votes)
8 views

Knowledge groups

Uploaded by

cosmicriot69
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
8 views

Knowledge groups

Uploaded by

cosmicriot69
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Project Management Process Groups

Knowledge Initiating Planning Executing Monitoring and Closing


Areas Controlling
Integration 4.1 Develop 4.2 Develop Project 4.3 Direct and • 4.4 Monitor and 4.6 Close Project
Project Charter Management Plan Manage Project Work control Project or Phase
Work
• 4.5 Perform
integrated
Change Control
Scope • 5.1 Plan Scope Activity Cost Estimate Deliverables Status Change Log
Management
• 5.2 Collect
Requirements
• 5.3 Define Scope
• 5.4 Create WBS
Time • 6.1 Plan Schedule 6.7 Control Schedule
Management
• 6.2 Define Activities
• 6.3 Sequence
Activities
• 6.4 Estimate Activity
Resources
• 6.5 Estimate
Activities Durations
• 6.6 Develop
Schedule
Cost • 7.1 Plan Cost 7.4 Control Cost
Management
• 7.2 Estimate Costs
• 7.3 Determine
Budget
Quality 8.1 Plan Quality 8.2 Perform Quality 8.3 Control Quality
Management Assurance
Human 9.1 Plan Human Resource • 9.2 Acquire
Resources Management Project Team
• 9.3 Develop
Project Team
• 9.4 Manage
Project Team
Communication 10.1 Plan Communication 10.2 Manage 10.3 Control
Management Communication Communication
Risk • 11.1 Plan Risk 11.6 Control Risks
Management
• 11.2 Identify Risks
• 11.3 Perform
Qualitative Risk
analysis
• 11.4 Perform
Quantitative Risk
• 11.4 Plan Risk
Progress
Procurement 12.1 Plan Procurement 12.2 Conduct 12.3 Control 12.4 Close
Management Procurement Procurement Procurement
Stakeholder 13.1 Identify 13.2 Plan Stakeholder 13.3 Manage 13.4 Control
Stakeholders Management Stakeholder Stakeholder
Engagement Engagement
Processes 2 24 8 11 2