0% found this document useful (0 votes)
24 views

13-MAR Form

MAR Form
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
24 views

13-MAR Form

MAR Form
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 2

Consultant Other Name of Other Consultant

Logo Consultant
Logo
PROJECT Logo

MATERIAL APPROVAL SUBMITTAL FORM – (MAR)


Project No.:

TITLE: SUBMITTAL NO.: Name of Project-Uecc- Code of


Form -Arch or Mech or Elect
Str-Spec-Serial
TO: DATE: 01 Jan,2018
FROM: Mr. REVISION NO: 00
ATTN.: Mr. C/REF.:
MATERIAL SUBMISSION DESCRIPTION
Discipline:

Description of Material
BOQ Ref
Manufacturer (Name & Address)
Supplier / Local Agent
Description of Attachments
Description of Samples
Specification Comparison Sheet
Location to Use ……………………………………………………………………..
Purpose for Use
Comparison in case of Alternative Submittal
CONTRACTOR SIGNATURE: Date: Month 00th. 2017
PMC RECEIVE: CONSULTANT RETURNED FROM CONTRACTOR RECEIVE
RECEIVE CONSULTANT:

PROJECT MANAGEMENT CONSULTANT’S REVIEW

Name: Signature: Date:


EMPLOYER’S COMMENTS (optional)

Name: Signature: Date:

SUPERVISION CONSULTANT’S COMMENTS

Document Control & Archiving Procedures


Name of Project Page 1 of 2 Document No: Code no-name of project - 13 - Rev.0
Revision Date: Jan-17
Consultant Other Name of Other Consultant
Logo Consultant
Logo
PROJECT Logo

MATERIAL APPROVAL SUBMITTAL FORM – (MAR)


Project No.:

TITLE: SUBMITTAL NO.: Name of Project-Uecc- Code of


Form -Arch or Mech or Elect
Str-Spec-Serial
TO: DATE: 01 Jan,2018
FROM: Mr. REVISION NO: 00
ATTN.: Mr. C/REF.:

A-APPROVED B –APPROVED AS NOTED, WORK MAY C- REVISE / RESUBMIT D- REJECTED


PROCEED – INCORPORATE COMMENTS
SUPERVISION CONSULTANT RESIDENT ENGINEER’S SIGNATURE
For & On behalf of (Insert Name of Supervision Consultant)

Name: Signature: Date:

Document Control & Archiving Procedures


Name of Project Page 2 of 2 Document No: Code no-name of project - 13 - Rev.0