0% found this document useful (0 votes)
6 views

07_06_2024_IR_2.0

Uploaded by

Chandra Kiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
6 views

07_06_2024_IR_2.0

Uploaded by

Chandra Kiran
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

Civil Mech ✔

Arch EL

ID PL

WORK INSPECTION REQUEST - 2.0

Project : CREEK VISTAS GRANDE WIR. No. : WIR-CVG-MEP-AC-1705


Client : PNC INVESTMETS Rev. No. : 02
Consultant : PNC ARCHITECTS Date : 06/07/2024
Contractor : Sobha Constructions LLC Remarks :
Subcontractor : Sobha constructions LLC - MEP
Details of Scheduled Inspection
Description : Inspection request for pressure testing of chilled water circuit -1 piping ( direct and main riser)
from basement to L-23 HEX primary side till bypass.
Scheduled Date : 06/07/2024 Scheduled Time : 3:00 PM
Building / Area : Loop 1 Level / Floor : Basement to L-23
Spec. / Dwg Ref. : As Attached Location : Basement

Confirmation of Contractor's Q.C Inspection


We confirm that the item offered for inspection is in complaince with the Specification, IFC, Method Statement
and Local Authorities regulations as per attached check list. No NCR's related to the subject work are open as on date.

QA/QC Engineer : Signature : Date 06/07/2024

Inspection Requested by Kiran


: Date 06/07/2024

Consultant's Comments

*No pressure drop noticed.


*Refer attached installation approval.
*Approval subject to Flushing , water balancing , AHJ.

A- Approved ✔ B- Approved As Noted C- Not Approved (Resubmit) D- Rejected

Name : Anoop Position : Sr Mech Eng Signature : Date : 8-7-24

Employer's Comments

A- Approved B- Approved As Noted C- Not Approved (Resubmit) D- Rejected

Name : Position : Signature : Date :

1- Contractor to mark all relevant technical description in the literature.


2- Approval shall not relieve Contractor of his liabilities under the Contract or consititute authorization of any change to contract documents.
3- Contractor should certify that the above submited items have been reviewed in details and are correct and in strict conformity with the contract drawings and
specifications except as otherwise stated.

FS/CO/14/02

Page 1 of 1