Civil Mech ✔
Arch EL
ID PL
WORK INSPECTION REQUEST - 2.0
Project : CREEK VISTAS GRANDE WIR. No. : WIR-CVG-MEP-AC-1705
Client : PNC INVESTMETS Rev. No. : 02 Consultant : PNC ARCHITECTS Date : 06/07/2024 Contractor : Sobha Constructions LLC Remarks : Subcontractor : Sobha constructions LLC - MEP Details of Scheduled Inspection Description : Inspection request for pressure testing of chilled water circuit -1 piping ( direct and main riser) from basement to L-23 HEX primary side till bypass. Scheduled Date : 06/07/2024 Scheduled Time : 3:00 PM Building / Area : Loop 1 Level / Floor : Basement to L-23 Spec. / Dwg Ref. : As Attached Location : Basement
Confirmation of Contractor's Q.C Inspection
We confirm that the item offered for inspection is in complaince with the Specification, IFC, Method Statement and Local Authorities regulations as per attached check list. No NCR's related to the subject work are open as on date.
QA/QC Engineer : Signature : Date 06/07/2024
Inspection Requested by Kiran
: Date 06/07/2024
Consultant's Comments
*No pressure drop noticed.
*Refer attached installation approval. *Approval subject to Flushing , water balancing , AHJ.
A- Approved ✔ B- Approved As Noted C- Not Approved (Resubmit) D- Rejected
Name : Anoop Position : Sr Mech Eng Signature : Date : 8-7-24
Employer's Comments
A- Approved B- Approved As Noted C- Not Approved (Resubmit) D- Rejected
Name : Position : Signature : Date :
1- Contractor to mark all relevant technical description in the literature.
2- Approval shall not relieve Contractor of his liabilities under the Contract or consititute authorization of any change to contract documents. 3- Contractor should certify that the above submited items have been reviewed in details and are correct and in strict conformity with the contract drawings and specifications except as otherwise stated.