0% found this document useful (0 votes)
21 views

BEAM CS-SHEET-3-modified

Beam cs sheet

Uploaded by

praveen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views

BEAM CS-SHEET-3-modified

Beam cs sheet

Uploaded by

praveen
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

B C D F G

NOTES:
300 300 600 300 600 300 300
6700 3000 4151 3600 3600 3150 1) PLEASE DO NOT SCALE OUT
200 200
1647 THIS DRAWING FOLLOW ONLY
3-T20 FIGURED DIMENSIONS.
2-T12
2) ANY DISCREPANCY IN THE
DWG. MUST BE BROUGHT TO THE
NOTICE OF STRUCTURAL
3-T20 2-T12 ENGINEER BEFORE EXECUTION
46-2L-T8 21-2L-T8 29-2L-T8 25-2L-T8 25-2L-T8 22-2L-T8 12-2L-T8 OF WORK .
@150 C/C @150 C/C @150 C/C @150 C/C @150 C/C @150 C/C @150 C/C
3) MIX OF CONCRETE M25 &
B51:300x600 B52:300x600 B53:300x600 B54:300x600 B55:300x600 B56:300x600 B84:200x450 GRADE OF STEEL FE-500
4) CLEAR COVER FOR MAIN
J K M N O
REINFORCEMENT :
B A) BEAMS = 25MM.
300 600 300 600 300 300
3500 3800 5004 4695 4300 300
6700
300 B) SLABS = 20MM.
1255 1175 1080
5) REFER THIS DWG. WITH
2-T20 RELEVANT ARCHITECTURAL
3-T16
DWG.
6) FOR FOOTINGS AND
COLUMNS DRAWINGS REFER
2-T16 RELEVANT DRAWINGS.
3-T20
25-2L-T8 27-2L-T8 35-2L-T8 33-2L-T8 30-2L-T8
1120 1120
@150 C/C @150 C/C @150 C/C @150 C/C @150 C/C 7) LAP LENGTHS FOR COLUMNS
46-2L-T8
B57:300x600 B58:300x600 B59:300x600 B60:300x600 B61:300x600 @150 C/C
48 X DIA OF BARS BEAMS & SLABS
55 X DIA OF BARS.
B63:300x600
8) LAPS SHOULD BE
A B C D F G
STAGGERED & SHOULD NOT BE
6 MORE THAN 50% AT ANY
300 300 600 300 600 300 300 300 300 LOCATION.
6700 3000 4151 3600 3600 3150 5047

3-T20 9) 'T' INDICATES HIGH


2-T12
2-T12 STRENGTH DEFORMED BARS(FE
1-T12EF 1-T12EF 1-T12EF 1-T12EF 1-T12EF 1-T12EF
500) STRICTLY CONFORMING TO
SPECIFICATIONS IN I.S.1786-2008.
2-T12
3-T20
10) THE BUILDING FLOOR IS
35-2L-T8
46-2L-T8 21-2L-T8 20-2L-T8 14-2L-T8 11-2L-T8 16-2L-T8 17-2L-T8 10-2L-T8 22-2L-T8 DESIGNED AS PER RELEVANT I.S
@150 C/C
@150 C/C @150 C/C @150 C/C @100 C/C @125 C/C @150 C/C @150 C/C @125 C/C @150 C/C
CODES.
1384 2400 1200 B85:200x450
11) PRECAUTION TO BE TAKEN
B64:300x600 B65:300x600 B66:300x600 B67:300x600 B68:300x600 B69:300x600 WHILE EXECUTING WORK ON
SITE FOR SAFETY
J K M N O 1 2 3
.
300 600 300 600 300 300 600 600 300
12) ALL DIMENSIONS ARE IN MM
3500 3800 5004 4695 4300 6100 3000
1255 1175 1080 1530 1530 985
SEAL / STAMP
3-T20 3-T20
2-T20 2-T20 2-T20 2-T20

1-T12EF 1-T12EF 1-T12EF 1-T12EF 1-T12EF

3-T20 3-T20

11-2L-T8 16-2L-T8 18-2L-T8 11-2L-T8 24-2L-T8 11-2L-T8 15-2L-T8 22-2L-T8 21-2L-T8 21-2L-T8 12-2L-T8 42-2L-T8 21-2L-T8
@125 C/C @150 C/C @150 C/C @125 C/C @75 C/C @150 C/C @125 C/C @150 C/C @75 C/C @150 C/C @125 C/C @150 C/C @150 C/C
2333 1267 1668 1668 1565 1433 SL.
B102:300x600 B103:300x600 NO.
REVISION DATE
B70:300x600 B71:300x600 B72:300x600 B73:300x600 B74:300x600

1 3 4

600 600 600 600 300


2750 6350 4056 4286
785 785 1590 1590 1015 1015 1075 1075
1 2 3

4-T16 600 600 300


6100 3000
2-T12 2-T16 2-T16 2-T12 2-T12
1530 1530 985
1-T10EF 1-T10EF 1-T10EF 1-T10EF 3-T20
2-T20 2-T20
BRUHAT BENGALURU MAHANAGARA PALIKE
2-T16 2-T16 2-T12 2-T12
3-T16
785 785 1060 1060 1015 1015 785 785
3-T20
PROJECT TITLE :
20-2L-T8 18-2L-T8 29-2L-T8 29-2L-T8 21-2L-T8 12-2L-T8
@150 C/C @125 C/C @150 C/C @150 C/C @150 C/C @125 C/C 42-2L-T8 21-2L-T8
CONSTRUCTION OF BBMP
4233 1429 @150 C/C @150 C/C GIRL'S PU COLLEGE AT
B75:300x600 B76:300x600 B77:300x600 B78:300x600 B113:300x600 B114:300x600 AUSTIN TOWN

6 7 9 11 12
1 2 3
STRUCTURAL CONSULTANTS :
300 300 600 300 600 600
5047 3350 3450 5882 4152
300 300 300
1265 1265 840 865 1475 1475 1040 1040 6700 3000
1680 1680 985
4-T16
2-T12 2-T12 2-T16 2-T16 2-T12 3-T20
2-T20 2-T20
1-T10EF 1-T10EF 1-T10EF 1-T10EF 1-T10EF

2-T12 2-T12 2-T12 2-T16 2-T12


3-T16 3-T20
1265 1265 840 840 865 865 985 985 1040 1040
46-2L-T8 21-2L-T8
35-2L-T8 10-2L-T8 15-2L-T8 24-2L-T8 28-2L-T8 32-2L-T8 20-2L-T8 14-2L-T8 DRAWING TITLE :
@150 C/C @150 C/C
@150 C/C @125 C/C @150 C/C @150 C/C @75 C/C @125 C/C @150 C/C @100 C/C
2233 3921 1384 B108:300x600 B109:300x600 SECOND FLOOR @7200MM
B79:300x600 B80:300x600 B81:300x600 B82:300x600 B83:300x600
BEAM DETAILS

CLIENT : BBMP
SCALE :
Contractor PMC AE (PC - ) AEE (PC - ) EE (PC - ) SE (Project Central) CE (Project Central) DEALT :
MKS
SHIVAKUMAR
CHECKED : TRIDHAMA
DWG NO: KAR/AT/SFB01/300724