0% found this document useful (0 votes)
10 views1 page

6.1

Uploaded by

zyad sabri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
10 views1 page

6.1

Uploaded by

zyad sabri
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8

Description Period Total


Forcasted demand Forecast 1200 1200 1400 3000 1200 1200 1200 1200 11600
Output 0
Regular Output Regular 1200 1200 1200 1200 1200 1200 1200 1200 9600

Worker Overtime Overtime 0 0 0 2000 0 0 2000


Outsourcing Subcontract
Output 2 0 0 0 0 0 0 0
The Output stored Forecast 0 0 -200 200 0 0 0 0 0
Inventory 0
Inventory at Period beginning Beginning 0 0 0 0 0 0 0 0 0
Inventory at Period Ending Ending 0 0 0 0 0 0 0 0 0
Average Inventory at each Period Average 0 0 0 0 0 0 0 0 0
demand couldn't Produce at time Backlog 0 0 200 0 0 0 0 0 200
Costs 0
Output 0
Regular Output cost Regular 4800 4800 4800 4800 4800 4800 4800 4800 38400
Cost produced at over time Overtime 0 0 0 10000 0 0 0 0 10000
Cost produced Outsource Subcontract 0 0 0 0 0 0 0 0 0
Cost of Hiring or Lay off Employe Hire/Lay off 0 0 100 0 0 0 0 0 100
Cost of storing Product at Inventory Inventory 0 0 0 0 0 0 0 0 0
Cost of Backlog Back orders 0 0 200 0 0 0 0 0 200
Total Cost Total 4800 4800 5100 14800 4800 4800 4800 4800 48700

You might also like