Time & Work Sheet
Time & Work Sheet
2. Nitesh does a certain work such that everyday his efficiency falls by 19% of that on
the previous day. If he manages to finish the whole work in 12 days, then find the
number of days in which he can complete another work which is 90% more than this
work and where his efficiency everyday falls by 10% of that on the previous day.
furs'k ,d fuf'pr dk;Z bl çdkj djrk gS fd çfrfnu mldh dk;Z{kerk fiNys fnu dh rqyuk esa 19»
de gks tkrh gSA ;fn og iwjs dke dks 12 fnuksa esa iwjk djus esa lQy gks tkrk gS] rks mu fn
Kkr djsa ftuesa og ,d vkSj dke iwjk dj ldrk gS tks bl dke ls 90» vf/d gS vkSj tgka mldh
çfrfnu dh n{krk fiNys fnu dh rqyuk esa 10» de gks tkrh gSA
(a) 24 (b) 19 (c) 18 (d) 20
1
3. A and B can do a certain work in 18 days and 30 days, respectively. They work together
for 5 days. C alone completes the remaining work in 15 days. A and C together can
complete 5/6th part of the same work in./A vkSjB ,d fuf'pr dk;Z dks Øe'k% 18 fnu vkSj
30 fnu esa iwjk dj ldrs gSaA os 5 fnuksa ds fy, lkFk dke djrs
C vdsyk
gSaA'ks"k dk;Z dks 15 fnuks
ds fy, ,d lkFk dke djrs gSaAC vdsyk 'ks"k d;Z dks 15 fnuksa esa iwjk A djrk
vkSj
gSA
C feydj
leku dk;Z ds 5@6 Hkkx dks fdrus le; esa iwjk dj ldrs gSA
(a) 6 days (b) 9 days (c) 8 days (d) 5 days
CGL (2021)
4. A and B can complete a work in 15 days and 10 days respectively. They started doing
the work together but after 4 days B had to leave. Then A working with a new worker
C completed the remaining work in 3 days. If C works alone, in how many days he can
do 40% of the same work./A vkSjB fdlh dk;Z dks Øe'k% 15 fnuksa vkSj 10 fnuksa esa iw
ldrs gSaA os ,d lkFk dk;Z djuk 'kq: djrs gSa] ysfdu 4 fnuBckn
dk;Z NksM+ nsrk gSA A u,fiQj
dkexkj C ds lkFk dk;Z djrs gq, 'ks"k dk;Z dks 3 fnu esa iwjk djrk CgSA
vdsys
;fndk;Z djrk gS]
rks og mlh dk;Z ds 40» Hkkx fdrus fnuksa esa iwjk dj ldrk gSA
(a) 9 (b) 10 (c) 8 (d) 8.5
2
5. A can complete a work in 20 days, while B can complete the same work in 25 days.
Both worked together for 10 days and than C alone completed the remaining work in
10 days. In how many days will A, B and C together complete the same work ?
A fdlh dk;Z dks 20 fnu esa dj ldrk gS] tcfd B mlh dk;Z dks 25 fnu esa dj ldrk gSA nksuk
,d lkFk feydj 10 fnu rd dk;Z djrs gSa vkSj fiQjC vdsys 'ks"k dk;Z dks 10 fnu esa iwjk djr
gSAA] B vkSjC ,d mlh dk;Z dks fdrus fnu esa iwjk djsaxs\
(a) 10 days (b) 5 days (c) 12 days (d) 8 days
CHSL (2021)
3
6. A and B can do a work in 10 days and 5 days, respectively. They worked together for
two days, after which B was replaced by C and the work was finished in the next three
days. How long will C alone take to finish 60% of the work ?
A vkSjB Øe'k% 10 fnuksa vkSj 5 fnuksa esa ,d dke dj ldrs gSaA mUgksus nks fnuksa rd ,
fd;k] ftlds ckn B dksC ls cny fn;k x;k vkSj vxys rhu fnuksa esa dke lekIr dj fn;k x;kA 60»
dke [kRe djus esaC dks fdruk le; yxsxk\
(a) 30 days (b) 18 days (c) 25 days (d) 24 days
SSC CPO (2020)
7. To do a certain work, the ratio of the efficiencies of A and B is 5 : 11. Working together,
1
they can do the same work in 27 days. A and B work together for 20 days. C alone
2
completes the remaining work in 16 days. C alone can do 75% of the original work in
,d fuf'pr dk;Z dks djus ds fy, A vkSjB dh {kerkvksa dk vuqikr 5 % 11 gSA ,d lkFk dk;Z djr
1
gq,] o mlh dk;Z dks
27 fnuksa esa dj ldrs gSA
A vkSjB ,d lkFk 20 fnuksa rd dk;Z djrs gSaA
C
2
vdsys 'ks"k dk;Z dks 16 fnuksa esa iwjkC djrk
vdsysgSA
ewy dk;Z dk 75» Hkkx dks fdrus fnuksa esa
ldrk gS\
1 1
(a) 56 days (b) 44 days (c) 33 days (d) 49 days
2 2
4
8. P can finish a work in 18 days. When he had worked for 5 days, Q joined him. If both of
13
them together completed the remaining work in days, then in how many days can
5
2
Q alone finish 66 % of the same work ?/P ,d dk;Z dks 18 fnuksa esa iwjk dj ldrk gSA tc
3
13
mlus 5 fnu rd dke fd;k] rks Q mlds lkFk tqM+ x;kA ;fn nksuksa us feydj 'ks"k dk;Z
fnuksa
dks
5
2
esa iwjk fd;k] rks
Q vdsys mlh dk;Z dk66 % fdrus fnuksa esa iwjk dj ldrk gS\
3
(a) 5 (b) 2 (c) 4 (d) 3
CGL Mains (2022)
5
2
9. A and B can do a work in 26 days. B and C together can complete the same work in
3
48 days, while A and C together can complete the same work in 30 days. How long (in
days) will A alone take to complete 60% of the work ?
2
A vkSjB feydj ,d dke dks 26 fnuksa esa dj ldrs gSaA
B vkSjC feydj mlh dke dks 48 fnuksa
3
esa iwjk dj ldrs gSa] tcfdA vkSjC feydj mlh dke dks 30 fnuksa esa iwjk dj ldrs AgSaA
vdsys
mlh dke ds 60» Hkkx dks iwjk djus esa fdruk le; (fnuksa esa) ysxk\
(a) 20 (b) 32 (c) 24 (d) 36
CGL Mains (2022)
10. A and B undertake a project worth Rs. 36,000. A alone can do the work in 25 days. They
worked together for 5 days. For the next five days, B worked alone. After that, A substi-
tuted B and completed the remaining work in 5 days. The share of A in the earnings is:
A vkSjB 36]000 #i;s dh ,d ifj;kstuk 'kq: djrs gSaAA vdsys ml dk;Z dks 25 fnuksa esa iwjk d
ldrk gSA mUgksaus 5 fnuksa ds fy, ,d lkFk dke fd;kA vxys ikap fnuksa B usdsvdsys
fy,] dke
fd;kA mlds ckn]A us B dks çfrLFkkfir fd;k vkSj 'ks"k dk;Z dks 5 fnuksa esa iwjk fd;kA A de
dk fgLlk D;k gS\
(a) Rs. 21,600 (b) Rs. 14,400 (c) Rs. 14,600 (d) Rs. 21,400
6
11. A and B can complete a certain task in 24 days and 40 days, respectively. They worked
together for 8 days. C completed the remaining task in 14 days. Working together, A
and C will complete 75% of the same work in./A vkSjB fdlh dk;Z dks Øe'k% 24 fnu vkSj
40 fnu esa iwjk dj ldrs gSaA os ,d lkFk 8 fnu rd dk;Z djrsCgSaA
'ks"k dk;Z dks 14 fnu esa iwj
djrk gSA ,d lkFk dk;Z djrs gq,A vkSjC leku dk;Z dk 75» Hkkx fdrus fnu esa iwjk djsaxs\
(a) 15 days (b) 10 days (c) 12 days (d) 9 days
SSC CHSL (2021)
12. A and B can do a piece of work in 12.5 days and B and C can do the same work in 18.75
days and C and A can do the same work in 15 days. With the help of D who is 40%
efficient than C, in how many days will A, B,C and D do the work ?
A vkSjB ,d dke dks 12-5 fnuksa esa dj ldrs gS vkSj
B vkSjC mlh dke dks 18-75 fnuksa esa dj
ldrs gS vkSjC vkSjA mlh dke dks 15 fnuksa esa dj ldrs DgSaA
dh lgk;rk ls] tks C ls 40» dq'ky
gS]A, B, C vkSjD fdrus fnuksa esa dk;Z djsaxs\
1 2 7
(a) 9 (b) 9 (c) 10 (d) 9
3 3 27
7
13. A can complete 25% of a work in 15 days. He works for 15 days and then B alone
finishes the remaining work in 30 days. In how many days will A and B working to-
gether finish 50% of the same work?/A ,d dke dk 25» Hkkx 15 fnuksa esa iwjk dj ldrk gSA
mlus 15 fnuksa rd dke fd;k vkSj fiQj 'ks"k dke vdsys
B us 30 fnuksa esa iwjk A
fd;kA
vkSjB ,d
lkFk feydj dke djrs gq, ml dke dk 50» fdrus fnuksa esa iwjk djsaxs\
(a) 25 (b) 24 (c) 20 (d) 12
CGL Pre. (2024)
1
14. A can do 20% of a work in 4 days, B can do 33 % of the same work in 10 days. They
3
worked together for 9 days. C completed the remaining work in 6 days. B and C to-
8
gether will complete 75% of the same work in.
1
A fdlh dk;Z dk 20»] 4 fnu esa iwjk dj ldrk gS]B mlh dk;Z dks33 %] 10 fnu esa iwjk dj
3
ldrk gSA os 9 fnu ds fy, ,d lkFk dk;Z djrs gSA
C 'ks"k dk;Z dks 6 fnu esa iwjk djrk
C mlh
gSA
dk;Z dk 75» fdrus fnu esa iwjk djsxk\
(a) 18 days (b) 12 days (c) 15 days (d) 9 days
CGL Mains (2019)
40
15. Abha and Anuj together completed a work in days. If Abha had worked with twice
9
1
her actual efficiency and Anuj with of his actual efficiency, the work would have
e
3
16
been completed in days. Find how much time Abha alone would take to complete
e
17
40
the work./vkHkk vkSj vuqt us feydj ,d dk;Z dks fnuksa esa iwjk fd;kA ;fn vkHkk us v
9
okLrfod n{krk dh rqyuk esa nksxquh n{krk ls dk;Z fd;k gksrk vkSj vuqt us viuh okLrfod n
1 16
rqyuk esa n{krk ls dk;Z fd;k gksrk] rks dk;Z fnuksa esa iwjk gks tkrkA vkHkk }kjk vds
3 17
dks iwjk djus esa yxus okyk le; Kkr dhft,A
(a) 10 days (b) 6 days (c) 12 days (d) 8 days
SSC CGL T-1 (2022)
9
16. A can do 1/5 of a piece of work in 20 days, B can do 30% of the same work in 36 days,
while C can do 80% of the same work in 160 days. B and C together started and worked
for x days. After x days B left the work, and A joined C and both completed the re-
maining work in (x – 41) days. If the ratio between the work done by (B + C) together
and (A + C) together is 19 : 6, then how much of the same work can C alone complete
in 2x days ?
A fdlh dke dk 1@5 Hkkx 20 fnu esa dj ldrk gS] B mlh dke dk 30» 36 fnu esa dj ldrk
gS] tcfd C mlh dke dk 80» 160 fnu esa dj ldrk gSAB vkSjC us feydj dke 'kq: fd;k vkSj
x fnu rd dke fd;kA x fnu ckn B us dke NksM+ fn;k vkSj A] C ds lkFk 'kkfey gks x;k vkSj nksuk
us 'ks"k dke
(x– 41) fnu esa iwjk fd;kA ;fn
(B + C) }kjk ,d lkFk fd, x, dke vkSj (A + C) }kjk
,d lkFk fd, x, dke ds chp dk vuqikr 19 % 6 gS] rks C vdsys mlh dke dk fdruk fgLlk 2x
fnu esa iwjk dj ldrk gS\
6 57 13 19
(a) (b) (c) (d)
25 100 25 25
SSC CPO 2023
10
1
17. A can do 1/3 of a piece of work in 32 days, B can do 37 % of the same work in 24 days,
2
while C can do 60% of the same work in 48 days. B and C together started and worked
for x days. After x days, B left the work and A joined C and both completed the re-
maining work in (x + 8) days. If the ratio of the work done by (B + C) together to the
work done by (A + C) together is 9 : 11, then what fraction of the same work can be
completed by C alone in 3.5x days?/A fdlh dk;Z dk 1@3 Hkkx 32 fnuksa esa dj ldrkB gS]
1
mlh dk;Z dk37 % Hkkx 24 fnuksa esa dj ldrk gS] tcfd mlh dk;Z dk 60» Hkkx 48 fnuksa e
2
ldrk gSAB vkSjC us ,d lkFk dk;Z 'kq: fd;k vkSjx fnuksa rd dk;Z fd;kA x fnuksa ds ckn]
B us
dk;Z NksM+ fn;kAvkSj ] C esa 'kkfey gks x;k vkSj nksuksa us (x
'ks"k
+ 8)dk;Z
fnuksa esa iwjk fd;kA ;fn
(B + C) }kjk ,d lkFk fd, x, dk;Z dk (B + C) }kjk ,d lkFk fd, x, dk;Z ls vuqikr 9 % 11 gS]
rks mlh dk;Z dk fdruk Hkkx vdsys C }kjk 3-5x fnuksa esa iwjk fd;k tk ldrk gS\
18 4 7 7
(a) (b) (c) (d)
25 5 10 12
SSC CGL T-1 (2023)
18. P, Q and R, when working individually, can complete a job in, respectively, 36 days, 48
days and 144 days. P, Q and R start working together. P leaves the job 12 days before
completion and Q leaves the job 8 days before completion. R works from the begin-
ning till the end of the job. Determine the total number of days taken to complete the
job.
P, R vkSjR] tc O;fDrxr :i ls dk;Z djrs gSa] rks ,d dk;Z dks Øe'k% 36 fnu] 48 fnu vkSj 144
fnu esa iwjk dj ldrs gSaA
P] Q vkSjR ,d lkFk dke djuk 'kq: djrs gSaAP dke iwjk gksus ls 12 fnu
11
igys dke NksM+ nsrk gSQvkSj
dke iwjk gksus ls 8 fnu igys dke NksM+ nsrk
R dk;Z
gSAds vkjaHk ls
var rd dk;Z djrk gSA dk;Z iwjk djus esa yxus okys fnuksa dh dqy la[;k fu/kkZfjr djsaA
(a) 20 (b) 24 (c) 27 (d) 25
SSC CPO (2023)
19. Akshita and Raina are typing a book, but have only one laptop to work upon. They
decided that they will work on alternate basis such that Akshita works for the first
day, Raina works for the second day, Akshita for the third day and so on. Akshita alone
can finish the typing work in 16 days, while Raina will take 24 days if she works alone
on the entire book. How many days will they take to finish the typing work if they
work on alternate basis?
vf{krk vkSj jSuk ,d fdrkc Vkbi dj jgh gSa] ysfdu muds ikl dke djus ds fy, dsoy ,d ySiVkWi
gSA mUgksaus r; fd;k fd os ckjh&ckjh ls dke djsaxh] tSls fd vf{krk igys fnu dke djsxh] jS
fnu dke djsxh] vf{krk rhljs fnu dke djsxh vkSj blh rjg vkxs Hkh dke djsxhA vf{krk vds
Vkbfiax dk dke 16 fnuksa esa iwjk dj ldrh gS] tcfd jSuk dks iwjh fdrkc ij vdsys dke djus
24 fnu yxsaxsA vxj os ckjh&ckjh ls dke djsa rks mUgsa Vkbfiax dk dke iwjk djus esa fdru
(a) 19 (b) 15 (c) 17 (d) 18
SSC CPO (2023)
12
20. A and B complete a work in 24 and 30 days, respectively, working 10 hours per day.
The work is to be done in two shifts. The morning shift is for 6 hours and the evening
shift is for 4 hours. On the first day, A works in the morning and B works in the evening,
and they interchange their shifts every day. On which day did the work get completed?
A vkSjB çfrfnu 10 ?kaVs dke djds ,d dke dks Øe'k% 24 vkSj 30 fnuksa esa iwjk djrs gSaA
esa dke gksuk gS lqcg dh f'kÝV 6 ?kaVs vkSj 'kke dh f'kÝV 4 ?kaVs dh gksrh A lqcg
gSAdke
igys fn
djrk gS vkSjB 'kke dks dke djrk gS] vkSj os gj fnu viuh f'kÝV cnyrs gSaA dk;Z fdl fnu iw
gqvk\
(a) 24th day (b) 27th day (c) 30th day (d) 21st day
SSC CPO (2023)
21. A can complete a piece of work in 25 days while B can complete the same work in 30
days. They work on alternate basis, starting with A. Both A and B follow this pattern
for 5 days then A leaves the work. In how many days will B finish the remaining work?
A ,d dke dks 25 fnu esa iwjk dj ldrk gS tcfd B mlh dke dks 30 fnu esa iwjk dj ldrh gSA
os ,dkarj fnu ds vk/kj ij dke djrs gSa]A ls 'kq: djrs gSaA
A vkSjB nksuksa 5 fnu ds fy, bl rjhds
dk ikyu djrs gSa vkSj fiQj A dke NksM+ nsrkB gSA 'ks"k dk;Z dks fdrus fnu esa iwjk djsxk\
3 2 3 2
(a) 5 (b) 24 (c) 24 (d) 5
5 5 5 5
13
22. A can do a certain piece of work in 2.4 times the number of days in which B and C
together can do it. If A and B together can do the said piece of work in 27 days and C
alone can do it in 75 days, then how many days will B take to do this piece of work
al o n e ?/ A ,d fuf'pr dk;Z dks B vkSjC }kjk feydj fd, x, fnuksa dh rqyuk esa 2-4 xquk vf/
d fnuksa esa iwjk dj ldrk gSAA;fn vkSjB feydj ml dk;Z dks 27 fnuksa esa dj ldrs gSa CvkSj
vdsys ml dk;Z dks 75 fnuksa esa dj ldrk gS] B dks
rks vdsys bl dk;Z dks djus esa fdrus fnu yxsaxs
(a) 42 (b) 54 (c) 48 (d) 45
SSC CPO (2023)
14
23. A and B are equally efficient, and each can individually complete a piece of work in 36
days, if none takes any holiday. A and B started working together on this piece of
work, but A took a day off after every five days of work, while B took a day off after
every seven days of work. If the duo had started work on 1 July 2021, on which date
was the work completed?
A vkSjB leku :i ls dq'ky gSa] vkSj ;fn dksbZ Hkh Nqêh ugha ysrk gS] rks çR;sd O;fÙkxr
fnuksa esa ,d dke iwjk dj ldrk gSA
A vkSjB us bl dke ij ,d lkFk dke djuk 'kq: fd;k] ysfdu
A us gj ikap fnu ds dke ds ckn ,d fnu dh Nqêh yh] tcfd B us gj lkr fnu ds dke ds ckn
,d fnu dh Nqêh yhA ;fn nksuksa us 1 tqykbZ 2021 dks dke 'kq: fd;k Fkk] rks dke fdl rkjh
iwjk gqvk\
(a) 19 July 2021 (b) 20 July 2021 (c) 22 July 2021 (d) 21 July 2021
SSC CPO (2023)
24. To do a certain task X would take 3 times as long as Y and Z together; and Z would take
4 times as long as Y and X together. Three of them together can complete the task in
10 days. How much time is taken by X and Z to complete the task?
,d fuf'pr dke djus ds fy, X dks] mlh dke dksY vkSjZ dks ,d lkFk feydj djus esa yxs le;
ls 3 xquk le; yxrk gS vkSjZ dks]Y vkSjX dks ,d lkFk feydj djus esa yxs le; ls 4 xquk le;
yxrk gSA rhuksa feydj dke dks 10 fnuksa esa iwjk djXldrs vkSjgSaA
Z dks ,d lkFk feydj dke
iwjk djus esa fdruk le; yxsxk\
2 1 1 2
(a) 18 days (b) 20 days (c) 21 days (d) 22 days
9 9 9 9
SSC CPO (2022)
15
25. A group of men committed to completing a task in 20 days. The work was completed
in 40 days because 5 workers did not come for work. Determine the number of men
who originally agreed to do the work.
iq:"kksa dk ,d lewg ,d dk;Z dks 20 fnuksa esa iwjk djus ds fy, çfrc¼ gSA dke 40 fnuksa esa
x;k D;ksafd 5 deZpkjh dke ij ugha vk, FksA mu iq:"kksa dh la[;k fu/kkZfjr dhft, tks ewy
dke dks djus ds fy, lger gq, FksA
(a) 15 (b) 10 (c) 12 (d) 18
SSC CPO (2022)
26. A, B and C are 3 workers employed by a contractor they completed the whole work in
10 days, initially all of them worked together but the last 60% of work was completed
by B+C, A worked with B and C only for initial 2 days then he left the work also B takes
20% less time than C, if they were paid Rs. 3,000 for the entire work then what’s the
share of least efficient person ?
,d BsdsnkjA] B rFkkC dks dke ij yxkrk gSA os rhuksa ml dke dks nl fnu esa iwjk djrs gSA o
lkFk dke 'kq: djrs gS rFkk vafre 60» dke dks B + C djrs gSAA dsoy igys nks fnuB + C ds
lkFk dke djrk gS vkSj dke NksM+ nsrk B dke
gSA
djus esaC ls 20» de le; ysrk gSA ;fn iwjs dke
ds fy, 3000 #- feyrs gS rc lcls de dk;Z{kerk okys etnwj dk osru Kkr djsa\
16
(a) Rs. 400 (b) Rs. 700 (c) Rs. 1000 (d) Rs. 900
27. 24 men started the working on project and complete 40% of the work in 10 days work-
ing 8 hours a day. 24 women also joined the project after 15 days from the start of the
project. Find the total number of days taken to complete the whole work if efficiency
of women is half to that of men and women also worked 8 hours a day.
24 iq#"kksa us ifj;kstuk ij dke djuk 'kq: fd;k vkSj çfrfnu 8 ?kaVs dke djds 10 fnuksa esa 40
iwjk fd;kA ifj;kstuk 'kq: gksus ds 15 fnu ckn 24 efgyk,¡ Hkh ifj;kstuk esa 'kkfey gks x
efgykvksa dh n{krk iq#"kksa dh rqyuk esa vk/kh gS vkSj efgyk,¡ Hkh çfrfnu 8 ?kaVs dke
dke dks iwjk djus esa yxs fnuksa dh dqy la[;k Kkr dhft,A
70 65
(a) 21 days (b) days (c) days (d) 23 days
3 3
17
28. A, B and C can do a certain piece of work in 32, 24 and 28 days respectively. They
started working together but after ‘x’ days A left the job and ‘x + 1’ days before
completion of the work B also left. Find the value of x² – 2x + 20 if the whole work is
completion in 4x – 2 days./A] B vkSjC fdlh dke dks Øe'k% 32] 24 vkSj 28 fnuksa esa iw
dj ldrs gSaA mUgksaus lkFk feydj dke djuk 'kq: fd;k ysfdu x* fnu
^ ckn A us dke NksM+ fn;k
vkSj dke iwjk gksusx +ls1^* fnu igys B Hkh pyk x;kA ;fn iwjk dke
4x – 2 fnuksa esa iwjk gks tk
gS] rks
x² – 2x + 20 dk eku Kkr dhft,A
(a) 23 (b) 28 (c) 35 (d) 44
29. Three persons A, B and C can complete 11.11%, 5% and 6.66% of a work in one day. In
how many days the work will be completed if all three work together ?
rhu O;fDrA] B vkSjC ,d fnu esa fdlh dke dk 11-11»] 5» vkSj 6-66» iwjk dj ldrs gSaA ;fn
rhuksa feydj dke djsa rks dke fdrus fnuksa esa iwjk gks tk,xk\
14 11 16 13
(a) 4 days (b) 4 days (c) 4 days (d) 4 days
39 39 41 41
18
30. A and C can build a wall in 9 days and 8 days respectively, while B can destroy the
whole wall in 10 days. If A works with C on first day, what is the number of days re-
quired to build the wall if A is joined by B and C on alternate days?
A vkSjC ,d nhokj dks Øe'k% 9 fnu vkSj 8 fnu esa cuk ldrs gSa] tcfd B iwjh nhokj dks 10 fnu
esa u"V dj ldrk gSA ;fn
A igys fnu C ds lkFk dke djrk gS] rks nhokj cukus esa fdrus fnu yxsa
;fn A ds lkFkB vkSjC oSdfYid fnuksa esa tqM+rs gSa\
11 4 4 13
(a) 8 days (b) 8 days (c) 8 days (d) 8 days
85 85 89 89
31. A, B and C can paint a wall in 10 hours, 8 hours and 20 hours respectively. A and B start
painting the left half of the wall and C starts painting only right half of the wall. After
working 2 hours in this manner, only A paints left half of the wall while B and C starts
painting right half of the wall and thus they complete the work painting only their
side of the wall. What is the time difference between the completion of the left and
right half of the wall?/A] B vkSjC ,d nhokj dks Øe'k% 10 ?kaVs] 8 ?kaVs vkSj 20 ?kaVs e
ldrs gSaAA vkSjB nhokj ds ck,¡ vk/ks fgLls ij isafVax djuk 'kq: djrs gSa C nhokj
vkSj ds dsoy
nk,¡ vk/ks fgLls ij isafVax djuk 'kq: djrs gSaA bl rjg ls 2 ?kaVs dke djus ds ckn] A nhokj
dsoy
ds ck,a vk/ks fgLls dks isaV djrk gS tcfd
B vkSjC nhokj ds nkfgus vk/ks fgLls dks isaV djuk 'k
djrs gSa vkSj bl çdkj os nhokj ds dsoy vius fgLls dks isaV djus dk dke iwjk djrs gSaA nh
ck,¡ vkSj nk,¡ vk/ks Hkkx ds iwjk gksus ds chp fdrus le; dk varj gS\
2 9 11 11
(a) 1 hrs (b) 1 hrs (c) 1 hrs (d) 1 hrs
7 14 14 14
19
32. A and B alone can complete a work in 24 and 48 days, respectively. 50% of the work is
completed by C is 3x days and remaining work is completed by A and B working to-
gether in ‘x’ days, find the time taken by B and C to complete the work while working
together.
A vkSjB vdsys ,d dk;Z dks Øe'k% 24 vkSj 48 fnuksa esa iwjk dj ldrs gSaA dk;Z C }kjk
dk 50»
3x fnuksa esa iwjk fd;k tkrk gS vkSj 'ks"k
A vkSj
dk;Z
B }kjk ,d lkFk dk;Z djds 'x' fnuksa esa iwjk fd;k
tkrk gS]B vkSjC }kjk ,d lkFk dk;Z djrs gq, dk;Z dks iwjk djus esa fy;k x;k le; Kkr dhft,A
(a) 16 days (b) 24 days (c) 20 days (d) 18 days
20
33. For a particular work the efficiency of A is 66.67% more than that of B. If both of them
working together can complete 88.88% of work in 10 days, in how many days B alone
can complete the work?/fdlh fo'ks"k dk;Z ds fy,A dh n{krk B dh rqyuk esa 66-67» vf/d
gSA ;fn nksuksa ,d lkFk dke djrs gq, 88-88» dk;Z 10 fnuksa esa iwjk dj Bldrs vdsys
gSa]fdrus
rks
fnuksa esa dk;Z iwjk dj ldrk gS\
(a) 40 (b) 25 (c) 30 (d) 35
(e) N.O.T
21